Hunterston B nuclear power station
   HOME

TheInfoList



OR:

Hunterston B nuclear power station is a shut down AGR
nuclear power station A nuclear power plant (NPP) is a thermal power station in which the heat source is a nuclear reactor. As is typical of thermal power stations, heat is used to generate steam that drives a steam turbine connected to a generator that produces ele ...
in
North Ayrshire North Ayrshire ( gd, Siorrachd Àir a Tuath, ) is one of 32 council areas in Scotland. The council area borders Inverclyde to the north, Renfrewshire and East Renfrewshire to the northeast, and East Ayrshire and South Ayrshire to the east a ...
, Scotland. Located about south of
Largs Largs ( gd, An Leargaidh Ghallda) is a town on the Firth of Clyde in North Ayrshire, Scotland, about from Glasgow. The original name means "the slopes" (''An Leargaidh'') in Scottish Gaelic. A popular seaside resort with a pier, the town mark ...
and about north-west of
West Kilbride West Kilbride ( gd, Cille Bhrìghde an Iar) is a village and historic parish in North Ayrshire, Scotland, on the west coast by the Firth of Clyde, looking across the Firth of Clyde to Goat Fell and the Isle of Arran. West Kilbride and adjoi ...
on the
Firth of Clyde The Firth of Clyde is the mouth of the River Clyde. It is located on the west coast of Scotland and constitutes the deepest coastal waters in the British Isles (it is 164 metres deep at its deepest). The firth is sheltered from the Atlantic ...
coast. It is currently operated by
EDF Energy EDF Energy is a British integrated energy company, wholly owned by the French state-owned EDF (Électricité de France), with operations spanning electricity generation and the sale of natural gas and electricity to homes and businesses through ...
, and began producing electricity in 1976. The station ceased generation on 7 January 2022. On 19 May 2022, EDF announced that defueling was started on the two Hunterston B units. This process is expected to take over three years to complete, and it involves the complete emptying of all fuel channels from both reactors. This amounts to over 300 channels from each reactor, each containing 8 fuel elements. Fully loaded flasks containing the used fuel are scheduled to be dispatched from the site by rail to
Sellafield Sellafield is a large multi-function nuclear site close to Seascale on the coast of Cumbria, England. As of August 2022, primary activities are nuclear waste processing and storage and nuclear decommissioning. Former activities included nuc ...
at a maximum rate of three per week. Hunterston B is similar in design to sister station Hinkley Point B, which ceased operations in August 2022.


History

The construction of Hunterston B was undertaken by a consortium known as The Nuclear Power Group (TNPG). The two advanced gas-cooled reactors (AGR) were supplied by TNPG and the turbines by C. A. Parsons & Co.Nuclear Power Plants in the UK - Scotland and Wales
Hunterston B began to generate
electricity Electricity is the set of physical phenomena associated with the presence and motion of matter that has a property of electric charge. Electricity is related to magnetism, both being part of the phenomenon of electromagnetism, as describe ...
on 6 February 1976. On 3 December 1977, ''
The Times ''The Times'' is a British daily national newspaper based in London. It began in 1785 under the title ''The Daily Universal Register'', adopting its current name on 1 January 1788. ''The Times'' and its sister paper '' The Sunday Times'' ( ...
'' reported that seawater had entered the reactor through a modification of the secondary cooling system. The secondary cooling system uses fresh water to cool parts including the bearings of the gas circulators, which circulate the carbon dioxide () coolant through the reactor to the boilers. A small leak of through a seal had developed, and a bypass pipe was installed to remove the water contaminated with to the seawater cooling ponds. When maintenance work was carried out on the reactor and the pressure in the gas cooling system was reduced, sea water was able to flow back up this bypass pipe and into the reactor. The residual heat of the reactor was such that the seawater evaporated rapidly, leaving deposits of salt in the reactor around the gas circuit. It was estimated at the time that the reactor could be out of operation for a year, that the repairs could cost £14million, and that electricity tariffs would have to rise by between 1 and 2 per cent. Extensive modelling work was performed in the Nuclear Power Company's (NPC) Whetstone, Leicestershire, fluid flow laboratories to determine where the salt would have been deposited, and the salt was successfully removed by technicians using vacuum cleaners and the plant returned to operation. In February 1997, there was concern that contaminated gas from the plant had entered three road tankers and then entered the food chain via soft drinks and beers.
Carlsberg-Tetley Tetley's Brewery (Joshua Tetley & Son Ltd) was an English regional brewery founded in 1822 by Joshua Tetley in Hunslet, now a suburb of Leeds, West Yorkshire. The beer was originally produced at the Leeds Brewery, which was later renamed the ...
withdrew all its gas cylinders in Scotland as a result of finding contamination in one. In December 1998, an INES Level 2 incident occurred after severe winds and sea spray disabled all four power lines to the site during the Boxing Day Storm of 1998. After multiple grid failures in a short period of time, emergency diesel generators failed to start. Normally, in the absence of power for the reactor cooling pumps, the reactor would be passively cooled. However, the emergency control system which would have initiated passive cooling failed to act, as it had not been reset. Reactor cooling was reinstated after fourhours. There was considerable confusion and delay in restoring power as plant schematics and security systems were computerised but were rendered inoperable due to lack of electrical power. Due to the inherent safety margins of the AGR reactor design, there was no reactor damage, and the plant would have tolerated loss of cooling for 20hours. The subsequent investigation made several recommendations: redesign of the insulators on the 400kV power lines, installation of an additional 132kV power line for emergency power, a second diesel generator building remote from the first, installation of an
uninterruptible power supply An uninterruptible power supply or uninterruptible power source (UPS) is an electrical apparatus that provides emergency power to a load when the input power source or mains power fails. A UPS differs from an auxiliary or emergency power syste ...
for the reactor safety systems and for essential computer equipment, provision of hard copy plant schematics and emergency protocols, and revised staff training procedures including simulation of multiple simultaneous system failures. In 2006, concerns were raised in a report commissioned by
Greenpeace Greenpeace is an independent global campaigning network, founded in Canada in 1971 by Irving Stowe and Dorothy Stowe, immigrant environmental activists from the United States. Greenpeace states its goal is to "ensure the ability of the Earth t ...
that the graphite moderator core in each of the twin reactors at Hunterston B might have developed structural problems in the form of cracking of the bricks (as at similar AGR power stations). Its net electrical output was 1,215MW. In 2007, the reactors were restricted to operating at a reduced level of around 70% of full output (around 850MWe net). Subsequent work during maintenance shutdowns have resulted in Reactor 3 operating at around 82% (540Mwe net) in early 2011, and Reactor 4 at around 73% (480MWe net). In total this equates to around 1,020MWe gross output from the generators. Internal load of 90MWe brings net output to approximately 930MWe. Hunterston B is capable of supplying the electricity needs of over 1million homes. ''Hunterston B''
EDF Energy EDF Energy is a British integrated energy company, wholly owned by the French state-owned EDF (Électricité de France), with operations spanning electricity generation and the sale of natural gas and electricity to homes and businesses through ...
Hunterston B was originally planned to operate until 2011. In 2007, planned operation was extended by five years to 2016. In December 2012, EDF said it could (technically and economically) operate until 2023.


Graphite core keyway root cracks

In October 2014, it was reported that cracks had been found in one of the reactors at the plant following routine inspections which began in August 2014. Two of about 3,000 graphite bricks in the core of reactor four at Hunterston were affected. The plant's operator, EDF Energy, said the cracking was predicted to occur as the station ages and said that the issue would not affect the safe operation of the reactor. In October 2016, it was announced that super-articulated control rods would be installed in the reactor because of concerns about the stability of the reactors' graphite cores. The Office for Nuclear Regulation (ONR) had raised concerns over the number of fractures in keyways that lock together the graphite bricks in the core. An unusual event, such as an earthquake, might destabilise the graphite so that ordinary control rods that shut the reactor down could not be inserted. Super-articulated control rods should be insertable even into a destabilised core. In early 2018, a higher rate of new keyway root cracks than modelled was observed in Reactor 3 during a scheduled outage, and EDF announced in May 2018: "While Hunterston B Reactor 3 could return to operation from the current outage, it will remain offline while the company works with the regulator to ensure that the longer term safety case reflects the findings of the recent inspections and includes the results obtained from other analysis and modelling." In December 2018, EDF pushed back their estimated return to service date to March 2019 for Reactor 4 and April 2019 for Reactor 3, to allow for further modelling work and a new seismic analysis. In March 2019, pictures of the cracking were released with EDF stating that it intended to seek permission from the ONR to restart reactor 3 by raising the operational limit for the number of cracks. About 370 fractures have been discovered, on average wide, in about 10% of the graphite bricks in the reactor core. This was above the operational limit of 350 fractures, and EDF intends to present a new safety case for an operational limit of 700 cracks. One reactor was restarted on 25 August 2019 then shut down again on 10 December 2019. In August 2020, EDF received regulatory approval to restart the two reactors, in August and September 2020 respectively, before moving to defuel and decommission the plant starting no later than 7 January 2022. The first reactor, Unit 3, was taken offline for the final time at midday on 26 November 2021. Reactor 4 was shut down at midday on 7 January 2022, ending 46 years of generation at the station.


See also

*
Hunterston A nuclear power station Hunterston A nuclear power station is a decommissioned Magnox nuclear power station located at Hunterston in Ayrshire, Scotland, adjacent to Hunterston B. The ongoing decommissioning process is being managed by Nuclear Decommissioning Authorit ...
nearby, shutdown 1990, now being decommissioned. * Nuclear power in Scotland *
Nuclear power in the United Kingdom Nuclear power in the United Kingdom generated 16.1% of the country's electricity in 2020. , the UK has 9 operational nuclear reactors at five locations (8 advanced gas-cooled reactors (AGR) and one pressurised water reactor (PWR)), producing 5 ...
*
Energy policy of the United Kingdom The energy policy of the United Kingdom refers to the United Kingdom's efforts towards reducing energy intensity, reducing energy poverty, and maintaining energy supply reliability. The United Kingdom has had success in this, though energy in ...
* Energy use and conservation in the United Kingdom *
Western HVDC Link The Western HVDC Link is a high-voltage direct current (HVDC) undersea electrical link in the United Kingdom, between Hunterston in Western Scotland and Flintshire Bridge (Connah's Quay) in North Wales, routed to the west of the Isle of Man. ...
, a 2.2 GW cable from Hunterston to Wales


References


External links


Hunterston B nuclear power station
{{British nuclear power plants Former nuclear power stations in Scotland Nuclear power stations using Advanced Gas-cooled Reactors Firth of Clyde