The Herefordshire and Gloucestershire Canal (sometimes known as the Hereford and Gloucester Canal) is a
canal Canals or artificial waterways are waterways or engineered channels built for drainage management (e.g. flood control and irrigation) or for conveyancing water transport vehicles (e.g. water taxi). They carry free, calm surface flo ...
in the west of England, which ran from Hereford to
Gloucester Gloucester ( ) is a cathedral city and the county town of Gloucestershire in the South West of England. Gloucester lies on the River Severn, between the Cotswolds to the east and the Forest of Dean to the west, east of Monmouth and east ...
, where it linked to the
River Severn , name_etymology = , image = SevernFromCastleCB.JPG , image_size = 288 , image_caption = The river seen from Shrewsbury Castle , map = RiverSevernMap.jpg , map_size = 288 , map_c ...
. It was opened in two phases in 1798 and 1845, and closed in 1881, when the southern section was used for the course of the Ledbury and Gloucester Railway. It is the subject of an active restoration scheme.


History

The first plans for a canal between Hereford and Gloucester were made by
Robert Whitworth Robert Whitworth (1734 – 30 March 1799) was an English land surveyor and engineer, who learnt his trade under John Smeaton and James Brindley, and went on to become one of the leading canal engineers of his generation. Biography Whitworth was ...
, one of
James Brindley James Brindley (1716 – 27 September 1772) was an English engineer. He was born in Tunstead, Derbyshire, and lived much of his life in Leek, Staffordshire, becoming one of the most notable engineers of the 18th century. Early life Born i ...
's pupils, in 1777. The route was part of a grander plan to link Stourport on Severn and
Leominster Leominster ( ) is a market town in Herefordshire, England, at the confluence of the River Lugg and its tributary the River Kenwater. The town is north of Hereford and south of Ludlow in Shropshire. With a population of 11,700, Leominster i ...
as well. Twelve years later, Richard Hall submitted plans for a canal via Ledbury. In March 1790, the promoters decided to submit the plans to Parliament. Josiah Clowes, an engineer who had previous experience of working on the
Chester Canal The Chester Canal was an English canal linking the south Cheshire town of Nantwich with the River Dee at Chester. It was intended to link Chester to Middlewich, with a branch to Nantwich, but the Trent and Mersey Canal were unco-operative abou ...
and who had worked with Whitworth on the Thames and Severn Canal, was to be the engineer. It appears that he re-surveyed the route, and recommended a change, so that it passed through Ledbury. A branch would be built to Newent where there were minor coalfields, and the canal would be suitable for boats , capable of carrying 35 tons. The estimated cost was £70,000, and it was expected to carry 33,203 tons per year, generating £9,582 in revenue. Some of the promoters began to think that improving the River Wye might be a better option, but the announcement of new seams of coal at Newent resulted in a decision to obtain an
Act of Parliament Acts of Parliament, sometimes referred to as primary legislation, are texts of law passed by the Legislature, legislative body of a jurisdiction (often a parliament or council). In most countries with a parliamentary system of government, acts of ...
, which was granted in April 1791. Hugh Henshall, who was the brother-in-law of James Brindley, was asked to re-survey the route in 1792, and recommended a diversion to Newent. This route required a tunnel at Oxenhall, and another act of parliament was obtained in 1793 to sanction the new route. Josiah Clowes died in 1795, and was succeeded as engineer by Robert Whitworth. By late 1795, the initial section was open to Newent, but the tunnel was causing major problems. In order to build the tunnel, twenty shafts were sunk along its route, so that there could be multiple working faces. However, there were considerable difficulties caused by the volume of water entering the shafts. Horse-powered pumps proved inadequate, and eventually steam-powered pumps were employed, but this added to the cost, and the tunnel was a large factor in the failure to complete the canal. The canal was opened to within one mile of Ledbury in 1798, but stopped there as the cost had far exceeded the estimates. The Coal Branch to the mines at Newent was never a success, as the coal was of very poor quality, and the branch fell into disuse very quickly. The price of coal in the region dropped from 24 shillings (£1.20) per ton to 13/6 (68p) but the coal was a good quality product which travelled up the canal from the River Severn. Ledbury remained the terminus for another forty years, although a short extension to enable coal to be delivered to the Ledbury gas works was completed in 1832.


Second Phase

In 1827, Stephen Ballard became the new clerk of the company, and produced a report on how to complete the canal in 1829. In 1838, he proposed a new route for the final section, but the engineer James Walker advised against it, and so in May 1839, a new
Act of Parliament Acts of Parliament, sometimes referred to as primary legislation, are texts of law passed by the Legislature, legislative body of a jurisdiction (often a parliament or council). In most countries with a parliamentary system of government, acts of ...
was obtained, allowing the company to raise the money to complete the canal. Work started on 17 November. A feeder from the River Frome to the summit level was completed in August 1842, and the canal opened in stages as it was completed, with extensions to Canon Frome wharf in January 1843, Whithington wharf in February 1844, and finally to Hereford basin on 22 May 1845. As with the first phase, it was the tunnel construction which caused the most problems, and Ashperton tunnel, although only long, was affected by water flooding the work faces and by unstable rock, resulting in the need to construct a brick and stone lining. Again, costs escalated well beyond the original estimates.


Operation

The canal had cost far more to build than was originally planned. The whole canal had been estimated at £69,997 by Josiah Clowes in 1790, but the section to Ledbury had cost in excess of £104,000. Stephen Ballard had estimated the cost of the second phase at £53,000, but the final cost had been £141,436. With little increase in trade from the longer canal, the company tried to sell it to a railway company almost immediately, but were unsuccessful, and so tried to boost trade. Traffic started to increase, to the extent that a timetable for the transit of the Oxenhall tunnel had to be introduced in 1849. This was not always successful, as the ''Hereford Times'' carried articles in May 1851 about an incident in which boats travelling in opposite directions had met in the middle, and neither would give way. There was deadlock for a period of 58 hours.


Decline and Closure

In 1858, the canal carried 47,560 tons of goods, and generated an income of £7,061 in 1860, but some of this was derived from the carriage of materials to build railways in the area. On 17 January 1862, less than 17 years after the opening to Hereford, the canal was leased to the Great Western and
West Midland Railway The West Midland Railway was an early British railway company. It was formed on 1 July 1860 by a merger of several older railway companies and amalgamated with the Great Western Railway on 1 August 1863. It was the successor to the Oxford, Worc ...
, with a view to converting it to a railway. This did not take place immediately, but on 30 June 1881, half of the canal was closed, and sections of it were used for the course of the Ledbury and Gloucester Railway. The Hereford to Ledbury section remained open, but gradually became disused. The Canal Company continued to receive rent from the Great Western Railway, which it distributed to its shareholders as dividends, and was not formally wound up until the railways were nationalised in 1948.


Route

The canal ran for from Hereford basin through Ledbury,
Dymock Dymock is a village and civil parish in the Forest of Dean district of Gloucestershire, England, about four miles south of Ledbury. In 2014 the parish had an estimated population of 1,205. Dymock is the origin of the Dymock Red, a cider appl ...
and
Newent Newent (; originally called "Noent") is a market town and civil parish about 10½ miles (17 km) north-west of Gloucester, England. Its population was 5,073 at the 2001 census, rising to 5,207 in 2011, The population was 6,777 at the 2021 Census. ...
to Over, on the West Channel of the River Severn west of
Gloucester Gloucester ( ) is a cathedral city and the county town of Gloucestershire in the South West of England. Gloucester lies on the River Severn, between the Cotswolds to the east and the Forest of Dean to the west, east of Monmouth and east ...
, with a short branch to the coal fields at Gorsley. The first from Hereford to Withington, which includes the Aylestone tunnel, was level, after which the canal rose by through three locks over the three miles to Monkhide. This section includes the
skew bridge A skew arch (also known as an oblique arch) is a method of construction that enables an arch bridge to span an obstacle at some angle other than a right angle. This results in the faces of the arch not being perpendicular to its abutments and its ...
at Monkhide, built by Ballard at an angle of only 27° to the canal. The bridge was constructed of red brick with some stone dressing, and the parapets are capped with large black engineering bricks which indicate that they were made by B W Blades of West Bromwich. The bridge is a grade II listed structure. There is then another level section of more than twelve miles to the outskirts of Ledbury, which includes the Ashperton tunnel. Water is fed into this section from the River Frome. The final to Over falls by , and includes the Oxenhall tunnel, which was not destroyed by the construction of the railway, as the railway company took the sensible decision to avoid the likely problems of enlarging it, and built a diversion to the south-west. The coal branch left the canal below the tunnel. The canal had 22
locks Lock(s) may refer to: Common meanings *Lock and key, a mechanical device used to secure items of importance *Lock (water navigation), a device for boats to transit between different levels of water, as in a canal Arts and entertainment * ''Lock ...
, and three tunnels. Like many English canals it was built to carry valuable cargoes by narrowboats.


Restoration

A series of articles about the canal were published in the local press in early 1983, and this led to calls for a society to be formed which would raise public awareness of the canal. A meeting was held in Hereford to facilitate this on 13 April 1983, at which a canal society was formed, which soon became actively engaged in restoration. While the original goal was preservation of the remains, in 1992 the society became the Herefordshire and Gloucestershire Canal Trust (H&G Canal Trust) and the aim became full restoration of the of canal and locks so that Hereford would once again be linked with Ledbury,
Dymock Dymock is a village and civil parish in the Forest of Dean district of Gloucestershire, England, about four miles south of Ledbury. In 2014 the parish had an estimated population of 1,205. Dymock is the origin of the Dymock Red, a cider appl ...
,
Newent Newent (; originally called "Noent") is a market town and civil parish about 10½ miles (17 km) north-west of Gloucester, England. Its population was 5,073 at the 2001 census, rising to 5,207 in 2011, The population was 6,777 at the 2021 Census. ...
and the rest of the inland waterway system at
Gloucester Gloucester ( ) is a cathedral city and the county town of Gloucestershire in the South West of England. Gloucester lies on the River Severn, between the Cotswolds to the east and the Forest of Dean to the west, east of Monmouth and east ...
. Since 1991 the local council authorities in
Herefordshire Herefordshire () is a county in the West Midlands of England, governed by Herefordshire Council. It is bordered by Shropshire to the north, Worcestershire to the east, Gloucestershire to the south-east, and the Welsh counties of Monmouthsh ...
have set aside land for development as a canal route. The planning department has approved projects with the canal in mind, and has taken action against those trying to build on the proposed route of the canal. Similar support has been given by the local council authorities in
Gloucestershire Gloucestershire ( abbreviated Glos) is a county in South West England. The county comprises part of the Cotswold Hills, part of the flat fertile valley of the River Severn and the entire Forest of Dean. The county town is the city of Gl ...
. In 2000, the Over Canal Basin (adjacent to the
River Severn , name_etymology = , image = SevernFromCastleCB.JPG , image_size = 288 , image_caption = The river seen from Shrewsbury Castle , map = RiverSevernMap.jpg , map_size = 288 , map_c ...
at Over on the outskirts of Gloucester, where the Canal links with the inland waterways network) was reconstructed entirely by volunteers from the Canal Trust and the national volunteer body the Waterway Recovery Group. The estimated commercial cost of the work was some £500,000, but it was completed against a 10-month deadline, with a budget of just £60,000. The basin was originally filled in when the Over Isolation Hospital was built in 1903. The site was sold for housing development to Swan Homes, and agreement was reached to excavate the basin to enhance the project, under which Wharf House was rebuilt to provide a new canal centre. In late 2011, the Trust were able to buy a short section of the former canal route adjacent to the basin site (Vineyard Hill). This had been purchased by residents in 2004 to protect their communal interests, and was passed to the Trust for a nominal sum. Like the basin, there was a deadline on development, which had to be completed by September 2012, but a major effort by the Waterway Recovery Group and members of the Trust resulted in most of the work being completed in April 2012. It was re-watered by 18 April, four months before its scheduled completion date. It was formally re-opened by Timothy West and Prunella Scales at the 2012 Over Canal Festival. Major re-development in Hereford city centre has resulted in the provision for a new canal bed which it is hoped will eventually link to a new terminal basin. Further development has also taken place on the Aylestone Park section, after the removal of silt containing heavy metals. Following partial restoration, which saw the Trust working on the park, and Herefordshire Council, owners of the park, working on the canal, a short section at Aylestone was used for a boat rally in May 2011. A slipway enabled the boats to be launched, and the canal will be made wider in due course. The canal connects to an un-navigable part of the River Severn, separated from the main channel by weirs at
Maisemore Maisemore is a village and civil parish in Gloucestershire, England. It lies on the A417 road 2.5 miles (4 km) northwest of Gloucester, on the west bank of the River Severn. In the 2001 census the parish had a population of 488, reducing ...
and Llanthony, both of which have derelict locks associated with them. Maisemore was sold by British Waterways some years ago, and they decided to dispose of Llanthony in 2007. The Canal Trust used a legacy to purchase the site, which includes two cottages, some land, and a small section of the River Severn as well as Llanthony lock. The lock is bigger than that at Maisemore, and access to the entrance lock at Over is easier because boats are travelling against the flow of the river as they approach it. At Newent, Bridge Street crossed over the canal on a bridge. When the railway replaced the canal, they constructed a high level bridge over the road, which was lowered to accommodate this solution. The Canal Trust envisaged that the canal could be rebuilt between the platforms of
Newent railway station Newent railway station served the town of Newent in Gloucestershire, England. It opened on 27 July 1885 when the Newent Railway and the Ross and Ledbury Railway (with whom the Newent Railway had an end on connection at ) opened their lines ...
, but this would have involved the construction of large embankments, which were thought to be out of scale with the environment. In 2019, they therefore reconsidered what options were possible, and proposed the use of an inclined plane, using a cradle running on rails to raise boats from the canal level up to the station, with a level section between the platforms, followed by another incline to reach the height required to cross the road and another incline to return boats to the level of the canal on the other side.


Visitor Centre

The Wharf House at Over Basin is a restored lock cottage that, until 2019, served as a visitor centre and restaurant. From its inception in 2005 until 2019, the Wharf House was operated by the Herefordshire & Gloucestershire Canal Trust, with profits donated to the H&G Canal Trust Charity. In 2019, management of the Wharf House was turned over to a private firm, and the restaurant was renamed The Lock Keepers.


See also

*
Canals of the United Kingdom The canals of the United Kingdom are a major part of the network of inland waterways in the United Kingdom. They have a varied history, from use for irrigation and transport, through becoming the focus of the Industrial Revolution, to today's ...
* History of the British canal system


Bibliography

* * * * * *


References


External links


Herefordshire & Gloucestershire Canal TrustHerefordshire & Gloucestershire Canal
on SoGlos.com {{DEFAULTSORT:Herefordshire And Gloucestershire Canal Canals in England Canals linked to the River Severn Canals in Gloucestershire Canals in Herefordshire Canals opened in 1798 Canals opened in 1845