East West Metro Tunnel is a constructed underwater river tunnel of
Kolkata Metro The Kolkata Metro is a rapid transit system serving the city of Kolkata in West Bengal, India. , it has two operational lines, a line from Dakshineswar to Kavi Subhash and a line from Salt Lake Sector V to Sealdah, for a total of . Four ...
in
Kolkata Kolkata (, or , ; also known as Calcutta , the official name until 2001) is the capital of the Indian state of West Bengal, on the eastern bank of the Hooghly River west of the border with Bangladesh. It is the primary business, comme ...
,
West Bengal West Bengal (, Bengali: ''Poshchim Bongo'', , abbr. WB) is a state in the eastern portion of India. It is situated along the Bay of Bengal, along with a population of over 91 million inhabitants within an area of . West Bengal is the fourt ...
. The river tunnel is constructed underneath Hooghly River. After the
CESC Tunnel The CESC Tunnel is situated under the Hooghly River in Kolkata, West Bengal, India. This is the first underwater tunnel in Asia, completed in 1931. It is using for electric power transmission from Kolkata to Howrah. History This tunnel was not m ...
in 1931, this is the second underwater river tunnel of Hooghly River. Besides, It is the first underwater river
tunnel A tunnel is an underground passageway, dug through surrounding soil, earth or rock, and enclosed except for the entrance and exit, commonly at each end. A pipeline is not a tunnel, though some recent tunnels have used immersed tube cons ...
of
South Asia South Asia is the southern subregion of Asia, which is defined in both geographical and ethno-cultural terms. The region consists of the countries of Afghanistan, Bangladesh, Bhutan, India, Maldives, Nepal, Pakistan, and Sri Lanka.;;;;;;;; ...
and as well as
India India, officially the Republic of India (Hindi: ), is a country in South Asia. It is the seventh-largest country by area, the second-most populous country, and the most populous democracy in the world. Bounded by the Indian Ocean on the so ...
, which is made for Metro Rail service. The East West Metro Tunnel length is and width is . A 520m stretch of the tracks will go through a tunnel under the Hooghly River. The roof of the tunnel would be about 30 metres from the ground level. The tunnel is been completed in 2021. The tunnel is used by East West Metro Line for metro rail service and constructed by
Kolkata Metro Rail Corporation Kolkata Metro Rail Corporation (KMRC) is a Government of India enterprise formed in 2008. The agency was formed to oversee the implementing Kolkata Metro Line 2, also known as East West Metro, connecting the twin cities Kolkata and Howrah. The ...
.


Construction

The section between
Sealdah metro station Sealdah Metro Station is an operational station on Line 2 of the Kolkata Metro, located in Sealdah, Kolkata. The underground station adjoins with the Sealdah railway station of the Indian Railways on its eastern side. The Sealdah Court is on t ...
and
Mahakaran metro station Mahakaran metro station, also known as New Mahakaran metro station (both are officially correct), is a station of Line 2 (East-West Metro) of the Kolkata Metro, located in B.B.D. Bagh area. There are many British heritage buildings near the st ...
was realigned due to the inability of GoWB to provide land on the surface along the original route. Even on the new alignment a station planned at Wellington had to be dropped as Government of West Bengal was unable to provide the required land on the surface. Work at Howrah Maidan have started in March 2016. The section between
Howrah Maidan metro station Howrah Maidan Metro Station is a station of the Kolkata Metro Line 2 in Howrah Maidan, Howrah, India. The underground station is located near the Howrah Municipal Corporation Stadium and the Howrah Sarat Sadan. It is the terminus of Line 2 o ...
and
Esplanade metro station The Esplanade metro station is a station of the Kolkata Metro. The station is located in the Esplanade neighbourhood of Kolkata, at the northern end of Chowringhee Road/Jawaharlal Nehru Road near New Market and the Oberoi Grand hotel. It ope ...
has been built by Afcons – Transtonnelstroy JV team, two tunnel boring machines from Herrenknecht are being used to dig the tunnel. This section passes through the Hooghly River for a distance of 520 meters. The section under the river is at a depth of 30 meters (roof to ground distance) whereas the average roof to ground distance is 17 meters. The
Howrah metro station Howrah metro station is a metro station of Kolkata Metro Line 2 in Howrah, India. Built underneath Howrah railway station's new complex, the metro station allows interchanging with other zones of Indian Railways as part of the Howrah station ...
on the west side of the river will be at a depth of 30 meters. Tunnelling started from Howrah Maidan side. On 23 May one of the TBM named Rachna completed the tunneling under the Hooghly River in 36 days. The other TBM named Prerna also completed the tunnelling work under the river on 21 June 2017. There were some concerns during tunnelling under Brabourne Road as the tunnel would pass within 100 meters of heritage structures and there were also many old and dilapidated buildings in this section. KMRC received permission from Archaeological Survey of India in June 2017. Residents and shops in the old building were temporarily shifted and the buildings were reinforced before construction of tunnel. Construction of tunnel until Mahakaran station was completed in November 2017. For the Mahakaran–Esplanade section tunnelling of one of the tunnel has been completed on 23 March 2018 the other tunnel has also been completed by April. In this sections also shops and residents of the buildings have been shifted in phased manner before tunnelling. The Esplanade–Sealdah section will be executed by ITD-ITD Cementation JV and was scheduled to start in May 2018. 5490 meters of tunnel have been constructed between Subhash Sarovar and Sealdah. This section was constructed by ITD-ITD Cementation JV. All the cross passes between the two tunnels have also been completed. Track laying is being carried out in this section. The tunneling work was stopped due to collapse of building on 3 September 2019 over the Bowbazar area due to TBM hitting an aquifer. The work resumed in June, 2020 and successfully completed the affected area.


Timelines

* 2009: Contract for building the underground section from Subhash Sarabor to Central Station awarded to ITD-ITD Cementation JV. * 2009: Physical construction of E–W corridor starts. * 2010: Contract for building the underground section from Central to Howrah Maidan awarded to Afcons. * 2012: Realignment proposed to avoid shifting of 80 families from Bowbazar and hawkers from Brabourne Road. * 2015: Realignment approved by
Railways Rail transport (also known as train transport) is a means of transport that transfers passengers and goods on wheeled vehicles running on rails, which are incorporated in tracks. In contrast to road transport, where the vehicles run on a pre ...
and JICA in between Sealdah to Howrah station. * 2015: Subodh Mullick Square station, a key stop in the revised blueprint, done away with to avoid eviction of hawkers. * 2017-March: Afcons nicknames the tunnel boring machines as Prerna and Rachna inspired from the names of daughter of their employee. * 2017 – May 23: First TBM completes tunneling the eastbound tunnel under the Hooghly river. * 2017 – June 21: Second TBM completes tunneling the westbound tunnel under the river Hooghly. * 2017-June: Permission received from
Archaeological Survey of India The Archaeological Survey of India (ASI) is an Indian government agency that is responsible for archaeological research and the conservation and preservation of cultural historical monuments in the country. It was founded in 1861 by Alexande ...
for construction of tunnel within 100 meters of three heritage buildings. * 2017-July: Tram depot at Esplanade shifted to facilitate construction of Metro Station. * 2017-July: People from 11 buildings in Brebourne Road evacuated in phased manner when the TBM's passes below these old buildings. * 2017-August: Mini-bus stand at Mahakaran shifted to facilitate the construction of underground station. * 2017-December: Tunnelling between Mahakaran station and Esplanade station on going. * 2018 – March 23: First TBM named Prerna reaches Esplanade station completing the section from Howrah Maidan to Esplanade. This tunnel will be used by Howrah bound tunnel. * 2018 – Apr 5: Second TBM named Rachna completes boring of second tunnel between Howrah Maidan and Esplanade station. *2019 – Apr 14: Tunneling stopped due to lack of muck cars, and needed to be upgraded. Work started again after 5 days. *2019 – Jun 23: TBMs Rachna & Prerna, after being parked at Curzon Park for few months, are finally being taken out. *2019 – July 3: Both the TBMs are successfully taken out and loaded on trailers. With this, Rachna and Prerna's journey of tunneling under a river comes to an end. *2021-May: Tunnelling for East West Metro project completed.


References

{{coord missing, West Bengal Kolkata Metro Railway tunnels in West Bengal Proposed rail infrastructure in India Proposed tunnels in Asia