The MRT Orange Line ( th, รถไฟฟ้ามหานคร สายสีส้ม) is a
rapid transit Rapid transit or mass rapid transit (MRT), also known as heavy rail or metro, is a type of high-capacity public transport generally found in urban areas. A rapid transit system that primarily or traditionally runs below the surface may be ...
line of the
Mass Rapid Transit Authority of Thailand Mass Rapid Transit Authority of Thailand or MRTA ( th, การรถไฟฟ้าขนส่งมวลชนแห่งประเทศไทย) is a state enterprise under the Ministry of Transport of Thailand. It is responsible the ope ...
(MRTA) in the
Bangkok Metropolitan Area The Bangkok Metropolitan Region (BMR) ( th, กรุงเทพมหานครและปริมณฑล; ; ), may refer to a government-defined "political definition" of the urban region surrounding the metropolis of Bangkok, or the built ...
,
Thailand Thailand ( ), historically known as Siam () and officially the Kingdom of Thailand, is a country in Southeast Asia, located at the centre of the Indochinese Peninsula, spanning , with a population of almost 70 million. The country is b ...
. When fully completed, the MRT Orange line will be 35.9 km long with 29 stations (7 stations will be elevated for 8.9 km and 22 will be underground for 27 km), including an interchange with the current Thailand Cultural Centre Station of MRT Blue Line). The line is divided into two sections; the 22.5 km Eastern section from Suwinthawong to Thailand Cultural Centre and the 2nd phase, 13.4 km Western section from Thailand Cultural Centre to Bang Khun Non. Construction of the 22.5 km Eastern Section started in June 2017. The line is scheduled to open in 2023. By the end of November 2022, construction had progressed to 98.31%. Western extension tender delayed On 3 July 2020, the MRTA released the tender for the design and construction of the Western extension. However in late August 2020, the tender submission deadline was subsequently delayed. and the MRTA amended the tender assessment criteria resulting in a lawsuit and an injunction suspending the tender decision. The tender was subsequently cancelled by the MRTA in February 2021 given ongoing litigation by the BTSC. After approval by the Administrative Court given ongoing litigation, a new tender issued in October has a deadline for bids of January 2022. The Criminal Court - Corruption and Malfeasance Division hearing into the cancelled tender process was conducted in late December 2021 which further delayed the reissued tender timeframe. Subject to court approval, the MRTA planned to review tender bids for a period of 3 months before seeking Cabinet approval for a reissued tender in April or May 2022. The MRTA reissued the new tender on 24 May 2022 with tender packages available for purchase until 10 June. 14 different companies purchased the auction envelopes. The 141 billion baht western extension consists of 86 billion baht for civil works, 14 billion for land appropriation and 31 billion for systems installation, rolling stock and maintenance. The winning bidder is expected to be announced in August 2022.


Route Alignment

The MRT Orange Line starts at Suwinthawong rd in
Min Buri District Min Buri ( th, มีนบุรี, ) is one of the 50 districts (''khet'') of Bangkok, Thailand. It is bounded by other Bangkok districts (from north clockwise): Khlong Sam Wa, Nong Chok, Lat Krabang, Saphan Sung, and Khan Na Yao. Min Buri is ...
in Bangkok's eastern suburbs as an elevated line running along Ramkhamhaeng Road. It will interchange with the future
MRT Yellow Line The MRT Yellow Line is an elevated mass rapid transit line currently under construction in Bangkok and Samut Prakan Province, Thailand. The 30.4 km line will have 23 stations and cost 55 billion baht. The line was originally proposed in 2005 ...
at Lam Sali station. It then proceeds underground near Lam Sali intersection in Bang Kapi District, where there will be a transfer to the
MRT Yellow Line The MRT Yellow Line is an elevated mass rapid transit line currently under construction in Bangkok and Samut Prakan Province, Thailand. The 30.4 km line will have 23 stations and cost 55 billion baht. The line was originally proposed in 2005 ...
. It continues southwest along Ramkhamhaeng Road, passing Hua Mak Stadium and
Ramkhamhaeng University Ramkhamhaeng University (RU) ( th, มหาวิทยาลัยรามคำแหง) is Thailand's largest public university. It was named in honour of King Ramkhamhaeng the Great of Sukhothai. The university provides an effective and e ...
to Rama IX rd intersection. The line then proceeds west along Rama IX rd and crosses Pradit Manutham Road to the current
Mass Rapid Transit Authority of Thailand Mass Rapid Transit Authority of Thailand or MRTA ( th, การรถไฟฟ้าขนส่งมวลชนแห่งประเทศไทย) is a state enterprise under the Ministry of Transport of Thailand. It is responsible the ope ...
(MRTA) Headquarters and MRT Blue line depot. Then it routes north to the Thailand Cultural Centre Station to interchange with the MRT Blue Line. The western section of the MRT Orange Line, runs west from Thailand Cultural Centre Station via Din Daeng housing estates and Bangkok City Hall 2 to
Vibhavadi Rangsit Road Vibhavadi Rangsit Road ( th, ถนนวิภาวดีรังสิต, ) or Highway 31, often informally called Vibhavadi Road (), is a highway in Thailand. The road begins at Phaya Thai district in Bangkok and crosses Chatuchak, Lak ...
, Sam Liam Din Daeng Junction. Then turns left into Ratchaprarop Road towards Pratu Nam and turns right into Phetchaburi Road then interchanges with BTS Sukhumvit Line at Ratchathewi Station. It continues along Lan Luang Road and
Ratchadamnoen Avenue Ratchadamnoen Avenue ( th, ถนนราชดำเนิน, , , also spelled Rajdamnern) is a historic road in the Phra Nakhon and Dusit Districts of Bangkok, Thailand. Ratchadamnoen Avenue may be the most politically charged thoroughfare ...
, then crosses the Chao Phraya River near
Phra Pinklao Bridge The Somdet Phra Pinklao Bridge ( th, สะพานสมเด็จพระปิ่นเกล้า, , ) is a bridge near the Grand Palace over the Chao Phraya River in Bangkok, Thailand. It links Rattanakosin Island with Thonburi. Backg ...
, passes Siriraj Hospital and goes along
Bangkok Noi Bangkok Noi ( th, บางกอกน้อย, ) is one of the 50 districts (''khet'') of Bangkok, Thailand. Neighboring districts are (from north clockwise) Bang Phlat, Phra Nakhon (across Chao Phraya River), Bangkok Yai, Phasi Charoen, a ...
Rail line and terminates at Bang Khun Non at Charan Sanitwong rd, where it interchanges with the MRT Blue Line.


History

The original plan of the MRT Orange Line aimed to serve travel demand between the northwestern area of
Thonburi __NOTOC__ Thonburi ( th, ธนบุรี) is an area of modern Bangkok. During the era of the Kingdom of Ayutthaya, its location on the right (west) bank at the mouth of the Chao Phraya River had made it an important garrison town, which i ...
, at Bang Bamru Railway Station in
Bang Phlat District Bang Phlat ( th, บางพลัด, ) is one of the 50 districts (''khet'') of Bangkok, Thailand. Its neighboring districts, clockwise from the north, are Bang Kruai district, Bang Sue, Dusit, Phra Nakhon, Bangkok Noi, and Taling Chan. H ...
, and the east of
Bangkok Bangkok, officially known in Thai as Krung Thep Maha Nakhon and colloquially as Krung Thep, is the capital and most populous city of Thailand. The city occupies in the Chao Phraya River delta in central Thailand and has an estimated populati ...
in Bang Kapi District. It was planned to run along Ramkhamhaeng Road and
Ratchawithi Road Bang Phlat Intersection where Ratchawithi Road ends Ratchawithi Road, also spelled Rajvithi ( th, ถนนราชวิถี, ) is a major road in Bangkok, Thailand. It begins in Ratchathewi district at Sam Liam Din Daeng Junction, where it ...
, passing many public places like Hua Mak Stadium,
Dusit Zoo Dusit Zoo ( th, สวนสัตว์ดุสิต) or popularly known as Khao Din Wana (เขาดินวนา) and Khao Din (เขาดิน) was a zoo in Bangkok, Thailand. Located at Khao Din Park in Bangkok's Dusit District nex ...
and Victory Monument, and provide access to universities including
Ramkhamhaeng University Ramkhamhaeng University (RU) ( th, มหาวิทยาลัยรามคำแหง) is Thailand's largest public university. It was named in honour of King Ramkhamhaeng the Great of Sukhothai. The university provides an effective and e ...
, Suan Sunandha and Suan Dusit Rajabhat University and many government offices. In 2009, the proposed MRT Brown line from Bang Kapi District, elevated along Ram Khamhaeng Road, to the eastern suburb in Saphan Sung District and
Min Buri District Min Buri ( th, มีนบุรี, ) is one of the 50 districts (''khet'') of Bangkok, Thailand. It is bounded by other Bangkok districts (from north clockwise): Khlong Sam Wa, Nong Chok, Lat Krabang, Saphan Sung, and Khan Na Yao. Min Buri is ...
, was merged with the Orange Line in Bangkok's mass rapid transit master plan. In July 2011, the section from Bang Khun Non to Taling Chan was finally scrapped in favour of the SRT Light Red Line spur line which duplicates the same route. In 2012, there were further notable changes made to the central and western sections of the Orange Line. The section from
Din Daeng District Din Daeng ( th, ดินแดง, ) is one of the 50 districts (''khet'') of Bangkok, Thailand. Its neighbours, clockwise from north, are Chatuchak, Huai Khwang, Ratchathewi, and Phaya Thai. History The district was created in 1993, when t ...
to Bang Bamru was rerouted away from Victory Monument and Ratchawithi road route to further run south to Pratunam and then west along Petchaburi Road and Larn Luang Road. Continuing farther west along Ratchadamnoen Klang Road and
Sanam Luang Sanam Luang ( th, สนามหลวง, ; lit: 'royal turf') is a open field and public square in front of Wat Phra Kaew and the Grand Palace, Bangkok, Thailand. Sanam Luang is in the Phra Nakhon District, the historic center of Bangkok ...
before passing under the
Chao Praya The Chao Phraya ( or ; th, แม่น้ำเจ้าพระยา, , or ) is the major river in Thailand, with its low alluvial plain forming the centre of the country. It flows through Bangkok and then into the Gulf of Thailand. Et ...
river and finally terminating at Bang Khun Non to interchange with the MRT Blue Line extension. The MRT Orange line Eastern section was originally planned to be tendered by the end of 2013. However, due to protests by residents regarding station footprint and compulsory land acquisition around stations at Pratunam, Ratchaprarop, Pracha Songkhro and Soesim stations the MRTA needed another 12 months to redesign sections of the line. Subsequently, political protests against the Thai government led to the metro transport funding bill lapsing when parliament was dissolved in December 2013. On 9 December 2015, Cabinet finally approved the Orange Line. On 19 April 2016, the Cabinet further approved a budget of 82.9 billion baht for Phase 1 Eastern section to build 17 stations and 22.5 km of rail from the Thailand Cultural Centre to Minburi, of which 12.2 km will be underground and 9 km will be elevated.


Construction Progress

Construction contracts were signed on 9 February 2017 between the MRTA and CKST Joint Venture consortium. Construction finally started in June 2017 with a 1980 day construction period with a scheduled opening in October 2022. Project construction is divided into 4 contracts. The eastern section new planned opening date is 2023. As of 31 December 2017, the progress of civil works construction was at 4.66% according to the MRTA. As of July 2018, overall construction progress was 13.57%. As of August 2018, overall construction progress was 16.21%. By 30 September 2018, overall construction had progressed to 18.33%. At the end of March 2019, construction had progressed to 32.12%. At the end of July 2019, civil construction was at 42.27%. At the end of October 2019, construction had progressed to 49.05%. At the end of January 2020, construction had progressed to 54.93%. By the end of May 2020, construction had progressed to 62.42%. At the end of July 2020, construction had progressed to 66.06%. On 5 October 2020, TBM number 2 finished tunneling and reached Ramkhamhaeng 12 station box as part of contract 2. At the end of September 2020, was at 69.82%. At the end of January 2020, construction had progressed to 76.09%. Construction progress was 79.44% complete by the end of March 2021. Construction progress was 81.03% by the end of April 2021. Construction progress was 87.24% by the end of October 2021. Construction progress was 88.46% by the end of November 2021. By the end of March 2022, construction progress was at 92.69%. By the end of May 2022, construction had progressed to 94.51%.https://www.facebook.com/MRTOrangeLineEast/photos/a.258445614634797/1357270614752286 ''MRTA Press'', 8 June 2022


Construction contracts

Construction is divided into four separate contracts. Contract 1 is for 6.29 km underground and 4 underground stations from Thai Cultural Centre interchange station to Rankhamhaeng 12 station. Contract 2 is for 3.44 km underground and 4 underground stations from Ramkhamheang 12 station to Hua Mark station. Contract 3 is for 4.04 km underground and 3 underground stations from Hua Mark station to Klong Ban Ma station. Contract 4 is 8.8 km and 7 elevated stations from Klong Ban Ma to Suwinthawong terminus station.


Rolling stock

The tender for operation of the line and purchase of rolling stock for both the eastern and western sections was issued in May 2022, along with the construction of the western section.


Phase 2 Western Extension

The Phase 2 Western extension of the Orange line will run from Thailand Cultural Centre to Bang Khun Non via Pratunam. The 13.4 km western section will run underground with 12 stations. The Thai Cabinet was expected to approve the 121 billion baht budget for the Western extension in mid 2017 with a tender due for the 2nd half of 2017. However, this decision was delayed until 2018 as Cabinet requested options to be considered for a joint public and private investment proposal. There were further delays into 2019, but the MRTA finalised a joint PPP plan for Cabinet to approve in mid 2019. On 28 January 2020, the Cabinet approved the 142 billion baht extension. It is expected to open in February 2026 and serve 439,000 passengers daily. On 3 July 2020, the MRTA released the tender for the design, construction and operation of the Western extension as a Public-Private Partnership project on a 30 year lease. The tender deadline was 23 September 2020 with the successful bidder to be announced in early October 2020. The tender specified a construction period of 3 and a half years. There were 10 tenderers that purchased the request for proposal (RFP) form with two major consortiums that submitted final bids: * Bangkok Expressway and Metro Public Company Limited (BEM) - operator of the MRT Blue Line and
MRT Purple Line The MRT Purple line ( th, รถไฟฟ้ามหานคร สายสีม่วง) or MRT Chalong Ratchatham line ( th, รถไฟฟ้ามหานคร สายฉลองรัชธรรม) is Bangkok's fifth rapid tra ...
s. * BSR Consortium, led by Bangkok Mass Transit System Public Company Limited (BTSC), and supported by BTS Group Holdings (BTS Group) and Sino-Thai Engineering and Construction (STECON). BTSC is the future operator of the
MRT Pink Line The MRT Pink Line is an elevated mass rapid transit monorail train line under construction in Bangkok and Nonthaburi Province, Thailand. The monorail line will be long and have 30 stations. It will run in the northern part of the city from the ...
and
MRT Yellow Line The MRT Yellow Line is an elevated mass rapid transit line currently under construction in Bangkok and Samut Prakan Province, Thailand. The 30.4 km line will have 23 stations and cost 55 billion baht. The line was originally proposed in 2005 ...
s which are both under construction. However, in late August 2020 the tender submission deadline was subsequently delayed by the MRTA. Thereafter, the MRTA amended the tender assessment criteria resulting in a lawsuit being lodged by the BTSC in the Administrative Court on 17 September 2020 with the Court imposing an injunction suspending the tender decision. The tender was subsequently cancelled by the MRTA in February 2021 due to litigation by the BTSC. After approval by the Administrative Court given ongoing litigation, a new tender issued in October has a deadline for bids of January 2022. The Criminal Court Corruption and Malfeasance division hearings into the cancelled tender process were conducted from 14 to 24 December 2021 and have delayed the reissued tender timeframe. Subject to court approval, the MRTA plans to review tender bids for a period of 3 months before seeking final Cabinet approval of the winning bid in April 2022. However, there are construction budget concerns for the extension as steel prices have increased by 40% since the previous budget was approved. The EIA for the western extension was also updated in December 2021 as Din Daeng station was moved north by 500m, Pracha Songkhro station was moved east by 450m and Yommarat station was redesigned. The MRTA reissued the new tender auction on 24 May with tender packages available for purchase until 10 June. The 141 billion baht western extension consists of 86 billion baht for civil works, 14 billion for land appropriation and 31 billion for systems installation, rolling stock and maintenance. The MRTA announced in September 2022 that the BEM-led consortium had submitted the most financially favorable bid of the two remaining bidders.


Stations


Network Map


See also

* Mass Rapid Transit Master Plan in Bangkok Metropolitan Region *
MRT (Bangkok) The Metropolitan Rapid Transit or MRT is a mass rapid transit system serving the Bangkok Metropolitan Region in Thailand. The MRT system comprises two rapid transit lines, with a further three lines (one rapid transit line and two monorail lines ...
* MRT Blue Line *
MRT Brown Line The MRT Brown Line is a 22.1 km rapid transit line in Bangkok, Thailand proposed monorail mass transit line from Nonthaburi Civic Centre, Nonthaburi Province to Lam Sali intersection, Bang Kapi District. 20 stations are proposed for the lin ...
* MRT Grey Line * MRT Light Blue Line *
MRT Pink Line The MRT Pink Line is an elevated mass rapid transit monorail train line under construction in Bangkok and Nonthaburi Province, Thailand. The monorail line will be long and have 30 stations. It will run in the northern part of the city from the ...
*
MRT Purple Line The MRT Purple line ( th, รถไฟฟ้ามหานคร สายสีม่วง) or MRT Chalong Ratchatham line ( th, รถไฟฟ้ามหานคร สายฉลองรัชธรรม) is Bangkok's fifth rapid tra ...
*
MRT Yellow Line The MRT Yellow Line is an elevated mass rapid transit line currently under construction in Bangkok and Samut Prakan Province, Thailand. The 30.4 km line will have 23 stations and cost 55 billion baht. The line was originally proposed in 2005 ...
* BTS Skytrain * Sukhumvit Line *
Silom Line The BTS Silom line ( th, รถไฟฟ้า สายสีลม) or Dark Green line, is an elevated rapid transit line of the BTS Skytrain in Bangkok, Thailand. It is operated by Bangkok Mass Transit System PCL (BTSC), a subsidiary of BTS ...
* Airport Rail Link (Bangkok) * SRT Dark Red Line * SRT Light Red Line *
Bangkok BRT The Bangkok BRT is a bus rapid transit system in Bangkok, Thailand. Of five routes that were originally planned, only one line has been operating since 2010, with the other routes cancelled. Bangkok Metropolitan Administration (BMA) announced the ...
*
BMA Gold Line The Gold Line is an automated people mover line, part of Bangkok's rapid transit system. The line is 1.72 km long, consisting of 3 stations, and was opened by Thai Prime Minister Prayut Chan-o-cha on 16 December 2020. It primarily serves as ...
* BMA Bang Na-Airport Line


References


External links


"MRT Orange Line Eastern Section"



MRTA
{{DEFAULTSORT:Mrt Orange Line Proposed public transport in Thailand Orange line 2024 in rail transport