Kamuthi Solar Power Project is a photovoltaic power station spread over an area of in
Kamuthi Kamuthi also spelled Kamudi actually stands for Kavinmigu Mullai Thirunagar. Kamuthi is a Panchayat town in Ramanathapuram district in the Indian state of Tamil Nadu. Kamuthi is known for being the home of the Kamuthi Solar Power Project, a la ...
,
Ramanathapuram district Ramanathapuram District, also known as Ramnad District, is one of the 38 districts an administrative districts of Tamil Nadu state in southern India. The old Ramanathapuram District consists of Present day Virudhunagar and Sivagangai district ...
, 90 km from Madurai, in the state of
Tamil Nadu Tamil Nadu (; , TN) is a state in southern India. It is the tenth largest Indian state by area and the sixth largest by population. Its capital and largest city is Chennai. Tamil Nadu is the home of the Tamil people, whose Tamil language ...
, India. The project was commissioned by Adani Power. With a generating capacity of 648 MWp at a single location, it is the world's 12th largest solar park based on capacity.
ABB ABB Ltd. is a Swedish- Swiss multinational corporation headquartered in Zürich, Switzerland. The company was formed in 1988 when Sweden's Allmänna Svenska Elektriska Aktiebolaget (ASEA) and Switzerland's Brown, Boveri & Cie merged to crea ...
commissioned five sub-stations to connect the solar park with the National Grid on 13 June 2016. The Kamuthi Solar Power Project was completed on 21 September 2016 with an investment of around . The solar plant consists of 2.5 million solar modules, 380,000 foundations, 27,000 metres of structures, 576 inverters, 154 transformers, and almost 6,000 km of cables. Construction of the structures needed to mount the solar panels required 30,000 tonnes of galvanised steel. Around 8,500 workers installed an average of 11 MW of capacity per day to complete the project within 8 months. The entire solar park is connected to a 400 kV substation of the Tamil Nadu Transmission Corp. The solar panels are cleaned daily by a self-charged robotic system. Given the solar resource of around 2100 kWh/(m2*yr) an annual generation of 1.35 TWh/yr may be possible. This corresponds to a capacity factor (or average power) of 24% of the peak capacity 648 MWp. Assuming a technical life time of 25 years the investment cost is 700 MUSD/(25*1.35 TWh) = 2 US cent/kWh.


Controversy

The plant relies on approximately 200,000 liters of water to keep its 25,000 modules clean each year, which has apparently been sourced from borewells nearby without consent of the respective district authority.


See also

*
Solar power in India Solar power in India is a fast developing industry. The country's solar installed capacity was 61.966 GWAC as of 30 November 2022. Solar power generation in India ranks fourth globally in 2021. The Indian Government had an initial tar ...
*
Renewable energy in India India is world's 3rd largest consumer of electricity and world's 3rd largest renewable energy producer with 40% of energy capacity installed in the year 2022 (160 GW of 400 GW) coming from renewable sources. Ernst & Young's (EY) 2021 Renewab ...


References

Photovoltaic power stations in India 2016 establishments in Tamil Nadu Ramanathapuram district Power stations in Tamil Nadu Adani Group {{India-powerstation-stub