East Grinstead railway station
   HOME

TheInfoList



OR:

East Grinstead railway station is one of the two southern termini of the Oxted line in the south of England and serves
East Grinstead East Grinstead is a town in West Sussex, England, near the East Sussex, Surrey, and Kent borders, south of London, northeast of Brighton, and northeast of the county town of Chichester. Situated in the extreme northeast of the county, the civ ...
in West Sussex. It is from , although trains mostly run to and from . The station is managed by
Southern Southern may refer to: Businesses * China Southern Airlines, airline based in Guangzhou, China * Southern Airways, defunct US airline * Southern Air, air cargo transportation company based in Norwalk, Connecticut, US * Southern Airways Express, M ...
. The station was formerly divided into two levels: the higher-level platforms serving the Three Bridges to Tunbridge Wells Central Line, whilst the lower-level platforms received services from the Oxted line and the East Grinstead to Lewes Line. Only the lower-level platforms remain open today, the high level having closed in 1967 with the Three Bridges to Ashurst Junction line as part of the closure programme proposed by the
Beeching Report Beeching is an English surname. Either a derivative of the old English ''bece'', ''bæce'' "stream", hence "dweller by the stream" or of the old English ''bece'' "beech-tree" hence "dweller by the beech tree".''Oxford Dictionary of English Surnames' ...
.East Grinstead High Level railway station on Subterranea Britannica
/ref> A third low-level platform has been constructed at the south of the station by the Bluebell Railway. Bluebell services began running south to Sheffield Park in 2013.


Low Level

The current East Grinstead station is the fourth to have been constructed in the town. Prior to the arrival of the railway, the nearest stations were away at on the South Eastern Railway's Redhill to Tonbridge line and at on the London, Brighton & South Coast Railway's Brighton line.


Early stations


1855 station

The first station to serve East Grinstead was built by the East Grinstead Railway as the terminus of its single-track line from . It was opened on 9 July 1855 in Swan Mead off the London Road, well-situated for the town centre, with the first train out at 12:12pm. Constructed at a cost of £3,000, the station comprised a sandstone main building which survives to this day, as well as timber goods and engine sheds with slate roofs. The goods facilities were described in a specification as being equal to those at
Hailsham railway station Hailsham Railway Station was on the Cuckoo Line between Polegate and Hellingly serving the town of Hailsham. Originally built in 1849 by the London, Brighton and South Coast Railway it was a terminus station serving both passengers and livesto ...
. There were probably two platform faces and the goods yard was on the up side. The first stationmaster was a Peter Nesbitt; he remained in post until his death on 10 September 1864. The initial passenger service consisted of six trains each way daily and two on Sundays; trains started and finished at East Grinstead. The service appears to have exceeded expectations as the service increased to nine each way on weekdays, with three on Sundays. So well-patronised were the Sunday services that Reverend Woodington, the
curate A curate () is a person who is invested with the ''care'' or ''cure'' (''cura'') ''of souls'' of a parish. In this sense, "curate" means a parish priest; but in English-speaking countries the term ''curate'' is commonly used to describe clergy ...
of East Grinstead, regularly visited the station to distribute religious tracts requesting passengers to "listen to the church bells instead of the railway bells." The journey time to Three Bridges was 20 minutes and the first train departed at 6:55am for arrival in London at 9:15am after a 43-minute wait at Three Bridges for a connecting service via the Brighton main line. The fastest time to London was 1 hours achieved by the 4:00pm down train which was first-class only. As from September 1855, an additional mid-afternoon train was provided each way. This was increased to nine each way by 1862. The rail fare from East Grinstead to London was 6s first class and 3s third class. The line was operated from its outset by the
London, Brighton and South Coast Railway The London, Brighton and South Coast Railway (LB&SCR; known also as the Brighton line, the Brighton Railway or the Brighton) was a railway company in the United Kingdom from 1846 to 1922. Its territory formed a rough triangle, with London at its ...
for an annual rental of £2,000 until January 1865, when it purchased the East Grinstead Railway.


1866 station

In August 1862 parliamentary approval was obtained for the extension of the line to via , with the new line forming an end-on junction with the Three Bridges line at East Grinstead. The extension required East Grinstead station to be relocated a few yards north at a lower level in a cutting immediately to the west of the London Road at in order to allow the line to pass under the highway. It was reached by steps from the road by the bridge. During construction, the Surveyor of Highways of the Parish of East Grinstead complained to the
Board of Trade The Board of Trade is a British government body concerned with commerce and industry, currently within the Department for International Trade. Its full title is The Lords of the Committee of the Privy Council appointed for the consideration of ...
that the station approaches were "inconvenient and dangerous" and that the road entrance for carriages was situated on the narrow bridge over the line. Whilst the Board of Trade agreed that the layout was not ideal, it did not order any alterations save for the carriage access to the booking hall which it felt was cramped and should be modified "as soon as there are any complaints of horses hich brought carriages to the stationbeing frightened by the steam and smoke of the locomotives which will come through the present opening between the overbridge and the station." The station building straddled the double track with basements at platform level which contained the stationmaster's office and porter's room. A large brick goods shed replaced the previous timber structure, whilst the site of the old station became a goods yard. The new station was opened for traffic on 1 October 1866, and the old one closed the same day. The initial passenger service was poor, with only six trains each way and the withdrawal of three East Grinstead to Three Bridges services. Journey time to Tunbridge Wells was just under an hour. In 1869 annual season tickets to London were £32 first class and £24 second class, while returns were 9s 6d first, 7s 6d second and 4s 8d third.


1882 rebuilding

A third re-modelling of East Grinstead station was made necessary by the arrival in the town of two lines: the
Lewes and East Grinstead Railway The Bluebell Railway is an heritage line almost entirely in West Sussex in England, except for Sheffield Park which is in East Sussex. It is managed by the Bluebell Railway Preservation Society. It uses steam trains which operate between a ...
(L&EG) from the south on 1 August 1882, followed by the Croydon, Oxted and East Grinstead Railway (CO&EG) from the north on 10 March 1884. The L&EG would approach the Three Bridges line from the south at a right-angle and the CO&EG would make an end-on junction with it. It was not possible to enlarge the 1866 station to accommodate the new lines and arrange the new station in the form of a or as this would have meant purchasing the adjoining timber yard, which the LB&SCR was not prepared to do. It was therefore decided to build a new station around to the west which would be arranged on two levels. The main buildings were on the low level platform. The low level station was set at a right-angle to the high level and it had two platforms to serve the L&EG and CO&EG. From the L&EG's opening on 1 August 1882 until 14 October 1883, services continued to use the 1866 station as the new station was still in construction and because residents found the older station more convenient for the town centre. On 15 October 1883 both high and low level stations opened and the 1866 station was closed. The old station was later demolished in February 1908 and sold for scrap for £15. The bridge over the London Road was demolished in 1978 with the construction of the Inner Relief Road. The CO&EG opened for traffic on 10 March 1884 with a service of four trains each way between and via , plus four South Eastern services each way between London Bridge and Oxted. The new line to London was shorter than the route via Three Bridges but some passengers continued to use the old line for the fast services from Three Bridges. The main station building was built in the architectural style of other stations on the L&EG: an upper timber storey with plaster infill which was later covered with hung tiles with impressed flower patterns. The architect was
Thomas Myres Thomas Harrison Myres FRIBA (1842 – 3 December 1926) was an English railway architect who designed stations and ancillary buildings for the London, Brighton & South Coast Railway lines that were opened between 1880 and 1883, including several ...
, the inspiration behind what was termed the Queen Anne School, who prepared the design of the other stations on the L&EG, as well as those on the Chichester to Midhurst and Eridge to Polegate branches. It was a substantial structure with refreshment rooms on both levels, with that on the low level said to house a billiards room for travellers. Only passengers with valid tickets and railway staff had access to the rooms, which were licensed to sell alcohol and managed by the former owner of East Grinstead's Crown Hotel. The East Grinstead Parish Magazine complained of the distance from the new stations to the town and hoped that new roads would be built to connect it and the approaches improved. An 1885 publication about East Grinstead described the station as "very commodious and convenient" and "a pleasing object" with "embankments on the outside planted with shrubs and flowers". It is thought that an
engine shed The motive power depot (MPD) or locomotive depot, or traction maintenance depot (TMD), is the place where locomotives are usually housed, repaired and maintained when not being used. They were originally known as "running sheds", "engine shed ...
was provided upon the opening of the L&EG, given that as the first train of the day started at East Grinstead and the last train terminated there, there would have been a need to house the engine. However, the exact date of the shed's opening is unknown. Records show that
LB&SCR D1 class The LB&SCR D1 class were powerful 0-4-2 suburban passenger tank locomotives, designed by William Stroudley of the London Brighton and South Coast Railway in 1873. They were originally known as "D-tanks" but later reclassified as class D1. Member ...
No. 233 Handcross was allocated to East Grinstead shed when new in March 1883. The shed closed at the end of 1894; there were by now sheds at Three Bridges and Tunbridge Wells West. However, station plans from 1910 show that the water tank, water column and engine pit still remained. The station had north and south
signal box In signal processing, a signal is a function that conveys information about a phenomenon. Any quantity that can vary over space or time can be used as a signal to share messages between observers. The '' IEEE Transactions on Signal Processing' ...
es; the north box was occasionally used to operate a crossover to the north but operation was transferred to the south box in the 1920s which was operational until 17 July 1987. The box has since been demolished and the line is worked from the Oxted signalling panel.


1970 rebuilding

From 1955, the low level station fell into virtual disuse with most passengers using the high level station. The L&EG closed on 16 March 1958 and for a short time afterwards a faster service to Brighton via Three Bridges ran which reached the coastal town in 45 minutes after leaving East Grinstead. The last train on the L&EG ran on 16 March 1958 after which very few trains used the down platform and none departed from the up. The Oxted line timetable was revised as from 6 January 1964 so that, with a few exceptions, the regular services from Victoria terminated at the low-level platforms. After the closure of the Three Bridges-Ashurst Junction line on 2 January 1967, all London trains used the low level with the up platform used for services during busy periods, leaving the down platform to deal with both arrivals and departures. Demolition works on the 1882 building started in February 1970 and were complete by November 1971; the replacement single-storey prefabricated CLASP structure opened in 1972 immediately south of the old building. Contractors for the demolition and reconstruction were J. Longley of
Crawley Crawley () is a large town and borough in West Sussex, England. It is south of London, north of Brighton and Hove, and north-east of the county town of Chichester. Crawley covers an area of and had a population of 106,597 at the time of ...
. The smaller modern construction which reflected the station's new status as the terminus of a branch line from Oxted. Several fittings from the old station, including cast-iron pillars and brackets, valancing, gas lamps, nameboards and coloured glass, were sold to a
California California is a state in the Western United States, located along the Pacific Coast. With nearly 39.2million residents across a total area of approximately , it is the most populous U.S. state and the 3rd largest by area. It is also the m ...
n restaurant owner, Robert Freeman. The sidings in the low level goods yard remained until their removal in 1987. Following the closure of the high level station, the "Low Level" suffix was no longer used. A concrete footbridge was erected in 1970 to link the two platforms as the demolition of the high level station had removed the means of access to the up platform. The Oxted line was electrified following works between May 1986 and October 1987 and the track layout in the station was modified. The platforms were also lengthened to take eight-car trains.


2013 rebuilding

By September 2012, a new station building costing £2.1 million had been erected next to the existing structure which was scheduled for demolition in March 2013 once the new building and expanded car park became fully operational. The works, which were completed as part of the
Department for Transport The Department for Transport (DfT) is a department of His Majesty's Government responsible for the English transport network and a limited number of transport matters in Scotland, Wales and Northern Ireland that have not been devolved. The ...
’s National Station Improvement Programme, also included new platform waiting shelters, bicycle facilities, a new transport interchange on the site of the old building, platform lengthening to accommodate 12-car trains and the installation of a pre-fabricated single deck on the car park to increase capacity from 236 to 336 spaces. The existing station was considered no longer fit for purpose and in need of replacement. Although a grant had been applied for to cover the cost of installing a lift to Platform 1 for disabled access, this was refused by the Department for Transport on the basis that the cost would be disproportionate given the likely passenger numbers and the fact that only six trains a day would use the platform. The station first opened on 17 December 2012, with the official opening taking place on 8 March 2013 in the presence of the East Grinstead Town Mayor, Liz Bennett, and the Mid Sussex MP, Nicholas Soames.


Further improvements

The station gained step-free access in September 2022 when the old footbridge was replaced with a new larger footbridge and two 16-person capacity lifts.


Facilities

The station has a booking hall with a ticket office and ticket machine, a kiosk, toilets, car park, bicycle storage and a taxi rank.


Services


Present day

Off-peak, all services at East Grinstead are operated by
Southern Southern may refer to: Businesses * China Southern Airlines, airline based in Guangzhou, China * Southern Airways, defunct US airline * Southern Air, air cargo transportation company based in Norwalk, Connecticut, US * Southern Airways Express, M ...
using
EMUs Emus may refer to: * Emu The emu () (''Dromaius novaehollandiae'') is the second-tallest living bird after its ratite relative the ostrich. It is endemic to Australia where it is the largest native bird and the only extant member of the ...
. The typical off-peak service is one train per hour to via , calling at all stations as far as then and . During the peak hours and on weekends, this service is increased to two trains per hour. During the peak hours, there are also
Thameslink Thameslink is a 24-hour main-line route in the British railway system, running from , , , and via central London to Sutton, , , Rainham, , , , and . The network opened as a through service in 1988, with severe overcrowding by 1998, carrying ...
operated services to and . These services are operated using EMUs.


Bus Services

East Grinstead Station is served by bus from a bus station to the east of the station. It is served by the following bus services: * Southdown Buses Route 236 to
Lingfield Lingfield can refer to: * Lingfield, County Durham, England, a village * Lingfield, Surrey, England, a village ** Lingfield Park Racecourse ** Lingfield Cricket Club, prominent in the 18th century ** Lingfield railway station, serving the vill ...
, Edenbridge and
Oxted Oxted is a town and civil parish in the Tandridge district of Surrey, England, at the foot of the North Downs. It is south south-east of Croydon in Greater London, west of Sevenoaks in Kent, and north of East Grinstead in West Sussex. Oxt ...
. * Compass Bus Route 261 to
Forest Row Forest Row is a village and a large civil parish in the Wealden District of East Sussex, England. The village is located three miles (5 km) south-east of East Grinstead. History The village draws its name from its proximity to the Ashdow ...
and Uckfield. * Metrobus Route 270 to
Haywards Heath Haywards Heath is a town in West Sussex, England, south of London, north of Brighton, south of Gatwick Airport and northeast of the county town, Chichester. Nearby towns include Burgess Hill to the southwest, Horsham to the northwest, Cra ...
,
Burgess Hill Burgess Hill is a town and civil parish in West Sussex, England, close to the border with East Sussex, on the edge of the South Downs National Park, south of London, north of Brighton and Hove, and northeast of the county town, Chichester. It ...
and
Brighton Brighton () is a seaside resort and one of the two main areas of the City of Brighton and Hove in the county of East Sussex, England. It is located south of London. Archaeological evidence of settlement in the area dates back to the Bronze A ...
. * Metrobus Route 281 to
Dormansland Dormansland is a large village and civil parish with a low population approximately one mile south of Lingfield in Surrey, England. It was founded in the 19th century and is bordered on the east by the county of Kent and on the south by West ...
and
Lingfield Lingfield can refer to: * Lingfield, County Durham, England, a village * Lingfield, Surrey, England, a village ** Lingfield Park Racecourse ** Lingfield Cricket Club, prominent in the 18th century ** Lingfield railway station, serving the vill ...
,
Crawley Crawley () is a large town and borough in West Sussex, England. It is south of London, north of Brighton and Hove, and north-east of the county town of Chichester. Crawley covers an area of and had a population of 106,597 at the time of ...
in the other direction. * Metrobus Route 291 to
Tunbridge Wells Royal Tunbridge Wells is a town in Kent, England, southeast of central London. It lies close to the border with East Sussex on the northern edge of the High Weald, whose sandstone geology is exemplified by the rock formation High Rocks. T ...
,
Crawley Crawley () is a large town and borough in West Sussex, England. It is south of London, north of Brighton and Hove, and north-east of the county town of Chichester. Crawley covers an area of and had a population of 106,597 at the time of ...
in the other direction. * Metrobus Route 400 to
Crawley Crawley () is a large town and borough in West Sussex, England. It is south of London, north of Brighton and Hove, and north-east of the county town of Chichester. Crawley covers an area of and had a population of 106,597 at the time of ...
, Redhill and
Caterham Caterham () is a town in the Tandridge District of Surrey, England. The town is administratively divided into two: Caterham on the Hill, and Caterham Valley, which includes the main town centre in the middle of a dry valley but rises to equal ...
. * Southdown Buses Route 409 to
Lingfield Lingfield can refer to: * Lingfield, County Durham, England, a village * Lingfield, Surrey, England, a village ** Lingfield Park Racecourse ** Lingfield Cricket Club, prominent in the 18th century ** Lingfield railway station, serving the vill ...
,
Caterham Caterham () is a town in the Tandridge District of Surrey, England. The town is administratively divided into two: Caterham on the Hill, and Caterham Valley, which includes the main town centre in the middle of a dry valley but rises to equal ...
and Selsdon.


Historical

Throughout its railway history, East Grinstead has been almost exclusively served by local services to London, Brighton, Three Bridges and Tunbridge Wells. In the early days, around five or six trains a day on weekdays and two on Sundays were operated. The number of trains increased gradually as commuting developed from the 1890s, exception made for cutbacks as a result of the First World War. Starting in 1888 until the
electrification Electrification is the process of powering by electricity and, in many contexts, the introduction of such power by changing over from an earlier power source. The broad meaning of the term, such as in the history of technology, economic histo ...
of the Brighton main line in 1932, coaches for East Grinstead and were attached to the 5:05pm express from London Bridge to via Lewes and were slipped at to be routed via the Three Bridges to Tunbridge Wells line. A handful of through services between London and Brighton called at East Grinstead before running via , and Lewes. These were not fast services, taking 45 minutes to reach the coast in the 1930s. Through workings between East Grinstead, Three Bridges and London ceased upon electrification of the Brighton main line in 1932, leaving the line from Three Bridges to be worked as a separate section with push-pull trains. By 1938, eight commuter services departed East Grinstead between 6:30am and 9:30am on weekdays, an increase of three when compared with 1923. Sunday services remained infrequent at no more than four each way on each of the lines serving the town. Electrification of the Oxted line as far as Horsted Keynes was considered by the Southern Railway in 1939 but the outbreak of the
Second World War World War II or the Second World War, often abbreviated as WWII or WW2, was a world war that lasted from 1939 to 1945. It involved the vast majority of the world's countries—including all of the great powers—forming two opposi ...
put an end to any plans. Fuel shortages and wartime needs in the early 1940s resulted in services being reduced to their lowest level in the 20th century with only 45 trains scheduled to leave the station on weekdays. Wide gaps developed between services with, for example, only one train in 1942 to Lewes between 9:37am and 3:00pm, one to Three Bridges between 9:23am and 1:52pm and one to Tunbridge Wells from 9:33am and 2:25pm. Services on the Oxted line were also cut back from eight to five daily morning commuter trains and from 20 to 15 trains daily. By 1952, services had still not reached their pre-war frequency with the exception of the London commuter service. In 1955, the Oxted line timetable was recast to provide an hourly service outside the peaks, supported by an intricate system of connections between them. After the morning peak which saw eight services to and between 6:30am and 9:37am, a Victoria service ran at 25 minutes past each hour until 9:25pm, with an extra London Bridge service at 5:55pm carrying vans traffic. Sunday services were trebled to nine which ran at two-hourly intervals until 10:25pm. Similar provision was made for services from London with departures at eight minutes past the hour from Victoria, continuing from East Grinstead to Groombridge and Tunbridge Wells West. Services were also increased on the Three Bridges line to 19 on weekdays and 15 on Sundays. These additional services may have contributed to a 40% growth in East Grinstead's population between 1951 and 1961, when it rose to 15,448. One of the popular early morning commuter trains in the 1950s was the 7:08am service from Tunbridge Wells West to London Bridge via East Grinstead, while the 6:30pm London Bridge to Forest Row service, formed of seven coaches, was also well-patronised. After the publication of the Beeching Report in 1963 which saw the Three Bridges line fall into the category of routes with less than 10,000 passengers a week thereby rendering it susceptible to closure, a new timetable was introduced from 6 January 1964 which removed most of the off-peak direct London services in favour of a two-hourly service to Three Bridges.


Motive power

Small
tank engines A tank locomotive or tank engine is a steam locomotive that carries its water in one or more on-board water tanks, instead of a more traditional tender. Most tank engines also have bunkers (or fuel tanks) to hold fuel; in a tender-tank locomot ...
were used to haul services until the 1870s when Stroudley D1s supplemented by B1 "Gladstones" were used after having been displaced from main-line duties. Heavier and more powerful engines were introduced after the First World War, including Billinton E4 and E5 classes, along with his D3 and B4 classes.
Marsh A marsh is a wetland that is dominated by herbaceous rather than woody plant species.Keddy, P.A. 2010. Wetland Ecology: Principles and Conservation (2nd edition). Cambridge University Press, Cambridge, UK. 497 p Marshes can often be found ...
's I3 class was mainly used on Tunbridge Wells-East Grinstead-London services, while his H1 and H2 "Atlantics" were seen on London-East Grinstead-Lewes services. The Southern Railway's neglect of its non-electrified secondary lines in the period leading up to the Second World War resulted in weight restrictions being introduced on the Tunbridge Wells and Lewes lines from which I3s were banned in favour of lighter I1X class locomotives to Tunbridge Wells and SECR B1s, F1s and D1s on the Lewes line. The restrictions were removed after the war when I3s returned with SR N and U1 classes, together with certain K classes. Larger express passenger engines began to appear including, in the mid-1950s, Schools class No. 30917 ''Ardingly'' for beginning and end of school term specials. In the early 1950s, LMS Fairburn 2-6-4Ts were trialled on London commuter services and
LMS Ivatt Class 2 2-6-2T The London, Midland and Scottish Railway (LMS) Ivatt Class 2 2-6-2T is a class of light 'mixed-traffic' steam locomotive introduced in 1946. Background The LMS had various elderly tank engines and the operating department required a new smal ...
s for lighter Oxted line trains. In the last days of steam, BR 2-6-4Ts took up duties alongside the Fairburns until these were transferred to the London Midland Region.
Dieselisation Dieselisation (US: dieselization) is the process of equipping vehicles with a diesel engine or diesel engines. It can involve replacing an internal combustion engine powered by petrol (gasoline) fuel with an engine powered by diesel fuel, as o ...
came in the early 1960s when Class 207 units were introduced on Oxted line services where they remained in operation for the next 43 years. On 18 June 1962, the first public diesel services started on the 7:41am East Grinstead to London Bridge service, with the return at 5:37pm; the formation was a 3-car set combined with a Hastings-type 6-car set. Steam working continued on the London services for a further twelve months, whilst the Three Bridges line was largely operated with M7 push-pull steam services. Push-pull working on the line ceased on 4 January 1964 just prior to the entry into force of a new timetable for the Oxted line from 6 January; the last push-pull service was hauled by H class No. 31263. Electrification reached East Grinstead in 1987 with the first services commencing on Monday 5 October.


Bluebell Railway


Site purchase

The heritage Bluebell Railway reopened part of the L&EG from to just short of on 7 August 1960. Horsted Keynes was reached the next year and the site of was purchased in November 1975. A planning application for a
Light Railway Order The Light Railways Act 1896 (59 & 60 Vict. c.48) was an Act of the Parliament of the United Kingdom of Great Britain and Ireland. History Before the Act each new railway line built in the country required a specific Act of Parliament to be ob ...
to extend services north to East Grinstead led to a public enquiry in June 1983 and the grant of permission by the
Secretary of State for the Environment The Secretary of State for the Environment was a UK cabinet position, responsible for the Department of the Environment (DoE). This was created by Edward Heath as a combination of the Ministry of Housing and Local Government, the Ministry of T ...
on 2 April 1985, subject to conditions including the removal of waste from Imberhorne cutting. The first section of track of the northern extension was laid on 13 March 1988 by Paul Channon MP,
Secretary of State for Transport The Secretary of State for Transport, also referred to as the transport secretary, is a secretary of state in the Government of the United Kingdom, with overall responsibility for the policies of the Department for Transport. The incumbent is ...
. On 17 April 1992, the line was further extended through Sharpthorne Tunnel up to New Coombe. On 23 April 1994, the first public service to call at in 39 years ran following the completion of New Coombe Bridge. In 1991,
British Rail British Railways (BR), which from 1965 traded as British Rail, was a state-owned company that operated most of the overground rail transport in Great Britain from 1948 to 1997. It was formed from the nationalisation of the Big Four (British ra ...
gave the Bluebell Railway an undertaking to sell it Hill Place Viaduct as well as land for a new station at East Grinstead; each would be sold for the sum of £1.00. On 8 September 1992, the viaduct was formally handed over to the Bluebell Extension Company. The proposed station site, which was located just south of the existing station, had been used for carriage storage sidings since closure of the line to Sheffield Park and Lewes. Although not ideal, the site is large enough to accommodate an eight-car platform, basic station facilities and the necessary track and infrastructure. Despite the understanding reached with British Rail, several attempts were made by neighbouring commercial interests to take over the site following its
privatisation Privatization (also privatisation in British English) can mean several different things, most commonly referring to moving something from the public sector into the private sector. It is also sometimes used as a synonym for deregulation when ...
and the appearance of
Railtrack Railtrack was a group of companies that owned the track, signalling, tunnels, bridges, level crossings and all but a handful of the stations of the British railway system from 1994 until 2002. It was created as part of the privatisation of ...
. In April 1993, it was reported that the former goods yard had been sold by British Rail Property Board for £2.3m and that
J Sainsbury plc J Sainsbury plc, trading as Sainsbury's, is the second largest chain of supermarkets in the United Kingdom, with a 14.6% share of UK supermarket sales. Founded in 1869 by John James Sainsbury with a shop in Drury Lane, London, the company wa ...
would be constructing a supermarket on part of the land, with the rest to be used as a replacement car park in front of the station. In October 1995, J Sainsbury plc made a planning application for a petrol station on the season ticket holders' car park in front of the station, with the parking to be relocated to the intended station site. A further application was presented in March 1996 showing Sainsbury's intention to use part of the site itself. The applications were refused by Mid Sussex District Council on the basis that they affected the proposed Bluebell station. The Bluebell had turned down a proposal by consultants engaged by Railtrack for a single-platform terminus relocated nearer Imberhorne Viaduct. In September 2002, Railtrack applied to the
Office of the Rail Regulator The Rail Regulator was a statutory office, created with effect from 1 December 1993 by section 1 of the Railways Act 1993, for the independent economic regulation of the British railway industry. The office was abolished from 4 July 2004, using ...
to sell the land earmarked for the Bluebell Railway to
Sainsbury's J Sainsbury plc, trading as Sainsbury's, is the second largest chain of supermarkets in the United Kingdom, with a 14.6% share of UK supermarket sales. Founded in 1869 by John James Sainsbury with a shop in Drury Lane, London, the company ...
for an extension of the adjoining supermarket car park. In its application, Railtrack acknowledged that an undertaking had been given to sell the land to the Bluebell Railway, but indicated that in its opinion the extension of the line to East Grinstead would not materialise. Objections to the proposal were made by the
Strategic Rail Authority The Strategic Rail Authority (SRA) was a non-departmental public body in the United Kingdom set up under the Transport Act 2000 to provide strategic direction for the railway industry. Its motto was 'Britain's railway, properly delivered'. I ...
,
Southern Southern may refer to: Businesses * China Southern Airlines, airline based in Guangzhou, China * Southern Airways, defunct US airline * Southern Air, air cargo transportation company based in Norwalk, Connecticut, US * Southern Airways Express, M ...
and the various local authorities; the Bluebell Railway also objected and stated that it would make the East Grinstead extension unviable. Consent to the sale was refused by the Regulator. In 2006,
Network Rail Network Rail Limited is the owner (via its subsidiary Network Rail Infrastructure Limited, which was known as Railtrack plc before 2002) and infrastructure manager of most of the railway network in Great Britain. Network Rail is an "arm's len ...
sold the station site to the Bluebell Railway.


Construction

Work began in May 2008 on clearing the site for the construction of a new platform. This was completed within two days and work started in November to prepare the site for tracklaying. On the night of 13 January 2009, Network Rail connected the track to the main line. A network of ducts was laid to enable the station to be signalled remotely from the Kingscote signalbox. Signalling will be controlled from Kingscote, although the Society will relocate an historic LB&SCR signalbox from . To mark an open day on 17 January 2009, former South West Trains
4Vep The British Rail Class 423 ( 4 VEP), electric multiple unit passenger trains were mostly built by British Rail (BR) at York Works from 1967 to 1974, although the MBSOs and TSOs of the first 20, 7701-7720, were built at Derby Works. They have ...
unit no. 3417 (named "Gordon Pettit" after the last Southern Region manager) was moved to the station site. Presented to the Bluebell by South West Trains which had restored the unit to its original blue livery at Wimbledon depot, it became the first train to use the new connection between Network Rail and the Bluebell Railway at East Grinstead. It was shunted over the connection by Class 73 73205. The unit only remained on site for a few days as on 22 January it was moved to secure undercover storage at
Eastleigh Works Eastleigh Works is a locomotive, carriage and wagon building and repair facility in the town of Eastleigh, in the county of Hampshire in England. History LSWR The London and South Western Railway (LSWR) opened a carriage and wagon works at E ...
. By July 2009, service pipes and a permanent messing facility had been installed on the site. Construction on the back wall of the platform began on 10 August 2009. All utilities and cabling had to be routed under or through the platform due to the long and thin shape of the plot. Tracklaying in the station area was complete by June 2010, following which the first train over the section carrying waste from Imberhorne cutting ran on 6 July.
GB Railfreight GB Railfreight (GBRf) is a rail freight company in the United Kingdom. As of 2022, it is owned by the global investment company Infracapital. GB Railfreight was established in April 1999 as the rail freight operating subsidiary of the train o ...
(GBRf), which had been contracted to run occasional trains, ran the first of its services carrying 1,000 tons of excavated rubbish from Imberhorne Cutting to disposal sites, initially at Calvert. The total to be removed was some 90,981 tons, achieved by December 2011. The waste had been deposited in the and quarter-mile-long (400 m) Hill Place Cutting which was purchased and designated as a landfill tip by East Grinstead Town Council in the late 1960s and used for around 25 years. The station's layout is basic to allow trains arriving from the south to arrive directly in the platform so that the locomotive can detach, take water and return to the south end of the train via a run-round loop. Train movements in the station area are subject to a speed restriction in order to reduce noise and smoke.


Opening

The station first opened to the public on 4 September 2010 as part of an open day weekend. Class 73 73208 ''Kirsten'' broke through a ceremonial banner at the station on the day. A shuttle passenger service operated during the weekend for about to the north end of the infilled Hill Place Cutting. The first direct through service as far as the tip face ran on 6 November 2010, with a Class 201 No. 1001 preserved
DEMU A diesel multiple unit or DMU is a multiple-unit train powered by on-board diesel engines. A DMU requires no separate locomotive, as the engines are incorporated into one or more of the carriages. Diesel-powered single-unit railcars are also ...
running a "Blue Belle" charter from Hastings through to Imberhorne North. It had been intended that the station should represent an authentic Southern Railway station from the 1930s with an
art deco Art Deco, short for the French ''Arts Décoratifs'', and sometimes just called Deco, is a style of visual arts, architecture, and product design, that first appeared in France in the 1910s (just before World War I), and flourished in the Unit ...
-style main building, with a single platform capable of accommodating eight coach trains complete with a run-round loop and a water tower. This plan was frustrated by Network Rail's need to access the land earmarked for the proposed building and it was therefore decided to use replicated LB&SCR lampposts, benches and signalling with Southern-style enamel signs in a Southern Region colour scheme to reflect how the 1882 East Grinstead station would have looked prior to demolition. The Bluebell Railway commenced services to East Grinstead on 23 March 2013. The first service was the 9:45am "The Pioneer" to Sheffield Park hauled by LB&SCR A1X class 55 Stepney. The first through service from London Victoria since September 1963 and the first service through to Sheffield Park since 1958, a 12-coach railtour worked by GBRf Class 66/7 66739, ran on 28 March 2013. Two GBRf Class 73s, 73207 and 73119, provided heating and also operated services between East Grinstead and Sheffield Park using the Bluebell's own rolling stock. In the year following the opening of the extension, the Bluebell's annual passenger figures rose from 60,000 to 250,000 and annual revenue increased by 25% to £4 million.


High Level


Opening

The high level station was still in construction when it opened on 1 August 1882, the first day of service on the L&EG, and was initially only used by some Three Bridges to Tunbridge Wells services scheduled to connect with those on the L&EG. The new station was still not complete by March 1883 and a working timetable instruction advised locomotive drivers and guards to take care to ensure that their trains pulled up at the completed part of the high level platform. Until 14 October 1883, these trains called at the 1866 and the unfinished high level station where a temporary ticket box was opened. On 15 October 1883 the new high and low level stations were officially opened and the 1866 station was closed. The high level station had two
island platform An island platform (also center platform, centre platform) is a station layout arrangement where a single platform is positioned between two tracks within a railway station, tram stop or transitway interchange. Island platforms are popular o ...
s, curiously numbered 3 and 4 even though each platform had two faces, serving four tracks on the Three Bridges line, while below it a low level station set at a right-angle with two platforms to serve the L&EG and CO&EG. The southern island platform was situated between the two roads of the
crossing loop A passing loop (UK usage) or passing siding (North America) (also called a crossing loop, crossing place, refuge loop or, colloquially, a hole) is a place on a single line railway or tramway, often located at or near a station, where trains or ...
of the Three Bridges line and the northern island platform was between the up and down lines of the St Margaret's Loop spur. Trains from Tunbridge Wells bound for Three Bridges could only be routed via the south face of platform 3, whilst those intended for the Oxted line ran from the south face of platform 4. In the other direction, trains from Three Bridges arrived at the north face of platform 3, whilst those from Oxted were routed via the north face of platform 4. To the east of the station, all running roads converged on the single track to Groombridge. The timber accommodation provided for the high level station was not as comfortable as that in the lower level station. It was, however, equipped with a refreshment room lit by a
lantern roof A roof lantern is a daylighting architectural element. Architectural lanterns are part of a larger roof and provide natural light into the space or room below. In contemporary use it is an architectural skylight structure. A lantern roof wil ...
on each platform, as well as two signal cabins on either side—''East Grinstead West'' and ''East Grinstead East''. The platforms were timber-planked where they passed above the low level tracks. The platforms were connected by western and eastern staircases; the western staircase fell out of use after 1891 when an overbridge linking the low level platforms was built. A private siding also led into the adjoining timber yard. The first train to call at the station was a 05:50 service from Three Bridges to via East Grinstead. In 1922, a
water tower A water tower is an elevated structure supporting a water tank constructed at a height sufficient to pressurize a distribution system for potable water, and to provide emergency storage for fire protection. Water towers often operate in conju ...
from was installed at the eastern end of the station. Following the opening of the CO&EG on 10 March 1884, a sharply curving spur line (later known as "St. Margaret's Loop") which entered the high level station from the CO&EG was also opened. This was a double-track connection from the west-end of the station on a tight curve which joined the CO&EG to the north of the town at St Margaret's Junction at , named after a local
Anglican Anglicanism is a Western Christian tradition that has developed from the practices, liturgy, and identity of the Church of England following the English Reformation, in the context of the Protestant Reformation in Europe. It is one of t ...
convent A convent is a community of monks, nuns, religious brothers or, sisters or priests. Alternatively, ''convent'' means the building used by the community. The word is particularly used in the Catholic Church, Lutheran churches, and the Angl ...
. To ease the sharpness of the curve, the Three Bridges line was deviated on its western approach to the high level station. The deviation was completed in May 1882 and comprised two underbridges with brick abutments and wrought iron girders which would cross the new line and the new road which had to be built (Station Road). No regular service was booked to use the loop until October 1885. A single-track spur was also laid from the south of the low level station to the east of the high level to be used for shunting trains between the stations and turning engines; no scheduled services ever used it. As there was a shorter route from to Groombridge via , there would have been no need for the spur. It had been proposed to construct a loop to the west of the high level station between St Margaret's Loop and the Three Bridges line to allow through running between the Oxted and Three Bridges lines but this was never realised.


Closure

The closure of the Three Bridges-Ashurst Junction line after the last train on Sunday 1 January 1967 spelt the end for the high level station and St Margaret's Loop which would receive no further traffic. The goods yard had been virtually closed for some time except for coal and all freight facilities were formally withdrawn as from 10 April. Although very nearly redundant, the high level goods sidings could still be accessed via the low to high level connecting spur; both spurs serving the high level station were however closed in 1967. The last train to use the station was in February 1968, a tracklifting train hauled by a Class 33 diesel locomotive. As the footbridge at the low-level platforms had been demolished in Summer 1965, passengers used the high level station as a short-cut between platforms, thereby avoiding the need to go around a local housing estate. The high level's demolition in 1970 led to protests from passengers at the loss of the short-cut, as a result of which British Rail erected a footbridge which today marks the site of the high level station. The goods yard area was taken over by the
A22 road A, or a, is the first letter and the first vowel of the Latin alphabet, used in the modern English alphabet, the alphabets of other western European languages and others worldwide. Its name in English is ''a'' (pronounced ), plural ''aes'' ...
which runs parallel with Railway Approach. The East Grinstead Society had attempted to save the brick goods shed for reuse as a drama and arts workshop but were unable to secure the necessary funds and so it was demolished in 1976. The site of the high level station is now a car park whose perimeter is marked out with old rails. Beyond the car park to the east, the former railway embankment has been removed to make way for the Inner Relief Road (A22 Beeching Way) which was opened in 1978. In July 1979, much of the trackbed from Three Bridges to East Grinstead became a footpath and cycleway known as the Worth Way.


Future

The reopening of the line from Tunbridge Wells to Three Bridges has been suggested as a means of relieving the A264 road. However, a number of obstacles would appear to stand in the way of such action, most notably: # An industrial site currently occupies the former location of Forest Row railway station as well as a small recycling centre to the west. # The formation has been built across in several places notably in East Grinstead where about of the trackbed from Station Road to the Lewes Road tunnel has been taken over for a relief road, the A22 Beeching Way. As there is no feasible alternative route into the station, this road would need to be reconverted back to rail. Any such action would in all likelihood result in a reduction in capacity on an already highly congested local road network. # The site of has disappeared under a small parade of shops as well as housing which block of the formation. # In 1974,
East Sussex County Council East Sussex County Council is the local authority for the non-metropolitan county of East Sussex. East Sussex is divided into five local government districts. Three are larger, rural, districts (from west to east: Lewes; Wealden; and Rother ...
created the
Forest Way The Forest Way is a linear Country park providing walking, cycling, horse riding and the quiet enjoyment of the countryside. It runs for around 16 km from East Grinstead to Groombridge. The Forest Way lies within the High Weald Area of Ou ...
linear
Country Park A country park is a natural area designated for people to visit and enjoy recreation in a countryside environment. United Kingdom History In the United Kingdom, the term ''country park'' has a special meaning. There are around 250 recognised cou ...
using the trackbed of the line from East Grinstead (just to the east of Beeching Way) as far as Groombridge. Similarly, in 1979 West Sussex County Council created the Worth Way linear Country Park using the disused Three Bridges to East Grinstead line. Both have been incorporated into
Sustrans Sustrans is a United Kingdom-based walking, wheeling and cycling charity, and the custodian of the National Cycle Network. Its flagship project is the National Cycle Network, which has created of signed cycle routes throughout the United K ...
' National Cycle Route 1.


In popular culture

In the book ''
Winnie-the-Pooh Meets the Queen ''Winnie-the-Pooh Meets the Queen'' (e-book edition published as ''Winnie-the-Pooh and the Royal Birthday'') is a 2016 children's book written to celebrate the 90th birthdays of both the fictional character Winnie-the-Pooh and Queen Elizabeth ...
'', Christopher Robin, Pooh, Piglet and Eeyore travel to London on a train from East Grinstead, which is the nearest railway station to
Ashdown Forest Ashdown Forest is an ancient area of open heathland occupying the highest sandy ridge-top of the High Weald Area of Outstanding Natural Beauty. It is situated some south of London in the county of East Sussex, England. Rising to an elevation ...
, to deliver a present for the
Queen Queen or QUEEN may refer to: Monarchy * Queen regnant, a female monarch of a Kingdom ** List of queens regnant * Queen consort, the wife of a reigning king * Queen dowager, the widow of a king * Queen mother, a queen dowager who is the mother ...
's 90th birthday. Although the station is not named in the text, the station sign is shown in an illustration.


References


Notes


Sources

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *


Further reading

* *


External links

{{TSGN and SE Stations, Oxted=y, FCC None=y, SE None=y East Grinstead Railway stations in West Sussex East Grinstead High Level railway station Former London, Brighton and South Coast Railway stations Railway stations in Great Britain opened in 1882 Railway stations served by Govia Thameslink Railway Heritage railway stations in West Sussex Railway stations built for UK heritage railways Bluebell Railway Thomas Myres buildings