The Clinch River Nuclear Site (CRNS) is a project site owned by the
Tennessee Valley Authority The Tennessee Valley Authority (TVA) is a federally owned electric utility corporation in the United States. TVA's service area covers all of Tennessee, portions of Alabama, Mississippi, and Kentucky, and small areas of Georgia, North Carolin ...
(TVA). It was once proposed as the Clinch River Breeder Reactor Project of the U.S. Atomic Energy Commission (and a successor agency, the
U.S. Energy Research and Development Administration The United States Energy Research and Development Administration (ERDA) was a United States government organization formed from the split of the Atomic Energy Commission (AEC) in 1975. It assumed the functions of the AEC not assumed by the Nuclea ...
(ERDA), and subsequently the U.S. Department of Energy) and the U.S. electric power industry to design and construct a
sodium Sodium is a chemical element with the symbol Na (from Latin ''natrium'') and atomic number 11. It is a soft, silvery-white, highly reactive metal. Sodium is an alkali metal, being in group 1 of the periodic table. Its only stable ...
-cooled fast-
neutron The neutron is a subatomic particle, symbol or , which has a neutral (not positive or negative) charge, and a mass slightly greater than that of a proton. Protons and neutrons constitute the nuclei of atoms. Since protons and neutrons beh ...
nuclear reactor A nuclear reactor is a device used to initiate and control a fission nuclear chain reaction or nuclear fusion reactions. Nuclear reactors are used at nuclear power plants for electricity generation and in nuclear marine propulsion. Heat fr ...
. The project was opposed by President Carter. Peter A. Bradford
Delivering the nuclear promise
''
Bulletin of the Atomic Scientists The ''Bulletin of the Atomic Scientists'' is a nonprofit organization concerning science and global security issues resulting from accelerating technological advances that have negative consequences for humanity. The ''Bulletin'' publishes conte ...
'', June 2016.
The project was intended as a prototype and demonstration for building a class of such reactors, called Liquid Metal Fast Breeder Reactors (LMFBR), in the
United States The United States of America (U.S.A. or USA), commonly known as the United States (U.S. or US) or America, is a country primarily located in North America. It consists of 50 states, a federal district, five major unincorporated territori ...
. The project was first authorized in 1970. After initial appropriations were provided in 1972, work continued until the
U.S. Congress The United States Congress is the legislature of the federal government of the United States. It is bicameral, composed of a lower body, the House of Representatives, and an upper body, the Senate. It meets in the U.S. Capitol in Washin ...
terminated funding on October 26, 1983. The project was seen to be "unnecessary and wasteful". In February 2022, the site was announced as the first location of a
small modular reactor Small modular reactors (SMRs) are a proposed class of nuclear fission reactors, smaller than conventional nuclear reactors, which can be built in one location (such as a factory), then shipped, commissioned, and operated at a separate site. The ...
as part of the TVA's New Nuclear Program, which was approved the same year.


Location

The site for the Clinch River Breeder Reactor was a land parcel owned by the TVA adjacent to the
Clinch River The Clinch River is a river that flows southwest for more than through the Great Appalachian Valley in the U.S. states of Virginia and Tennessee, gathering various tributaries, including the Powell River, before joining the Tennessee River in Ki ...
in
Roane County, Tennessee Roane County is a county of the U.S. state of Tennessee. As of the 2020 census, the population was 53,404. Its county seat is Kingston. Roane County is included in the Knoxville, TN Metropolitan Statistical Area. History Roane County was fo ...
, inside the city limits of Oak Ridge, Tennessee, but remote from the city's residential population.


Reactor design

The reactor would have been rated at 1000 megawatts (MW) of thermal output, with a net plant output of 350 MW (electrical) and a gross output of 380 MW.Nuclear Power Reactor Details - Clinch River
International Atomic Energy Agency
L. E. Strawbridge (Westinghouse Advanced Reactors Division)
Safety Related Criteria and Design Features in the Clinch River breeder Reactor Plant
presented at
American Nuclear Society The American Nuclear Society (ANS) is an international, not-for-profit organization of scientists, engineers, and industry professionals that promote the field of nuclear engineering and related disciplines. ANS is composed of three communities: ...
Fast Reactor Safety Meeting, April 2–4, 1974
The reactor core was designed to contain 198 hexagonal fuel assemblies, arranged to form a cylindrical geometry with two enrichment zones. The inner core would have contained 18%
plutonium Plutonium is a radioactive chemical element with the symbol Pu and atomic number 94. It is an actinide metal of silvery-gray appearance that tarnishes when exposed to air, and forms a dull coating when oxidized. The element normally exhibi ...
and would have consisted of 108 assemblies. It would have been surrounded by the outer zone, which would have consisted of 90 assemblies of 24% plutonium to promote more uniform heat generation. The active fuel would have been surrounded by a radial blanket consisting of 150 assemblies of similar, but not identical, design containing depleted
uranium Uranium is a chemical element with the symbol U and atomic number 92. It is a silvery-grey metal in the actinide series of the periodic table. A uranium atom has 92 protons and 92 electrons, of which 6 are valence electrons. Uranium is weak ...
oxide; outside of the blanket would have been 324 radial shield assemblies of the same overall hexagonal geometry. The primary (green) and secondary (gold) control rod systems would have provided overall plant shutdown reliability. Each system would have contained boron carbide. The secondary rods were to be used only for
SCRAM A scram or SCRAM is an emergency shutdown of a nuclear reactor effected by immediately terminating the fission reaction. It is also the name that is given to the manually operated kill switch that initiates the shutdown. In commercial reactor ...
, and would have been required to be fully withdrawn before startup could be initiated.


Project economics and politics

The Clinch River Breeder Reactor was initially conceived as a major step toward developing liquid-metal fast breeder reactor technology as a commercially viable
electric power generation Electricity generation is the process of generating electric power from sources of primary energy. For utilities in the electric power industry, it is the stage prior to its delivery (transmission, distribution, etc.) to end users or its storag ...
system in the United States. In 1971
U.S. President The president of the United States (POTUS) is the head of state and head of government of the United States of America. The president directs the executive branch of the federal government and is the commander-in-chief of the United States ...
Richard Nixon Richard Milhous Nixon (January 9, 1913April 22, 1994) was the 37th president of the United States, serving from 1969 to 1974. A member of the Republican Party, he previously served as a representative and senator from California and was ...
established this technology as the nation’s highest priority research and development effort. However, the Clinch River project was controversial from the start, and economic and political considerations eventually led to its demise.


Project costs

One issue was continuing escalation in the cost of the project. In 1971 the Atomic Energy Commission estimated that the Clinch River project would cost about $400 million. Private industry promised to contribute the majority of the project cost ($257 million). By the following year, however, projected costs had jumped to nearly $700 million. By 1981 $1 billion of public money had been spent on the project, and the estimated cost to completion had grown to $3.0-$3.2 billion, with another billion dollars needed for an associated spent
nuclear fuel reprocessing Nuclear reprocessing is the chemical separation of fission products and actinides from spent nuclear fuel. Originally, reprocessing was used solely to extract plutonium for producing nuclear weapons. With commercialization of nuclear power, the ...
facility.Jay Boudreau
The American Breeder Reactor Program Gets a Second Chance
''
Los Alamos Science ''Los Alamos Science'' was the Los Alamos National Laboratory's flagship publication in the years 1980 to 2005. Its main purpose was to present the laboratory's research and its significance to national security to the scientific community, and US ...
'', vol 2, no 2, summer/fall 1981.
Kurt Andersen, Gary Lee, and Peter Staler
Clinch River: a Breeder for Baker
''Time'', August 3, 1981
A Congressional committee investigation released in 1981 found evidence of contracting abuse, including bribery and fraud, that added to project costs. Before it was finally canceled in 1983, the
General Accounting Office The U.S. Government Accountability Office (GAO) is a legislative branch government agency that provides auditing, evaluative, and investigative services for the United States Congress. It is the supreme audit institution of the federal gover ...
of the Congress estimated the total project cost at $8 billion.


Technology costs

Another issue was the high cost of building and operating breeder reactors to produce electricity. In 1981, it was estimated that construction costs for a fast breeder reactor would be twice the cost of building a conventional light-water nuclear reactor of similar capacity. That same year it was estimated that the market price of mined, processed uranium, then $25 per pound, would have to increase to nearly $165 per pound in 1981 dollars before the breeder would become financially competitive with the conventional light-water nuclear reactor. United States electric utility companies were reluctant to invest in such an expensive technology.


Nuclear weapons proliferation

Concerns about potential nuclear weapons proliferation were another serious issue for the commercial breeder reactor program, because this technology produces
plutonium Plutonium is a radioactive chemical element with the symbol Pu and atomic number 94. It is an actinide metal of silvery-gray appearance that tarnishes when exposed to air, and forms a dull coating when oxidized. The element normally exhibi ...
that potentially could be used to make nuclear weapons. Because of international concern about proliferation, in April 1977 President
Jimmy Carter James Earl Carter Jr. (born October 1, 1924) is an American politician who served as the 39th president of the United States from 1977 to 1981. A member of the Democratic Party, he previously served as the 76th governor of Georgia from 1 ...
called for an indefinite deferral of construction of commercial breeder reactors. President Carter was a consistent opponent of the Clinch River project. In November 1977, in a statement explaining his
veto A veto is a legal power to unilaterally stop an official action. In the most typical case, a president or monarch vetoes a bill to stop it from becoming law. In many countries, veto powers are established in the country's constitution. Veto ...
of a bill to authorize funding for continuation of the project, Carter said it would be "large and unnecessarily expensive" and "when completed, would be technically obsolete and economically unsound." Furthermore, he said the project would have little value for determining the commercial viability of breeder technology in the United States.Veto of Department of Energy Authorization Bill Message to the Senate Returning S. 1811 Without Approval, November 5th, 1977
/ref> Congress persisted in keeping the Clinch River project alive over the President's objections, and Carter repeatedly chastised Congress for its actions. In a speech in 1979, after the
House Science and Technology Committee The Committee on Science, Space, and Technology is a standing committee, committee of the United States House of Representatives. It has jurisdiction over non-defense federal scientific research and development. More specifically, the committee h ...
had voted to proceed with the project over his opposition, he said "The Clinch River breeder reactor is a technological dinosaur. It's a waste of more than $1-1/2 billion of taxpayers' money. It's an assault on our attempts to control the spread of dangerous nuclear materials. It marches our nuclear policy in exactly the wrong direction. ... This is no time to change America into a plutonium society." Instead of investing public resources in the breeder demonstration project, he urged attention to improving the safety of existing nuclear technology.Veto of Department of Energy Authorization Bill Message to the Senate Returning S. 1811 Without Approval, November 5th, 1977Jimmy Carter, Public Works Appropriations Bill Statement on Signing H.R. 7553 Into Law, August 8th, 1977
an
Jimmy Carter - The President's News Conference of May 4th, 1979
/ref>


Cancellation of the project

The Clinch River Breeder Reactor Project was revived after President Ronald Reagan took office in 1981. In spite of growing opposition from Congress and analysts inside and outside the government, ground was broken and construction began. The project was finally terminated when, on October 26, 1983, the
U.S. Senate The United States Senate is the upper chamber of the United States Congress, with the House of Representatives being the lower chamber. Together they compose the national bicameral legislature of the United States. The composition and pow ...
voted 56-40 to deny any further financing for the project.Nader.org
That Clinches It: The Breeder Reactor is Dead
, November 2, 1983


B&W mPower

In February 2013, plans were announced to build a B&W mPower
small modular reactor Small modular reactors (SMRs) are a proposed class of nuclear fission reactors, smaller than conventional nuclear reactors, which can be built in one location (such as a factory), then shipped, commissioned, and operated at a separate site. The ...
at the site.