Line 1 (Navi Mumbai Metro)
   HOME

TheInfoList



OR:

Line 1 of the Navi Mumbai Metro is part of the rapid transit rail system for the city of Navi Mumbai, India. The 23.40 km line consists of 20 metro stations from Belapur to Khandeshwar. It is expected to cost . On 7 May 2021, State-run town planning authority
CIDCO The City and Industrial Development Corporation of Maharashtra (CIDCO) is an Indian city planning agency and richest government authority in India which is formed and controlled by the Government of Maharashtra. CIDCO was formed on 17 March 197 ...
conducted a successful trial run on the approach route to and the test track at Taloja metro depot, and claimed that it was "successful in all respects". The metro was supposed to be operational by 2016, but it yet to be opened till today.


History

The following dates represent the dates the section opened to the public, not the private inauguration.


Background

The feasibility study for the Navi Mumbai Metro was carried out by the
Delhi Metro Rail Corporation Delhi Metro Rail Corporation Limited (DMRC) is a centre-state joint venture that operates the Delhi Metro. The DMRC is also involved in the planning and implementation of metro rail, monorail, and high-speed rail projects in India and abroad. ...
(DMRC). CIDCO was authorised as the implementing agency of the Belapur-Pendhar-Kalamboli-Khandeshwar line, under the ''Indian Tramway Act 1886'', by the
Government of Maharashtra The Government of Maharashtra is the state governing authority for the state of Maharashtra, India. It is a democratically elected government with 288 MLAs elected to the Vidhan Sabha for a five-year term. Maharashtra has a Maharashtra Legisl ...
on 30 September 2010.CIDCO :: Introduction Page
/ref>"Cidco takes Navi Mumbai metro plan ahead"
DNA India. 27 March 2012. Retrieved 5 April 2012.
The state government later asked the CIDCO to implement the Navi Mumbai Metro project under the Central Metro Act.Next metro only by 2016 & Updates at Daily News & Analysis
/ref> The detailed master plan for Line 1 was prepared by the DMRC. The proposed route will link Belapur, Kharghar, Taloje, MIDC, Kalamboli and the Khandeshwar railway station, terminating at the proposed
Navi Mumbai International Airport Navi Mumbai International Airport, officially D. B. Patil International Airport, is an international airport being constructed in Navi Mumbai, Maharashtra, India. It will serve in parallel as an alternative with Mumbai's existing Chhatrapati S ...
.


Construction

The metro's foundation stone was laid on 1 May 2011 by Chief Minister
Prithviraj Chavan Prithviraj Chavan () (born 17 March 1946) is an Indian politician who was the 17th Chief Minister of Maharashtra, a state in Western India. Chavan is a graduate of the Birla Institute of Technology and Science, Pilani and University of Cal ...
, and general foundation work on the system's first phase commenced in October 2011."Work on first phase of Navi Mumbai Metro Rail begins"
''The Economic Times''. 28 October 2011. Retrieved 30 October 2011.
Line 1's first girder was placed on 13 December 2012. Line 1 is planned to be developed in 3 phases. CIDCO awarded the contract for civil works in Phase I to six firms. The contract for technical work was awarded to one firm, at an estimated cost of . Spanish contractor San José Constructora will design and build five stations, located at Central Park, Pethpada, Sector 34, Panchanand and Pendhar. In the second phase, an line will be built from Khandeshwar to Taloje MIDC, with seven stations. The third phase will entail the merging of two rail corridors between Pendhar and MIDC with a link, forming a loop from Belapur to Khandeshwar. A maintenance depot will be constructed on a plot at Taloja for the circular line, and a temporary maintenance depot will be constructed on five hectares of land at Khandeshwar. Line 1 was expected to be completed by 2016 but its most likely to miss deadline, trains may roll out only by July 2017. CIDCO has plans to extend Line 1 up to
Kalyan Kalyan (Pronunciation: əljaːɳ is a city on the banks of Ulhas River in Thane district of Maharashtra state in Konkan division. It is governed by Kalyan-Dombivli Municipal Corporation. Kalyan is a subdivision (Taluka) of Thane district ...
Ulhasnagar Ulhasnagar is a city in Thane district, Maharashtra, India. This city is a part of Mumbai Metropolitan Region managed by MMRDA. It had an estimated population of 506,098 at the 2011 Census. Ulhasnagar is a municipal city and the headquarters o ...
- Murbad.


Funding

Phase I of Line 1 was executed using CIDCO funds. The total cost of Line 1 is estimated to be .


Stations


Stage 1


Stage 2


Stage 3

Stage 3 involves the construction of a 2 km link and one station between Pendhar and MIDC, to join Stage 1 and Stage 2, and also the construction of a 5 km link to connect the upcoming
Navi Mumbai International Airport Navi Mumbai International Airport, officially D. B. Patil International Airport, is an international airport being constructed in Navi Mumbai, Maharashtra, India. It will serve in parallel as an alternative with Mumbai's existing Chhatrapati S ...
from Khandeshwar, from where the Navi Mumbai International Airport Metro Station will be connected with the proposed Line 8 (Gold Line) of Mumbai Metro till
Chhatrapati Shivaji Maharaj International Airport Chhatrapati Shivaji Maharaj International Airport is an international airport serving Mumbai and the Mumbai Metropolitan Region (MMR). It is the second busiest airport in the country in terms of total and international passenger traffic a ...
.


Infrastructure

An international consortium of companies including
Ansaldo STS Hitachi Rail STS SpA (from ''Hitachi Rail Signalling and Transportation Systems'') or Hitachi Rail STS (previously Ansaldo STS) is a transportation company owned by Hitachi with a global presence in the field of railway signalling and integrated t ...
, Tata Projects and CSR Zhuzhou will provide the electrical and mechanical systems for the first phase of Line 1. Ansaldo will conduct systems integration and supply train control systems, telecoms, fare collection systems and equipment storage. The metro's standard gauge network would be electrified at 25 kV AC, with power provided via an
overhead catenary An overhead line or overhead wire is an electrical cable that is used to transmit electrical energy to electric locomotives, trolleybuses or trams. It is known variously as: * Overhead catenary * Overhead contact system (OCS) * Overhead equipm ...
.


Rolling stock

In 2014, the Chinese company CSR Zhuzhou signed a contract with CIDCO to supply rolling stock for the first phase of the metro's Line 1. The three-car trainsets would be long and wide, with a passenger capacity of around 1,100 and a maximum speed of approximately . The trains would feature stainless steel bodies, air-conditioning and LED lighting.


References