Heavy Water Components Test Reactor (HWCTR) was an experimental
nuclear reactor A nuclear reactor is a device used to initiate and control a fission nuclear chain reaction or nuclear fusion reactions. Nuclear reactors are used at nuclear power plants for electricity generation and in nuclear marine propulsion. Heat fr ...
at the
Savannah River Site The Savannah River Site (SRS) is a U.S. Department of Energy (DOE) reservation in the United States in the state of South Carolina, located on land in Aiken, Allendale, and Barnwell counties adjacent to the Savannah River, southeast of August ...
in
Aiken County, South Carolina Aiken County is a county in the U.S. state of South Carolina. As of the 2020 Census, its population was 168,808. Its county seat and largest city is Aiken. Aiken County is a part of the Augusta- Richmond County, GA-SC Metropolitan Statistic ...
. It was commonly called "Hector."


History

It was constructed in 1958, starting in a temporary construction area, which is now called "B" Area. This is near the intersection of SRS roads "2" and "C." It is identified as Building 770-U. It has a cylindrical structure with a hemispherical dome. Its diameter is 70 ft (21.3 m) with a height of 125 ft (38.1 m). About 60 ft (18.3 m) is located underground. The building was designed to contain an internal pressure of 24 psig (165 kPa). It had a 70 MW thermal output. It was built to test the concept of a heavy water moderated and cooled reactor for civilian power. It was tested from late 1962 to December 1964. It was not restarted. The fuel was removed and the facility was secured by 1971. All auxiliary buildings were removed. The reactor building awaits its final disposition. During deactivation activities at the HWCTR in 2010, an unanticipated high dose was experienced during the removal of wire flux monitor cabling. On November 2, 2010, when work was in progress to remove the instrumentation, one of three small helium-filled ion chambers was removed from the instrumentation sleeve. A higher than expected dose rate was detected when the lowest of the three ion chambers exited the reactor vessel below the lower axial shield. As a result, three workers received whole body doses of 2.52 mREM, 2.7 mREM, and 5.6 mREM, which is equal to 1.5–3.3 average daily human exposures in the United States.Unanticipated, High Dose During the Removal of Wire Flux Monitor Cabling from the HWCTR Reactor Vessel
(D&D KM-IT Lessons Learned)