Stord Bridge (Stordabruo)-edit.jpg
   HOME

TheInfoList



OR:

The Stord Bridge ( no, Stordabrua) is a suspension bridge which crosses
Digernessundet Digernessundet is a strait in the municipality of Stord in Vestland county, Norway. The long strait runs between the islands of Føyno and Stord, which connects the Stokksundet to the north with the Bømlafjorden Bømlafjorden ( en, Bømla F ...
between the islands of
Stord Stord is a municipality in Vestland county, Norway. It is located in the traditional district of Sunnhordland. Stord is sometimes called "Norway in miniature" since it has such a variety of landscapes: coastline, fjords, forests, agricultural ...
and
Føyno Føyno is an island in Stord municipality in Vestland county, Norway. The island lies southwest of the island of Stord at the southern end of the Stokksundet sound. The Digernessundet strait runs between Stord and this island. Føyno had a c ...
in Stord Municipality in
Vestland Vestland is a county in Norway established on 1 January 2020. The county is located in Western Norway and it is centred around the city of Bergen, Norway's second largest city. The administrative centre of the county is the city of Bergen, where t ...
county,
Norway Norway, officially the Kingdom of Norway, is a Nordic country in Northern Europe, the mainland territory of which comprises the western and northernmost portion of the Scandinavian Peninsula. The remote Arctic island of Jan Mayen and the ...
. The bridge is long, has a main
span Span may refer to: Science, technology and engineering * Span (unit), the width of a human hand * Span (engineering), a section between two intermediate supports * Wingspan, the distance between the wingtips of a bird or aircraft * Sorbitan ester ...
of and a clearance below of . It carries two lanes of European Route E39 and a combined pedestrian and bicycle pathway. It is part of the
Triangle Link The Triangle Link ( no, Trekantsambandet) is a fixed link with three branches that connects the islands of Stord and Bømlo to each other and to the mainland at Sveio, Norway. It consists of the underwater Bømlafjord Tunnel from Sveio to the i ...
, a
fixed link A bridge is a structure built to span a physical obstacle (such as a body of water, valley, road, or rail) without blocking the way underneath. It is constructed for the purpose of providing passage over the obstacle, which is usually somethi ...
which connects Stord to
Bømlo Bømlo is a municipality in the southwestern part of Vestland county, Norway. It is located in the traditional district of Sunnhordland. The administrative centre of the municipality is the village of Svortland. Other villages in Bømlo includ ...
, and both to the mainland. In 2010, the bridge had an average 5,021 vehicles per day. The bridge and the link was a
toll road A toll road, also known as a turnpike or tollway, is a public or private road (almost always a controlled-access highway in the present day) for which a fee (or ''Toll (fee), toll'') is assessed for passage. It is a form of road pricing typically ...
from the opening until 30 May 2013. Plans for a crossing arose in the 1960s; and until the 1990s proposals were for a
pontoon bridge A pontoon bridge (or ponton bridge), also known as a floating bridge, uses floats or shallow-draft boats to support a continuous deck for pedestrian and vehicle travel. The buoyancy of the supports limits the maximum load that they can carry. ...
further north. The Stord Bridge was conceived after the decision to combine the crossing with the Bømlafjord Tunnel. The project was resisted both by local environmental groups and the
Norwegian Public Roads Administration The Norwegian Public Roads Administration ( no, Statens vegvesen) is a Norwegian government agency responsible for national and county public roads in Norway. This includes planning, construction and operation of the national and county road netw ...
, the latter because the new plans would delay completion. Construction was undertaken by a joint venue between NCC and HBG Steel Structures. Construction started in 1999 and was the first bridge in Norway to have the cables spun on-site. The bridge cost 442 million Norwegian krone (NOK) and was taken into use on 27 December 2000.


Background

The motivation for the Triangle Link was the desire to have a fixed link between the islands of Stord and Bømlo. The first documented proposals were made in the 1960s and involved building a pontoon bridge across Stokksundet, inspired by the plans to build what would become the
Nordhordland Bridge The Nordhordland Bridge ( no, Nordhordlandsbrua) is a combined cable-stayed and pontoon bridge which crosses Salhusfjorden between Klauvaneset (in Bergen Municipality) and the island of Flatøy (in Alver Municipality) in Vestland county, Norway. ...
north of
Bergen Bergen (), historically Bjørgvin, is a city and municipality in Vestland county on the west coast of Norway. , its population is roughly 285,900. Bergen is the second-largest city in Norway. The municipality covers and is on the peninsula o ...
. In 1973, the municipal councils of Bømlo,
Stord Stord is a municipality in Vestland county, Norway. It is located in the traditional district of Sunnhordland. Stord is sometimes called "Norway in miniature" since it has such a variety of landscapes: coastline, fjords, forests, agricultural ...
and Fitjar decided to launch a planning process, which concluded that a pontoon bridge between
Sørstokken Sørstokken is a peninsula on the island of Stord in Stord Municipality in Vestland county, Norway. The peninsula is long and about wide. It is connected to the main part of the island by a wide isthmus. Other than a small residential area ...
and Foldrøyholmen would be optimal. The report also considered bridges across the
Fitjar Archipelago Fitjar () is a municipality in Vestland county, Norway. The municipality is located in the traditional district of Sunnhordland. Fitjar municipality includes the northern part of the island of Stord and the hundreds of surrounding islands, most ...
and a crossing via Spissøy and Føyno. There were protests from the shipping industry, who wished to continue to use the strait for ship traffic.Hauge: 32 The islands were connected with a network of five ferry services: Skjersholmane–Valevåg connected Stord and Sveio, Skjersholmane–Utbjoa connected Stord and Vindafjord, Sagvåg–Siggjarvåg connected Stord and Bølmo, and Bømlo was connected to the mainland both by the
Mosterhamn–Valevåg Ferry Mosterhamn–Valevåg Ferry was an automobile ferry which connected the island community of Bømlo to the mainland in Sveio. The route was operated by Hardanger Sunnhordlandske Dampskipsselskap (HSD) and ran between Mosterhamn on Bømlo to Valevà ...
and the Langevåg–Buavåg Ferry.Hauge: 100 In the early 1980s, plans for Stord Airport, Sørstokken were launched. Thus, the plans for a bridge crossing Stokksundet were again raised in 1982, this time by the industry on Bømlo, who would have to travel by ferry to reach the new airport. A committee was established in May 1983, which gave Engineer Harald Møyner the assignment of producing a new report. He launched three proposals: a pontoon or suspension bridge between Foldrøyholmen and Litlaneset; a suspension bridge between Setraneset and Sokkbleikjo, which would terminate just south of the new airport; and a combined fixed link between Spissøy and Digernes, without passing via the Fitjar Archipelago. The latter proposal was the first time a fixed link to the mainland was proposed.Hauge: 33 The Norwegian Civil Aviation Administration protested against a possible suspension bridge near the airport, but stated that one further away would be fine.Hauge: 34 Surveys of traffic patterns on Bømlo were undertaken by
Vestland Vestland is a county in Norway established on 1 January 2020. The county is located in Western Norway and it is centred around the city of Bergen, Norway's second largest city. The administrative centre of the county is the city of Bergen, where t ...
Public Roads Administration in 1984. Based on it and other feedback, the agency stated that it preferred a pontoon bridge between Foldrøyholmen and Sørstokken, north of the ferry between Bømlo and Stord. It was estimated to cost NOK 190 million, in addition to auxiliary roads for NOK 40 million. In 1982, plans were launched for a fixed link to the mainland further south, which would include a bridge over Digernessundet, a causeway and low bridge across Spissøysundet and a low bridge over Gassasundet. In addition, a tunnel would have to be built from Føyno to Sveio. This proposal was similar to the finalized Triangle Link. In 1985, an all-tunnel proposal, following the same route, was proposed. Hordaland Public Roads Administration stated that the proposals were unrealistic. The limited company Ytre Sunnhordland Bru- og Tunnelselskap AS (SBT) was founded in October 1986 by the municipalities of Bømlo, Stord, Fitjar and Sveio,
Hordaland County Municipality Hordaland County Municipality ( no, Hordaland fylkeskommune) was the regional governing administration of the old Hordaland county in Norway. The county municipality was established in its most recent form on 1 January 1976 when the law was change ...
and five banks.Hauge: 35 In December 1986, the Public Road Administration recommended a bridge solution. SBT changed its name to Sunnhordland Bru- og Tunnelselskap, and a majority of the board shifted towards being in favor of a fixed link. The
Norwegian Coastal Administration Norwegian Coastal Administration ( no, Kystverket) is a Norwegian government agency responsible for the water transport infrastructure along the 9,200 km Coast of Norway. It is responsible for coastal navigation infrastructure, pilotage a ...
stated that they would not allow a pontoon bridge. On 26 June 1987, SBT decided to work towards permission to collect advanced tolls on the ferry services. The board unanimously supported the triangular proposal on 16 September, which was estimated to cost NOK 660 million. This was criticized by Hordaland Public Roads Administration, who stated that it would take longer time to plan, and thus complete, the Triangle Link. From 1988, environmentalists started actively opposing the Triangle Link. The most active were the local chapter of the Norwegian Society for the Conservation of Nature and
Nature and Youth Natur og Ungdom (NU) which translates Nature and Youth, also known in English as Young Friends of the Earth Norway, is a Norwegian youth environment protecting organisation. It is the only environmentalist youth organisation in Norway. 7,000 memb ...
, who stated that the road would have serious consequences for the local boat traffic to the recreational islands of Føyno and Nautøy. Instead, they recommended that the municipalities chose a pontoon bridge. Another opponent to the project was the Action Committee Against a Hasty Construction of the Triangle Link, who argued to delay the decision until after the 1991 municipal elections, to ensure that the municipal councils had backing in the public. Gisle Tjong stated that the risk in the project was large and that it was uncertain how long the tolls would last: they could just as well be 60 as 15 years. He instead wanted to collect tolls in advance.Hauge: 52 The Triangle Link was passed by the various municipal councils in February and March 1988. Hordaland Public Roads Administration still supported a pontoon bridge, and stated that two and a half years of work on a master plan had been wasted. A new master plan for the Triangle Link was published in early 1989. During late 1989, advance tolls on the ferries was approved by the municipal councils and the county council. They recommended that collection start on 1 July 1990, but this was not immediately supported by the government.Hauge: 47 In July 1991, the master plan was passed by the
Council of State A Council of State is a governmental body in a country, or a subdivision of a country, with a function that varies by jurisdiction. It may be the formal name for the cabinet or it may refer to a non-executive advisory body associated with a head o ...
.Hauge: 59 On 10 December 1992,
Parliament In modern politics, and history, a parliament is a legislative body of government. Generally, a modern parliament has three functions: representing the electorate, making laws, and overseeing the government via hearings and inquiries. Th ...
approved advanced payment of tolls on the ferry, which were made effective from 1 January 1993. Ticket prices increased with between NOK 10 and 12. This resulted in protests from the ferry employees who stated that they would have to collect the tolls which would remove their jobs.Hauge: 60 Work on the development plan started in 1992. It included safety and environmental improvements which increased the project's cost by NOK 200 million. In May 1994, the plans was made subject to consultative statements. In May, SBT proposed building a culvert on Digernes as a compromise to avoid a new plan which could have postponed the project several years. On 11 June 1996, Parliament approved with 144 against 20 votes to build the Triangle Link. The original name proposal for the bridge was ; this was later changed to after input from the municipal councils and name committees.


Construction

The construction of the Stord Bridge was undertaken as part of the same contract as the Bømla Bridge, which was awarded in December 1998 to Triangle Contractors, a joint venture between NCC and HBG Steel Structures. Most of the work was carried out by NCC with HBG having responsibility for the steel parts of the deck and the cables. HBG had previously built the steel for the
Osterøy Bridge The Osterøy Bridge ( no, Osterøybrua) is a suspension bridge in Vestland county, Norway. The bridge connects the Kvisti farm area on the island of Osterøy in Osterøy Municipality with the Herland farm area on the mainland in Bergen Municipa ...
, which opened in 1997. The responsibility for the cables was given to Brown Beach Associates and Hordaland Mekaniske Verksted.Hauge: 77 Construction started on 20 February 1999. After the
pylons Pylon may refer to: Structures and boundaries * Pylon (architecture), the gateway to the inner part of an Ancient Egyptian temple or Christian cathedral * Pylon, a support tower structure for suspension bridges or highways * Pylon, an orange mar ...
were completed on 25 September 1999, two
catwalks A fashion show (French ''défilé de mode'') is an event put on by a fashion designer to showcase their upcoming line of clothing and/or accessories during a fashion week. Fashion shows debut every season, particularly the Spring/Summer and Fal ...
were erected between them, with the constructors choosing two continuous catwalks instead of three separate pairs. Extra stability to the catwalks was achieved by building connections between the two. The cables were spun on-site using a
reel A reel is an object around which a length of another material (usually long and flexible) is wound for storage (usually hose are wound around a reel). Generally a reel has a cylindrical core (known as a '' spool'') with flanges around the ends ...
because of the problems which had arisen using a bundle on the
Great Belt Bridge The Great Belt Bridge ( da, Storebæltsbroen) or Great Belt fixed link ( da, Storebæltsforbindelsen) is a multi-element fixed link crossing the Great Belt strait between the Danish islands of Zealand and Funen. It consists of a road suspension ...
in Denmark. This also allowed for cost savings, as the reels could be used two times. The cables were spun using air spinning with controlled tension, which allowed spinning with little space and with a crew with limited spinning experience. This involved installing a carrier which shuttles forward and back over the catwalk; it spins the upper side of the cable in the one direction and the lower side in the other direction. The system has two reel racks, each with four reels of wire. Each rack only uses one reel at a time, allowing for minimum down-time when changing reels. Wires were connected using pressure casing. The balance in the system is kept in place using a counterbalance tower.Hauge: 81 Spinning of the main cable started on 2 March 2000 and was concluded on 14 April. In all of steel wire were used to create the cables. The two bridges were the first time that on-site spinning was chosen in Norway, and it gave a cost saving of NOK 10 to 11 million.Hauge: 104 The cables consist of seven bundles which consist of 420 wires—each with a diameter of . When compressed, this gives a diameter of and a quality of 1,570
megapascal The pascal (symbol: Pa) is the unit of pressure in the International System of Units (SI), and is also used to quantify internal pressure, stress, Young's modulus, and ultimate tensile strength. The unit, named after Blaise Pascal, is define ...
s. The fastening poles were delivered five weeks after schedule; a new mounting method was developed which allowed them to be installed in a quarter of the time, in part by using a helicopter, and the whole five-week delay was eradicated. This allowed the deck sections to be installed as scheduled. There arose problems with small holes being created in the coating; as these had also been found on the Great Belt Bridge, it was decided that nothing would be done with the issue. The deck sections were produced by HBG in Schiedam, Netherlands, and transported by Barge to Stord. Each section is long and consisted of two welded subsections. They were mounted using the crane ship ''Uglen'', allowing up to nine and an average of four sections to be installed per day and completed in June 2000.Hauge: 105 The section of the bridge built as a beam bridge on the Føyno side was built by filling in the shallow fjord under the bridge with earthwork, building the bridge and then removing the earthwork again. Construction took 700,000
man-hour A man-hour (sometimes referred to as person-hour) is the amount of work performed by the average worker in one hour. It is used for estimation of the total amount of uninterrupted labor required to perform a task. For example, researching and wr ...
s and cost NOK 442 million. The bridge was taken into use along with the Bømlafjord Tunnel on 27 December 2000. The bridge allowed, along with the rest of the Triangle Link, four ferry services to terminate.


Specifications

The Stord Bridge is a long suspension bridge with a long main span. It carries two lanes of European route E39 and a combined pedestrian and bicycle path across Digernessundet, connecting the islands of Stord and Føyno. The bridge has a width of and a clearance below of . It has two concrete pylons, each tall, one on Digernesklumpen on Stord, the other on a small islet just off Føyno. The pylons consist of of concrete and of steel. The deck between the towers consists of 19 pre-built steel sections, each long and tall. They are connected to the main suspended cable, which is thickHauge: 83 and long, by vertical cables every . The bridge's vertical curvature has a radius of . In 2012, the bridge had an average 5,284 vehicles per day. The bridge was paid off and the tolls removed on 30 April 2013.


References

;Bibliography * ;Notes {{Good article Suspension bridges in Norway Road bridges in Vestland Bridges completed in 2000 2000 establishments in Norway European route E39 in Norway Former toll bridges in Norway Stord