MRT Pink Line
   HOME

TheInfoList



OR:

The MRT Pink Line is an elevated mass rapid transit
monorail A monorail (from "mono", meaning "one", and " rail") is a railway in which the track consists of a single rail or a beam. Colloquially, the term "monorail" is often used to describe any form of elevated rail or people mover. More accurat ...
train line under construction in
Bangkok Bangkok, officially known in Thai as Krung Thep Maha Nakhon and colloquially as Krung Thep, is the capital and most populous city of Thailand. The city occupies in the Chao Phraya River delta in central Thailand and has an estimated populati ...
and Nonthaburi Province, Thailand. The monorail line will be long and have 30 stations. It will run in the northern part of the city from the Nonthaburi Civic Center in Pak Kret District
Nonthaburi Nonthaburi ( th, นนทบุรี, ) is the principal city of the district and province of the same name in Thailand. On 15 February 1936, Nonthaburi town municipality (''thesaban mueang'') was established, which only covered Suan Yai ...
along the major east–west transport corridor of Chaeng Wattana and Ram Intra roads to terminate at Minburi District in east
Bangkok Bangkok, officially known in Thai as Krung Thep Maha Nakhon and colloquially as Krung Thep, is the capital and most populous city of Thailand. The city occupies in the Chao Phraya River delta in central Thailand and has an estimated populati ...
. The line is designed to link the northern areas of Bangkok and Nonthaburi by connecting with five mass transit lines. At Nonthaburi Civic Center the line interchanges with the
MRT Purple Line The MRT Purple line ( th, รถไฟฟ้ามหานคร สายสีม่วง) or MRT Chalong Ratchatham line ( th, รถไฟฟ้ามหานคร สายฉลองรัชธรรม) is Bangkok's fifth rapid tra ...
and the proposed
MRT Brown Line The MRT Brown Line is a 22.1 km rapid transit line in Bangkok, Thailand proposed monorail mass transit line from Nonthaburi Civic Centre, Nonthaburi Province to Lam Sali intersection, Bang Kapi District. 20 stations are proposed for the line ...
. The line also interchanges with the
SRT Dark Red Line The SRT Dark Red Line, or Thani Ratthaya Line ( th, รถไฟชานเมือง สายธานีรัถยา) is part of the SRT Red Line suburban railway system to serve the greater Bangkok Metropolitan Region running for 26& ...
, the
BTS Sukhumvit Line The Sukhumvit line ( th, รถไฟฟ้า สายสุขุมวิท) or Light Green line, is an elevated metro rail line of the BTS Skytrain in Bangkok, Thailand. From the central Siam Station, where it connects with the Silom Line, ...
and the planned BMA Grey Line. At the
Min Buri Min Buri ( th, มีนบุรี, ) is one of the 50 districts (''khet'') of Bangkok, Thailand. It is bounded by other Bangkok districts (from north clockwise): Khlong Sam Wa, Nong Chok, Lat Krabang, Saphan Sung, and Khan Na Yao. Min Buri is ...
terminus, the line interchanges with the under construction
MRT Orange Line The MRT Orange Line ( th, รถไฟฟ้ามหานคร สายสีส้ม) is a rapid transit line of the Mass Rapid Transit Authority of Thailand (MRTA) in the Bangkok Metropolitan Area, Thailand. When fully completed, the MRT O ...
. Construction of the MRT Pink Line began in December 2017. In October 2020, the BSR consortium stated that they aimed to open the first section of the Pink Line by October 2021, with services initially operating from Min Buri (PK30) to Government Complex (PK12). The complete line was originally set to be fully open by June 2022. However, the outbreak of COVID-19 in Bangkok and changes to station locations has delayed the opening date. On 24 September 2021, the MRTA Board granted a 290-day extension to the construction contract period. In November 2021, the MRTA Board approved a new phased opening of the line starting from August 2022. On 9 December 2021, daily testing conducted at a maximum speed of 25 km/h began on a short 4 km section of the line between the depot at Min Buri and Bang Chan station. After a period of 3 months, testing will be conducted at higher speeds and along a longer section of track. However, in mid April 2022 the acting Director-General of the Department of Rail Transport stated that the line would not begin full testing until September 2022 and that the first stage would not open until late December 2022. By the end of November 2022, construction progress is at 94.00%.https://web.facebook.com/photo.php?fbid=519556530198079&set=pb.100064312104693.-2207520000.&type=3 ''MRTA Press'', 8 December 2022 The line will open in two stages. *Phase 1: July 2023 - Min Buri (PK30) to Government Complex (PK12) (except Nopparat (PK26)) - 21 km (Control Group Public Trial Run) *Phase 2: August 2023 - Min Buri (PK30) to Nonthaburi Civic Center (PK01) - 34.5 km


Route Alignment

The line begins at Nonthaburi Civic Center near Khae Rai Junction, Nonthaburi Province, in the northwest of Greater
Bangkok Bangkok, officially known in Thai as Krung Thep Maha Nakhon and colloquially as Krung Thep, is the capital and most populous city of Thailand. The city occupies in the Chao Phraya River delta in central Thailand and has an estimated populati ...
. The line then heads north along Tiwanon Road to Pak Kret Intersection, Pak Kret District, before turning east to run along
Chaeng Watthana road Highway 304 is a national highway of Thailand, leading from the Bangkok suburb city of Pak Kret to Nakhon Ratchasima in the country's Northeast. It forms the main link between the eastern and northeastern regions, and is one of the major alt ...
. It interchanges with the
SRT Dark Red Line The SRT Dark Red Line, or Thani Ratthaya Line ( th, รถไฟชานเมือง สายธานีรัถยา) is part of the SRT Red Line suburban railway system to serve the greater Bangkok Metropolitan Region running for 26& ...
at Lak Si Station and passes over
Vibhavadi Rangsit Road Vibhavadi Rangsit Road ( th, ถนนวิภาวดีรังสิต, ) or Highway 31, often informally called Vibhavadi Road (), is a highway in Thailand. The road begins at Phaya Thai district in Bangkok and crosses Chatuchak, Lak ...
running east through the Ram Intra intersection and the Lak Si monument in Bang Khen District, where it crosses under the
BTS Sukhumvit Line The Sukhumvit line ( th, รถไฟฟ้า สายสุขุมวิท) or Light Green line, is an elevated metro rail line of the BTS Skytrain in Bangkok, Thailand. From the central Siam Station, where it connects with the Silom Line, ...
and interchanges with Wat Phra Sri Mahathat. The line then continues farther east along Ram Intra Road to the northeast of
Bangkok Bangkok, officially known in Thai as Krung Thep Maha Nakhon and colloquially as Krung Thep, is the capital and most populous city of Thailand. The city occupies in the Chao Phraya River delta in central Thailand and has an estimated populati ...
before terminating at
Min Buri Min Buri ( th, มีนบุรี, ) is one of the 50 districts (''khet'') of Bangkok, Thailand. It is bounded by other Bangkok districts (from north clockwise): Khlong Sam Wa, Nong Chok, Lat Krabang, Saphan Sung, and Khan Na Yao. Min Buri is ...
where it finally interchanges with the
MRT Orange Line The MRT Orange Line ( th, รถไฟฟ้ามหานคร สายสีส้ม) is a rapid transit line of the Mass Rapid Transit Authority of Thailand (MRTA) in the Bangkok Metropolitan Area, Thailand. When fully completed, the MRT O ...
at Min Buri station (OR28).


History

The MRT Pink Line was first proposed in 2005 by the
Office of Transport and Traffic Policy and Planning The Office of Transport and Traffic Policy and Planning or OTP ( th, สำนักงานนโยบายและแผนการขนส่งและจราจร) is a department of the Thai government, under the Ministry of Tran ...
as a heavy rail underground line. It was changed to a monorail line in 2008 to reduce construction costs. The director-general of the Office of Transport and Traffic Policy and Planning had previously stated in an interview that the Pink Line was considered a priority scheme to be completed by 2017–18, as it ran past the then recently opened Bangkok Government Complex. A review was undertaken in early 2012 to reconsider the heavy rail option, but cost restraints prevailed and the Office decided to continue with the monorail plan. The review of the line did result, however, in the addition of 6 new stations. The environmental impact assessment for the Pink Line was finalized in late 2012. In October 2012, members of the new government requested to extend the planned line east by 3.4 km beyond the Min Buri terminus to Nong Chok. However, this extension of the line was not approved. The expected cost of the line in 2012 with the additional 6 extra stations was 55 billion
baht The baht (; th, บาท, ; sign: ฿; code: THB) is the official currency of Thailand. It is divided into 100 ''satang'' (, ). The issuance of currency is the responsibility of the Bank of Thailand. SWIFT ranked the Thai baht as the 10th-m ...
. The MRT Pink line was due to be tendered in the third quarter of 2013 with construction due to commence in early 2014. However, delays in preparation of the tender in relation to the selection of monorail
rolling stock The term rolling stock in the rail transport industry refers to railway vehicles, including both powered and unpowered vehicles: for example, locomotives, freight and passenger cars (or coaches), and non-revenue cars. Passenger vehicles ca ...
and political protests resulting in a snap national election in early Feb 2014 further delayed the Pink Line tender. A coup in May 2014 resulted in a new military administration and the tender being deferred while a review of all mass transit projects was undertaken for a period of 18 months. The MRT Pink line tender was then changed to a PPP tender process which was not released until mid 2016. The BSR consortium consisting of
BTS Group Holdings BTS Group Holdings Public Company Limited (BTSG), formerly known as Tanayong Public Company Limited, is a public company in Thailand. It is the majority share holder of Bangkok Mass Transit System PCL (BTSC), the operator of the BTS Skytrain and ...
(75% majority stake) with Sino-Thai Engineering and Construction STEC, and Ratch Group (RATCH) won the bid in early December 2016 to construct and operate the MRT Pink Line. The BSR consortium won the bid for a 30-year concession operate the line and also won the bid to build and operate the
MRT Yellow Line The MRT Yellow Line is an elevated mass rapid transit line currently under construction in Bangkok and Samut Prakan Province, Thailand. The 30.4 km line will have 23 stations and cost 55 billion baht. The line was originally proposed in 2005 ...
. On 16 June 2017, contracts were signed by the BSR consortium with the
Mass Rapid Transit Authority of Thailand Mass Rapid Transit Authority of Thailand or MRTA ( th, การรถไฟฟ้าขนส่งมวลชนแห่งประเทศไทย) is a state enterprise under the Ministry of Transport of Thailand. It is responsible the ope ...
. The BSR established the Northern Bangkok Monorail Company Limited (NBM) to operate the line.


Construction Progress

Construction of the MRT Pink Line began in December 2017 with the BSR consortium establishing a number of preparation work sites and closing lanes along the east-west Chaeng Wattana-Ram Inthra corridor. By 30 September 2018, overall construction was 10.37% complete. Construction work on Tiwanon Road began at the end of October 2018 with the temporary closure of long stretches of the middle lanes between Khae Rai and Pak Kret intersections. Construction had progressed to 31.46% complete by the end of March 2019. By the end of July 2019, completion of civil constructions had further progressed to 40.13%. Overall construction was 48.15% complete at the end of November 2019. By the end of January 2020, construction had progressed to 51.96%. By the end of May 2020, construction had progressed to 58.78%. At the end of July 2020, construction had progressed to 61.83%. At the end of September 2020, construction was 66.31% complete. Construction was 70.32% complete by the end of December 2020. Construction progress was 74.14% complete by the end of February 2021. Construction progress was 77.57% complete by the end of April 2021. Construction progress was 83.40% by the end of October 2021. Construction progress was 84.45% by the end of November 2021. The terminus station at Nonthaburi Civic Center (PK01) has been moved 337m closer to the Esplanade at Khae Rai junction due to objections from civil servants working at the Nonthaburi provincial office who were concerned that their view of the outside would be obstructed. A new EIA was completed for the relocation but the new station location required Cabinet approval, causing delays to the opening of this section of the line. Nopparat station (PK26) has also been moved away from Nopparat Rajathanee hospital due to the construction of a new Department of Highways bridge. The Cabinet agreed to the amended EIA for the relocation of both stations on 20 October 2020. On 24 September, the MRTA Board granted a 290-day extension to the construction contract schedule due to station design changes at Noppharat Ratchathani station (PK26) due to a new overpass plan, the relocation of Nonthaburi Civic Center station (PK01) and a flood mitigation project by the Highway Department impacting on the construction timeline of Laksi District (PK13), Chaeng Watthana Government Complex (PK 12) and Chaeng Watthana 14 stations (PK 11). On 9 December 2021, daily testing conducted at a maximum speed of 25 km/h began on a short 4 km section of the line from the depot at Miniburi to Bang Chan station. After a period of 3 months, testing will be conducted at higher speeds along a longer section of the line. By the end of March 2022, construction progress is at 86.51%.


Muang Thong Thani Branch Line

In 2016, the BTSC received a fund for an extension to link Impact, Muang Thong Thani and the
Muang Thong Thani Muang Thong Thani ( th, เมืองทองธานี 'golden city') is a large real estate development in Pak Kret, a northern suburb city of Bangkok, in Thailand's Nonthaburi Province. It was mainly developed from the late 1980s by the B ...
condominium buildings from Bangkok Land Public Company Limited. Accordingly, the BSR joint venture proposed a 2.8 km, 2 station spur monorail route to link to Impact, Muang Thong Thani from Si Rat station. The two stations will be located adjacent to the Impact Challenger building near Muang Thong Thani Lake and the Impact Forum. In early August 2018, a second public hearing was conducted by the MRTA into the extension proposal. The spur line proposal required a new EIA, which was completed in August 2020. The proposal was then presented to the Cabinet for approval to commence construction before the end of 2020. On 22 October 2020, the National Environment Board chaired by the Deputy PM approved the EIA and the MRTA evaluated construction costs of the spur line with BSR, with the final proposal proposed to be presented to Cabinet for approval by the end of November 2020. On 9 February 2021, Cabinet approved the 2.8 km spur line which is expected to cost 3.37 billion baht. Construction of the spur line was due to commence in July 2021. However, due to COVID-19 outbreaks in greater Bangkok construction has been delayed until December 2021. The MRTA may also consider a further 2 km extension in the future from Muang Thong Thani to Tiwanon road.


Rolling stock

The BSR selected
Bombardier Innovia Monorail Innovia Monorail is a fully automated and driverless monorail system currently manufactured and marketed by Alstom as part of its Innovia series of fully automated transportation systems. Its straddle-beam design is based on the ALWEG monorai ...
300 rolling stock for the MRT Pink Line. The BSR announced that they will purchase 42 four-car sets to operate the line. The total order of 70 sets of trains for the MRT Pink and MRT Yellow lines will cost 50 billion baht. These trains will be manufactured by CRRC Puzhen Bombardier Transportation Systems (joint venture of
Bombardier Transportation Bombardier Transportation was a Canadian-German rolling stock and rail transport manufacturer, headquartered in Berlin, Germany. It was one of the world's largest companies in the rail vehicle and equipment manufacturing and servicing industry ...
and
CRRC Nanjing Puzhen CRRC Nanjing Puzhen () is a Chinese railway rolling stock manufacturer, based in Puzhen, Nanjing city. It is a subsidiary of CRRC. Nanjing Puzhen has supplied trains to Shanghai Metro Line 3 and Nanjing Metro in partnership with Alstom. Indi ...
) in
Wuhu Wuhu () is a prefecture-level city in southeastern Anhui province, China. Sitting on the southeast bank of the Yangtze River, Wuhu borders Xuancheng to the southeast, Chizhou and Tongling to the southwest, Hefei city to the northwest, Ma' ...
,
Anhui Anhui , (; formerly romanized as Anhwei) is a landlocked province of the People's Republic of China, part of the East China region. Its provincial capital and largest city is Hefei. The province is located across the basins of the Yangtze Riv ...
, China. The first set was shipped on 4 September 2020 and arrived in Thailand on 1 October at Laem Chabang port with a handover ceremony attended by the Thai Prime Minister, the Bangkok Mass Transit System PLC. (BTSC) Chairman, MRTA and the Canadian Ambassador to Thailand. By July 2021, 8 sets had been delivered and were being tested. All sets were due to be delivered by early 2022. However, as of mid April 2022 only 24 sets had been received and were progressively undergoing testing. The remaining sets are expected to be delivered by July 2022. Technical Characteristics * Low profile vehicles/low floor height above beam * Distinct sloped nose/end-cap * Inter-car walkthrough * Rubber-tires and permanent magnet motor *
Aluminum Aluminium (aluminum in American and Canadian English) is a chemical element with the symbol Al and atomic number 13. Aluminium has a density lower than those of other common metals, at approximately one third that of steel. It ha ...
body, steel underframe, composite end cap * 4 caer sets have a capacity of 24,100 pax p/h each way and 8 car sets a capacity of 49.600 pax p/h each way with a 75-second headway. *Innovia Monorails are all fully automated and are equipped with CITYFLO 650 communications-based train control for driverless operation to increase reliability, shorten head ways between trains and lower maintenance costs.


Guidebeams

The Bombardier Innovia Monorail 300 operates on a narrow, elevated guide beam. Pre-cast, post-tensioned guide beams are constructed at an off-site location and later installed on the system. The guide beams are 690mm wide. The Innovia Monorail 300 was designed to navigate curves as tight as 46 m and a maximum grade of 6%. Monorail switches will be either beam replacement or multi-position pivot switches. The system will have evacuation walkways down the entire length of the guide beam. These walkways will allow passengers to escape onboard hazards. These walkways will be used by the maintenance crew for repairs and general maintenance to the system.


List of stations

Originally, the line was designed with 24 stations, two of which with a
park and ride A park and ride, also known as incentive parking or a commuter lot, is a parking lot with public transport connections that allows commuters and other people heading to city centres to leave their vehicles and transfer to a bus, rail system ( ...
facility. However, six new stations were added in mid-2012 for a total of 30 stations.


Network Map


See also

*
Mass Rapid Transit Master Plan in Bangkok Metropolitan Region The Mass Rapid Transit Master Plan in Bangkok Metropolitan Region, or M-Map, is the latest version in a series of Thai government plans for the development of an urban rail transit network serving the Greater Bangkok area. It was drafted under th ...
*
MRT (Bangkok) The Metropolitan Rapid Transit or MRT is a mass rapid transit system serving the Bangkok Metropolitan Region in Thailand. The MRT system comprises two rapid transit lines, with a further three lines (one rapid transit line and two monorail line ...
*
MRT Blue Line The MRT Blue Line ( th, รถไฟฟ้า สายสีน้ำเงิน) or MRT Chaloem Ratchamongkon Line ( th, รถไฟฟ้ามหานคร สายเฉลิมรัชมงคล) is Bangkok's third rapid transit li ...
*
MRT Brown Line The MRT Brown Line is a 22.1 km rapid transit line in Bangkok, Thailand proposed monorail mass transit line from Nonthaburi Civic Centre, Nonthaburi Province to Lam Sali intersection, Bang Kapi District. 20 stations are proposed for the line ...
*
MRT Grey Line The BMA Grey Line (Watcharaphon - Thong Lo) is a planned monorail line in Bangkok, Thailand. The route would provide a vital north - south link for a distance of 16.25 km with 15 planned stations and is expected to cost 27 billion baht. The l ...
*
MRT Light Blue Line The Light Blue Line (Din Daeng – Sathon) is a planned monorail line to be built in Bangkok, Thailand. Its path runs along a north–south axis. This line would link the Din Daeng housing community areas, Bangkok City Hall 2, Makkasan Station ( ...
*
MRT Orange Line The MRT Orange Line ( th, รถไฟฟ้ามหานคร สายสีส้ม) is a rapid transit line of the Mass Rapid Transit Authority of Thailand (MRTA) in the Bangkok Metropolitan Area, Thailand. When fully completed, the MRT O ...
*
MRT Purple Line The MRT Purple line ( th, รถไฟฟ้ามหานคร สายสีม่วง) or MRT Chalong Ratchatham line ( th, รถไฟฟ้ามหานคร สายฉลองรัชธรรม) is Bangkok's fifth rapid tra ...
*
MRT Yellow Line The MRT Yellow Line is an elevated mass rapid transit line currently under construction in Bangkok and Samut Prakan Province, Thailand. The 30.4 km line will have 23 stations and cost 55 billion baht. The line was originally proposed in 2005 ...
*
BTS Skytrain The Bangkok Mass Transit System, commonly known as the BTS Skytrain ( th, รถไฟฟ้าบีทีเอส '' TS'), is an elevated rapid transit system in Bangkok, Thailand. It is operated by Bangkok Mass Transit System PCL (BTSC), a ...
*
BTS Sukhumvit Line The Sukhumvit line ( th, รถไฟฟ้า สายสุขุมวิท) or Light Green line, is an elevated metro rail line of the BTS Skytrain in Bangkok, Thailand. From the central Siam Station, where it connects with the Silom Line, ...
*
BTS Silom Line The BTS Silom line ( th, รถไฟฟ้า สายสีลม) or Dark Green line, is an elevated rapid transit line of the BTS Skytrain in Bangkok, Thailand. It is operated by Bangkok Mass Transit System PCL (BTSC), a subsidiary of BTS G ...
*
Airport Rail Link (Bangkok) The Airport Rail Link (ARL) ( th, รถไฟฟ้าแอร์พอร์ต เรล ลิงก์) is an express and commuter rail line in Bangkok, Thailand. The line provides an airport rail link from Suvarnabhumi Airport, via Makk ...
*
SRT Light Red Line The SRT Light Red Line, or Nakhon Withi Line ( th, รถไฟชานเมือง นครวิถี) is part of the SRT Red Lines suburban railway system serving the greater Bangkok Metropolitan Region running for 15 km between Kr ...
*
SRT Dark Red Line The SRT Dark Red Line, or Thani Ratthaya Line ( th, รถไฟชานเมือง สายธานีรัถยา) is part of the SRT Red Line suburban railway system to serve the greater Bangkok Metropolitan Region running for 26& ...
* Bangkok BRT *
BMA Gold Line The Gold Line is an automated people mover line, part of Bangkok's rapid transit system. The line is 1.72 km long, consisting of 3 stations, and was opened by Thai Prime Minister Prayut Chan-o-cha on 16 December 2020. It primarily serves as ...


References


External links


"MRTA Pink Line website"

"2Bangkok Pink Line thread"
Historical updates and articles (In English)


MRTA
{{DEFAULTSORT:Mrt Pink Line Pink line Proposed public transport in Thailand 2022 in rail transport Monorails in Thailand Monorails