Framingham/Worcester Line
   HOME

TheInfoList



OR:

The Framingham/Worcester Line of the
MBTA Commuter Rail The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's transportation coverage of Greater Boston in the United States. Trains run over of track to 141 different stations, with 58 stati ...
system runs west from Boston, Massachusetts to
Worcester, Massachusetts Worcester ( , ) is a city and county seat of Worcester County, Massachusetts, United States. Named after Worcester, England, the city's population was 206,518 at the 2020 census, making it the second- most populous city in New England after ...
through the MetroWest region, serving 17 station stops in Boston, Newton, Wellesley, Natick,
Framingham Framingham () is a city in the Commonwealth of Massachusetts in the United States. Incorporated in 1700, it is located in Middlesex County and the MetroWest subregion of the Greater Boston metropolitan area. The city proper covers with a popul ...
, Ashland, Southborough,
Westborough Westborough is a town in Worcester County, Massachusetts, United States. The population was 21,567 at the 2020 Census, in over 7,000 households. Incorporated in 1717, the town is governed under the New England open town meeting system, headed ...
, Grafton, and Worcester. The third-longest and second-busiest line on the system, the Framingham/Worcester Line contends with interference from freight trains, and a number of non-handicapped-accessible stations. Service on the line is a mix of local and express trains serving Worcester plus short-turn Framingham locals. The Framingham/Worcester Line was one of the first commuter rail lines, with daily commuter-oriented service to West Newton beginning in 1834. Originally the
Boston and Worcester Railroad The Boston and Albany Railroad was a railroad connecting Boston, Massachusetts to Albany, New York, later becoming part of the New York Central Railroad system, Conrail, and CSX Transportation. The line is currently used by CSX for freight. Pass ...
, service has been operated by the
Boston and Albany Railroad The Boston and Albany Railroad was a railroad connecting Boston, Massachusetts to Albany, New York, later becoming part of the New York Central Railroad system, Conrail, and CSX Transportation. The line is currently used by CSX for freight. ...
,
New York Central The New York Central Railroad was a railroad primarily operating in the Great Lakes and Mid-Atlantic regions of the United States. The railroad primarily connected greater New York and Boston in the east with Chicago and St. Louis in the Mid ...
,
Penn Central The Penn Central Transportation Company, commonly abbreviated to Penn Central, was an American class I railroad that operated from 1968 to 1976. Penn Central combined three traditional corporate rivals (the Pennsylvania, New York Central and th ...
, and since 1964 by
Boston and Maine Railroad The Boston and Maine Railroad was a U.S. Class I railroad in northern New England. Originally chartered in 1835, it became part of what was the Pan Am Railways network in 1983 (most of which was purchased by CSX in 2022). At the end of 1970 ...
,
Amtrak The National Railroad Passenger Corporation, doing business as Amtrak () , is the national passenger railroad company of the United States. It operates inter-city rail service in 46 of the 48 contiguous U.S. States and nine cities in Canada. ...
, and the MBCR until 2014 under contract to the
MBTA The Massachusetts Bay Transportation Authority (abbreviated MBTA and known colloquially as "the T") is the public agency responsible for operating most public transportation services in Greater Boston, Massachusetts. The MBTA transit network i ...
. Since 2014 service has been operated by Keolis North America. In 1975 the line was cut back to Framingham, but service returned to Worcester in 1994 with four infill stations added between 2000 and 2002. After purchasing the Framingham–Worcester trackage from CSX in 2012, the MBTA has begun adding service to the outer section of the line and performing track work to increase speeds and reliability. A new station at Boston Landing opened in 2017. All stations from Boston Landing east and West Natick west are
accessible Accessibility is the design of products, devices, services, vehicles, or environments so as to be usable by people with disabilities. The concept of accessible design and practice of accessible development ensures both "direct access" (i. ...
; is being reconstructed for accessibility, while renovations to the six remaining stations are planned.


History

Originally built in 1834 as the
Boston and Worcester Railroad The Boston and Albany Railroad was a railroad connecting Boston, Massachusetts to Albany, New York, later becoming part of the New York Central Railroad system, Conrail, and CSX Transportation. The line is currently used by CSX for freight. Pass ...
, the line was later part of the
Boston and Albany Railroad The Boston and Albany Railroad was a railroad connecting Boston, Massachusetts to Albany, New York, later becoming part of the New York Central Railroad system, Conrail, and CSX Transportation. The line is currently used by CSX for freight. ...
and
New York Central Railroad The New York Central Railroad was a railroad primarily operating in the Great Lakes and Mid-Atlantic regions of the United States. The railroad primarily connected greater New York and Boston in the east with Chicago and St. Louis in the Mi ...
systems. The Massachusetts Turnpike Authority acquired the tracks from Newton to
Back Bay station Back Bay station (also signed as Back Bay · South End) is an intermodal passenger station in Boston, Massachusetts. It is located just south of Copley Square in Boston's Back Bay and South End neighborhoods. It serves MBTA Commuter Rail and M ...
in order to construct the Boston Extension of the
Massachusetts Turnpike The Massachusetts Turnpike (colloquially "Mass Pike" or "the Pike") is a toll highway in the US state of Massachusetts that is maintained by the Massachusetts Department of Transportation (MassDOT). The turnpike begins at the New York state li ...
from the Route 128 circumferential highway to the then-elevated
Central Artery The Central Artery (officially the John F. Fitzgerald Expressway) is a section of freeway in downtown Boston, Massachusetts; it is designated as Interstate 93, US 1 and Route 3. The original Artery, constructed in the 1950s, was named aft ...
in downtown Boston. Construction ran from 1962 to 1964, and reduced the railway to two tracks. The New York Central was merged into
Penn Central Transportation The Penn Central Transportation Company, commonly abbreviated to Penn Central, was an American Railroad classes, class I railroad that operated from 1968 to 1976. Penn Central combined three traditional corporate rivals (the Pennsylvania Railroad ...
in 1968, which went bankrupt in 1970.
Amtrak The National Railroad Passenger Corporation, doing business as Amtrak () , is the national passenger railroad company of the United States. It operates inter-city rail service in 46 of the 48 contiguous U.S. States and nine cities in Canada. ...
was created in 1971 to take over intercity rail service from the private railroads. When Amtrak started operations on May 1, 1971, no intercity service was kept on the line, thus ending direct connections from Boston to Springfield, Pittsfield, and Albany. In mid-May, Amtrak added the Boston-New Haven '' Bay State''. The train struggled to find consistent ridership, with frequent changes of schedule and destination. In 1973, the westbound trip operated as a quasi-commuter train. The ''Bay State'' was canceled on March 1, 1975. On January 27, 1973, the
Massachusetts Bay Transportation Authority The Massachusetts Bay Transportation Authority (abbreviated MBTA and known colloquially as "the T") is the public agency responsible for operating most public transportation services in Greater Boston, Massachusetts. The MBTA transit network ...
(MBTA) acquired the remainder of the tracks east of
Framingham Framingham () is a city in the Commonwealth of Massachusetts in the United States. Incorporated in 1700, it is located in Middlesex County and the MetroWest subregion of the Greater Boston metropolitan area. The city proper covers with a popul ...
, and began subsidizing service between Framingham and Boston. Commuter rail service between Worcester and Framingham (with no intermediate stops after 1960) was not subsidized by the MBTA; with just ten riders per day riding from Worcester, service was cut back to Framingham on October 27, 1975. Amtrak began operating a Boston-Albany section of the '' Lake Shore Limited'' four days later. Boston-New Haven ( Inland Route) service was restored under the ''Bay State'' name in 1984, and ran in various forms until the early 2000s. The trackage on the western segment was inherited by
Conrail Conrail , formally the Consolidated Rail Corporation, was the primary Class I railroad in the Northeastern United States between 1976 and 1999. The trade name Conrail is a portmanteau based on the company's legal name. It continues to do bus ...
in 1976, which returned to profitability in the 1980s; after a corporate breakup in 1999,
CSX Transportation CSX Transportation , known colloquially as simply CSX, is a Class I freight railroad operating in the Eastern United States and the Canadian provinces of Ontario and Quebec. The railroad operates approximately 21,000 route miles () of track. ...
became the owner of the Worcester-to-Framingham segment. Service along the remaining Boston-Framingham segment was considerably increased in October 1979; this was intended to partially compensate for the closure of the
Needham Line The Needham Line is a branch of the MBTA Commuter Rail system, running west from downtown Boston, Massachusetts through Roxbury, Jamaica Plain, Roslindale, West Roxbury, and the town of Needham. The second-shortest line of the system at jus ...
that month to make room for Southwest Corridor construction. As part of the Southwest Corridor project, the Orange Line was rerouted into parallel tracks sharing the Framingham Line's right of way between Back Bay station and the portal to the Washington Street Tunnel. MBTA commuter rail service expanded to
Worcester Worcester may refer to: Places United Kingdom * Worcester, England, a city and the county town of Worcestershire in England ** Worcester (UK Parliament constituency), an area represented by a Member of Parliament * Worcester Park, London, Engla ...
on September 26, 1994, with limited rush-hour-only service. Off-peak service was added beginning on December 14, 1996. Worcester Union Station underwent a major renovation in 2000, and in 2006 the city's main bus terminal was co-located at the train station. Infill stations at , , , and were added in 2000 and 2002. The total cost of the Worcester Commuter Rail Extension Project was $97 million.


Ownership and performance problems

For a variety of reasons, the line had some of the worst on-time performance in the MBTA system for several years. While state agencies including the MBTA owned the line out to Framingham,
CSX Transportation CSX Transportation , known colloquially as simply CSX, is a Class I freight railroad operating in the Eastern United States and the Canadian provinces of Ontario and Quebec. The railroad operates approximately 21,000 route miles () of track. ...
owned from Framingham to Worcester and ran frequent freight trains as far east as
Beacon Park Yard Beacon Park Yard was a CSX Transportation rail yard in Allston, Boston, now owned by Harvard University. The yard opened in 1890 on the site of a former trotting park, from which it took its name. It was closed in 2013 following the relocation ...
in
Allston Allston is an officially recognized neighborhood within the City of Boston, Massachusetts, United States. It was named after the American painter and poet Washington Allston. It comprises the land covered by the zip code 02134. For the most pa ...
. CSX then dispatched (controlled signals) on the line from their operations base in
Selkirk, New York Selkirk is a hamlet in the town of Bethlehem, Albany County, New York, United States. It is located south of the city of Albany and is a suburb of that city. A major freight railyard operated by the Selkirk Subdivision of CSX Transportation ...
, resulting in low priority for passenger trains. Conflicts with freight trains, ongoing track work, and an increase of passenger load of about 40% since opening were all blamed for the poor on-time performance, as were new federal speed regulations that went into effect in 2005. In 2007, pessimistic that CSX would ever sell the line, the state Executive Office of Transportation began studying alternatives to improve service. Possibilities included adding interlockings or additional tracks to the line, or even running service from Worcester to North Station via over the Pan Am Railways Worcester Branch (former Worcester, Nashua and Rochester Railroad) and the
Fitchburg Line The Fitchburg Line is a branch of the MBTA Commuter Rail system which runs from Boston's North Station to Wachusett station in Fitchburg, Massachusetts. The line is along the tracks of the former Fitchburg Railroad, which was built across northe ...
. In October 2007, only 48.4% of trains ran on time (no more than 1 minute early or 5 minutes late), improving to 69.3% in January 2008 after CSX and MBCR officials began meeting daily. On February 18, 2008, a new schedule went into effect, intended to more accurately reflect the run time on the line. By August 2009, actual on-time performance was at 82%. In January 2008, the Framingham/Worcester Line became the first in the MBTA system to offer
Wi-Fi Wi-Fi () is a family of wireless network protocols, based on the IEEE 802.11 family of standards, which are commonly used for local area networking of devices and Internet access, allowing nearby digital devices to exchange data by radio waves ...
service aboard the trains. The service was expanded system-wide after a test period, but the Worcester Line was chosen for the pilot phase in part to compensate for low on-time performance, as well as to test the service across the line's varied terrain. On October 2, 2008, the state government announced an agreement with
CSX Transportation CSX Transportation , known colloquially as simply CSX, is a Class I freight railroad operating in the Eastern United States and the Canadian provinces of Ontario and Quebec. The railroad operates approximately 21,000 route miles () of track. ...
for the purchase and upgrade of several of CSX's freight lines in the state. CSX agreed to sell the Framingham-to-Worcester section of the
Worcester Line The Framingham/Worcester Line of the MBTA Commuter Rail system runs west from Boston, Massachusetts to Worcester, Massachusetts through the MetroWest region, serving 17 station stops in Boston, Newton, Wellesley, Natick, Framingham, Ashlan ...
, its lines from Taunton to Fall River and New Bedford for use by the
South Coast Rail South Coast Rail is a project to build a new southern line of the MBTA Commuter Rail system along several abandoned and freight-only rail lines. The line has been planned to restore passenger rail service between Boston and the cities of Taunton, ...
project, the Grand Junction Branch, and the South Boston Running Track. Other parts of the agreement included plans for double-stack freights west of Worcester and the abandonment of Beacon Park Yard. Weekday Worcester service was increased to twelve round trips on October 27, 2008, under the agreement. The agreement was signed on September 23, 2009, with the Worcester Line transfer then expected in 2011.


Service expansions

In June 2012, New Balance announced plans to build a new station stop at their new development in Allston-Brighton. was originally to open in 2014, but was delayed until May 22, 2017. In July 2012, the MBTA announced plans to add additional service on the line as CSX moved freight transload operations from Beacon Park Yard in Allston to a new yard in East Worcester that did not interfere with passenger operations. Three additional weekday Boston-Worcester round trips were added on October 29, 2012, after the October 4 signing of the deed that transferred ownership of the Framingham-Worcester section to the MBTA. A rush-hour express serving Worcester was added on April 29, 2013. The ultimate goal was originally for 20 Worcester round trips by October 2013, up from 12.5 round trips before the service increases; however this was pushed back by delays in the rebuilding of Yawkey station and the delivery of the new
MPI HSP46 The MPI HSP46 is a four-axle AC-traction diesel-electric locomotive for commuter trains, designed and assembled by MotivePower. It meets EPA Tier 3 emissions standards. The launch customer is the Massachusetts Bay Transportation Authority (MBTA) ...
locomotives and bilevel passenger cars. By early 2013, Beacon Park was largely vacated except for the locomotive maintenance facility, leaving only occasional freight service east of Framingham. MBCR took over dispatching of the line from CSX in August 2013, meaning that passenger trains are now given full priority over freight trains. The dispatching changeover brings other benefits for passenger service: MBCR has greater flexibility to deal with minor emergencies affecting operations, to communicate directly with train crews, and to dispatch extra trains to cover for a late or stalled train. Blanket heat-related speed restrictions were intended to be eliminated, limiting delays even on hotter summer days. A series of public comment hearings in 2013 were held to determine schedules. Implementation of the new schedules was delayed because the completion of Yawkey station's rehabilitation and expansion was delayed. The expansion included installation of a second track, crucial to the service expansion. The increase to 20 weekday and 9 weekend round trips to Worcester took place on March 10, 2014. The MBTA has long been planning to speed travel times on the line by adding a second main track through
Beacon Park Yard Beacon Park Yard was a CSX Transportation rail yard in Allston, Boston, now owned by Harvard University. The yard opened in 1890 on the site of a former trotting park, from which it took its name. It was closed in 2013 following the relocation ...
– the only single-track section of the line. The former second track through the yard was turned into a yard lead with no through service in the 1950s. In November 2013, MassDOT announced plans to spend $15 million through 2014 and 2015 to improve travel times on the line. Some of the work involves heating and cutting quarter-mile rail segments to eliminate heat kinks. The promised reduction in heat-related speed restrictions has not yet occurred due to the poor condition of the tracks; the work to reduce them started in 2014 with $1.2 million in work between Worcester and Grafton, but will not be complete until 2016. In early 2014,
MassDOT The Massachusetts Department of Transportation (MassDOT) oversees roads, public transit, aeronautics, and transportation licensing and registration in the US state of Massachusetts. It was created on November 1, 2009, by the 186th Session of t ...
proposed DMU local service for the inner part of the line as part of the " Indigo Line". In September 2014,
MassDOT The Massachusetts Department of Transportation (MassDOT) oversees roads, public transit, aeronautics, and transportation licensing and registration in the US state of Massachusetts. It was created on November 1, 2009, by the 186th Session of t ...
announced plans to build the multimodal in Beacon Park Yard as a transfer point between local DMU service and mainline locomotive-hauled commuter rail service. The $25 million station would have been constructed simultaneously with a $260 million reconfiguration of the Mass Pike through Beacon Park Yard and was planned to open in 2020. Plans for DMU service were cancelled in 2015, and West Station was delayed to 2040. On May 23, 2016, the MBTA began running a single daily round trip – inbound in the morning rush, outbound in the late evening – with no intermediate stops between Yawkey (later renamed to Lansdowne) and Worcester. Branded "HeartToHub", the trips were scheduled for travel times of under one hour between Back Bay and Worcester, slightly faster than the driving time between those two locations.


COVID-19 cuts and construction projects

Weekday service was substantially cut on March 17, 2020, due to reduced ridership during the
COVID-19 pandemic The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identi ...
. On June 22, service was increased, but all trains continued to run local. Schedule changes effective November 2, 2020 re-added express service, including the Heart to Hub service (with an added Framingham stop). Reduced service operated from December 14, 2020, to April 5, 2021, again as part of systemwide reductions. Service changes on April 5, 2021, began the transition to a
regional rail Regional rail, also known as local trains and stopping trains, are passenger rail services that operate between towns and cities. These trains operate with more stops over shorter distances than inter-city rail, but fewer stops and faster serv ...
model, with hourly Boston–Worcester service. Worcester service operates express between Boston Landing and West Natick at peak hours, with hourly Boston–Framingham local trains at those times to provide service to the inner part of the line. Because the single-platform Newton stations can only be served by trains in one direction at peak service levels, a "Newton Connection Railbus" bus shuttle operated between and to provide reverse-peak service to the stations. The bus shuttle ended service on August 27, 2021, as route bus service resumed two days later. By October 2022, the line had 10,606 daily riders – 57% of pre-COVID ridership. A three-year reconstruction of Natick Center station began in March 2020, followed by the addition of a second platform at Worcester Union Station beginning in late 2021. Midday service was reduced beginning May 2, 2022, to accommodate the construction projects. That schedule has 16 weekday Boston–Worcester round trips plus three outbound and five inbound Framingham trains; weekend service is ten Boston–Worcester round trips. In June 2021, the MBTA issued a $28 million design contract for a project to add a third track from Weston to Framingham, including reconstruction of the three Wellesley stations and West Natick station. The project was expected to cost around $400 million, with completion in 2030. Renovations to the three Newton stations (including the addition of second platforms) are also planned.


Station listing


References


External links


MBTA – Framingham/Worcester Line

B&A Track Charts

The Boston & Albany Railroad Webpage
{{DEFAULTSORT:Framingham Worcester Line MBTA Commuter Rail