The Chalillo Dam is a gravity dam on the Macal River about south of San Ignacio in Cayo District, Belize. Chalillo Dam's maximum capacity is 7.0MW. The dam was constructed by
Sinohydro Sinohydro ( Chinese: 中国水电; long form: 中国水利水电建设集团公司) is a Chinese state-owned hydropower engineering and construction company. In the 2012 Engineering News-Record Top 225 Global Contractors, a ranking by annual rev ...
of Beijing, China between 2002 and 2005 with the primary purpose of hydroelectric power production. It is owned and operated by
Belize Electricity Limited Belize Electricity Limited (BEL) is the primary distributor of electricity in Belize, Central America. Aggregate energy sold was approximately 588.4 gigawatt hours (GWh) in 2019, up from 554.4 GWh in 2018. The Company served a customer base of ov ...
(BEL). At the time of the dam's construction, BEL was owned by the Canadian corporation
Fortis Inc. Fortis Inc. is a St. John's, Newfoundland and Labrador-based international diversified electric utility holding company. It operates in Canada, the United States, Central America, and the Caribbean. In 2015, it earned . Fortis was formed in 198 ...
, but is now owned by the government of Belize. The project budget was approximately US 30 million. Its construction generated controversy over its effect on the surrounding
rain forest Rainforests are characterized by a closed and continuous tree canopy, moisture-dependent vegetation, the presence of epiphytes and lianas and the absence of wildfire. Rainforest can be classified as tropical rainforest or temperate rainforest ...
. Two smaller dams, the Mollejon and Vaca, are downstream from the Chalillo Dam.


Location

Chalillo Hydroelectric Dam is situated in the westernmost part of the country where the Macal River converges with the Raspaculo River. It is located in the Maya Mountains and shares adjacency with the Chiquibul National Park and the Pine Ridge Forest Reserve. Positioning Chalillo Hydroelectric Dam approximately 16 kilometers from the Guatemalan border.


Purpose

The primary purpose of Chalillo Hydroelectric Dam is to impound the water in the 46m storage dam during the rainy season and release during shortage.Belize Produces Electricity with Chalillo Dam. (2006). The Island Newspaper. Retrieved 16 February 2017, from At the base of the dam, through a low level valve, water is released during the dry period. Basically, water is carried from the dam downstream to the powerhouse which protects the generating
Kaplan turbine The Kaplan turbine is a propeller-type water turbine which has adjustable blades. It was developed in 1913 by Austrian professor Viktor Kaplan, who combined automatically adjusted propeller blades with automatically adjusted wicket gates to ach ...
s. Subsequent to powering the electric turbines, the water drifts back into the Macal River through the tailrace channel and back to its natural route towards its sister facility, Mollejon hydroelectric power plant.


Production

All necessary equipment and controls required for the production of power is contained in the Power House. The circular steel pen stock which is about 80 meters in length and 2.4 meters in diameter facilitates the transport of water from the dam to the power plant. The Kaplan turbine generators equipped with adjustable blades, modern electronic and hydraulic systems help in the production of power. Subsequently, the power is delivered through the 115Kv line which is interconnected to Mollejon switchyard. Power is then distributed to BEL's grid via Mollejon.


Controversies

The Chalillo Dam has been controversial since its inception and has been the subject of multiple lawsuits. Most of the controversy surrounding the dam concerns its impact on the environment, specifically on the ecosystems of the Macal River and the Chiquibul Forest. As mentioned in a report commissioned as part of the Environmental Impact Assessment for the dam, the area flooded by the dam's reservoir "contains a rare and discrete floral floodplain habitat which acts as both a conduit and critical habitat for resident and non-resident fauna and avifauna." Notably, the area was a nesting site for the endangered northern subspecies of the
Scarlet macaw The scarlet macaw (''Ara macao'') is a large red, yellow, and blue Central and South American parrot, a member of a large group of Neotropical parrots called macaws. It is native to humid evergreen forests of the Neotropics. Its range extends from ...
. There have also been concerns about the safety of the dam, as it was built only 550 meters from a
fault line In geology, a fault is a planar fracture or discontinuity in a volume of rock across which there has been significant displacement as a result of rock-mass movements. Large faults within Earth's crust result from the action of plate tectonic ...
. If the dam were to break, it would imperil the downsteam town of San Ignacio. Finally, objections have been raised about the economics of the dam. Because the dam would only generate a small amount of electricity (about 6 megawatts), it would not significantly decrease Belize's need to import electricity from other countries, nor would it lower electricity costs for consumers. Belizean environmental groups sued to stop the construction of the dam. In their lawsuit, they argued that the Environmental Impact Assessment for the dam was flawed and inadequate. The case was eventually appealed to the
Judicial Committee of the Privy Council The Judicial Committee of the Privy Council (JCPC) is the highest court of appeal for the Crown Dependencies, the British Overseas Territories, some Commonwealth countries and a few institutions in the United Kingdom. Established on 14 Aug ...
, becoming the first environmental case ever heard by that body. In a split 3-2 ruling, the Privy Council discounted the flaws in the EIA and allowed the project to proceed. The fight against the dam was chronicled in the 2009 book ''The Last Flight of the Scarlet Macaw'' by Bruce Barcott. After the completion of the dam, the Belize Institute of Environmental Law and Policy (BELPO) sued Fortis, alleging the company failed to monitor water quality in the Macal River and did not implement an adequate emergency warning system in case the dam broke.


References

{{stack, {{Portal, Belize, Water, Renewable energy Dams in Belize Dams completed in 2005 Gravity dams Hydroelectric power stations in Belize Roller-compacted concrete dams