Cairo Metro Line 3
   HOME

TheInfoList



OR:

Cairo Metro Line 3 is a main line of the
Cairo Metro The Cairo Metro ( ar, مترو أنفاق القاهرة, Metro Anfāq al-Qāhirah, lit. "Cairo Tunnel Metro" or   ) is the rapid transit system in Greater Cairo, Egypt. It was the first of the three full-fledged metro systems in Africa a ...
mass transit Public transport (also known as public transportation, public transit, mass transit, or simply transit) is a system of transport for passengers by group travel systems available for use by the general public unlike private transport, typical ...
system in
Greater Cairo The Greater Cairo Region (GCR; ar, القاهرة الكبرى, Al-Qāhira al-Kubrā) is th an economic region with no administrative body comprising the three governorates of Cairo, Giza and Qalyubia. Within it lies the largest metopolitan are ...
,
Egypt Egypt ( ar, مصر , ), officially the Arab Republic of Egypt, is a List of transcontinental countries, transcontinental country spanning the North Africa, northeast corner of Africa and Western Asia, southwest corner of Asia via a land bridg ...
. Currently, the line connects Kit Kai in west-central Cairo with Al Salam bus stop at a station named Adly Mansour metro station. The line crosses the River Nile twice at the western branch between Kit Kat and Zamalek and the eastern branch between Zamalek and downtown Cairo. The line will eventually extend from the northwest of the Greater Cairo area at Imbaba to the northeast serving
Cairo International Airport Cairo International Airport (; ''Maṭār El Qāhira El Dawly'') is the principal international airport of Cairo and the largest and busiest airport in Egypt. It serves as the primary hub for Egyptair and Nile Air as well as several other a ...
. The total length of the line will be approximately 30.6 km of which 28.1 km is an underground section and the rest of the line about 2.5 km shall be on grade and will be implemented in four phases. The project includes a main workshop adjacent to the western terminal of the line and a light repair workshop at the middle of the line at Abbassia station. The line will use trains manufactured in Japan by Kinki Sharyo Co. and Toshiba Corp. Caire Metro Line 3 is the only metro line in Cairo managed by a private operator-maintainer, namely
RATP Dev RATP may refer to: Transportation: * RATP Group, or ', a public transport operator based in Paris, France * RATP Iași (), a transit operator responsible for public transportation in Iași, Romania * RATP Ploiești (), a transit operator respons ...
within the framework of a 15-year contract signed in 2020 and in execution since June 2021.


Construction

Construction began in 2006, with the first section opening on February 21, 2012. The line is planned to consist of 39 stations, 26 tunnel stations, 11 elevated stations and 2 at-grade stations. The whole line (except for the Heliopolis Square-Cairo International Airport branch) is set to be completed by November 2022. Line No. 3 was first started with the Attaba to Abbasia section, the "first phase", followed by the second phase, from Abbasia to Heliopolis, which are the two most urgent sections with respect to transportation needs. The design of phase 1 needed to take into consideration the safe crossing of two major underground structures; namely, the line 2 bored tunnel at Attaba, and the wastewater spine tunnel north of Attaba. It was also planned that some of the underground stations would be used as extensive commercial centres. These stations will be constructed by the cut-and-cover method and the rolling stock will be fed by power through a third rail. Orascom Construction Industries won the tender for for the construction of the first phase of the project. The line has trains supplied by a joint venture of
Kinki Sharyo is a Japanese manufacturer of railroad vehicles based in Osaka. It is an affiliate company of Kintetsu Corporation. In business since 1920 (as Tanaka Rolling Stock Works) and renamed The Kinki Sharyo Co., Ltd in 1945. They have produced light r ...
and
Toshiba , commonly known as Toshiba and stylized as TOSHIBA, is a Japanese multinational conglomerate corporation headquartered in Minato, Tokyo, Japan. Its diversified products and services include power, industrial and social infrastructure systems, ...
and a contactless fare collection system and integrated supervision and communication system supplied by the
Thales Group Thales Group () is a French multinational company that designs, develops and manufactures electrical systems as well as devices and equipment for the aerospace, defence, transportation and security sectors. The company is headquartered in Pari ...
. France provided a 280 million dollar loan for the second phase of the project to French companies involved in the project.


Operational

Phase 1 was completed on 21 February 2012. It runs from Attaba Station to Abbassia Station. This first phase includes five underground stations ( Attaba, Bab El Shaaria,
El Geish Tala'ea El Gaish Sporting Club ( ar, نادي طلائع الجيش الرياضي) (Translated: “Army Vanguard”), is an Egyptian sports club based in Cairo, Egypt. The club is mainly known for its professional football team, which current ...
, Abdou Pasha and
Abbassia Abbassia ( ar, العباسية  ) is a neighbourhood in Cairo, Egypt. The Saint Mark's Coptic Orthodox Cathedral, Cairo is located in Abbassia. The medical faculty of Ain Shams University and its affiliate hospital units are located in A ...
) and serves the eastern part of Cairo from the city centre. 3,500 people, including 85 expatriate staff, worked on this project, which took 51 months to complete. The project was built by a consortium, led by VINCI Construction Grands Projets, comprising Bouygues Travaux Publics, Orascom and Arab Contractors. The first phase cost a total of (US$700 million). The work was delayed in September 2009, after a landslide hit the construction site on Al-Gueich Street. The phase 1 civil engineering contract covered construction of a 4.3 km tunnel section and five stations. VINCI subsidiary ETF-Eurovia Travaux Ferroviaires led the consortium responsible for the track works. This included the supply and laying of 11 km of track and the power rail in the tunnel. In 2012 it was thought to eventually transport between 250,000 and 300,000 passengers per day. Phase 2 was set to be completed in October 2013, but was pushed back, and was opened on 7 May 2014. The construction was led by consortium with VINCI, Bouygues Travaux Publics, Orascom and Arab Contractors. It is a 7.2 km tunnel. Construction work on phase 2 began in mid-2009. It runs from Abbassiya Stationto Al Ahram Station in Heliopolis, with five stations, Fair Zone, Cairo Stadium, Koleyet El Banat,
Al Ahram ''Al-Ahram'' ( ar, الأهرام; ''The Pyramids''), founded on 5 August 1875, is the most widely circulating Egyptian daily newspaper, and the second oldest after ''Vekayi-i Misriye, al-Waqa'i`al-Masriya'' (''The Egyptian Events'', founded 18 ...
and Haroun. The costs of this phase were about 498M€, of which 1M€ was financed by a grant from the French Fund for Global Environment, 44M€ by the French Development Agency, 200M€ by the French Ministry of Finance (via the Réserve Pays Emergents) and with from the Government of Egypt. Phase 4-1 was the first stage of the final phase in Line 3 which started at 2015 with a plan for it to continue where it originally left off on the eastern side of the line completing its path towards El-Nozha. It starts from Haroun Street and passes through Heliopolis Square and ends at Ain Shams District. It has four tunnel stations: Haroun, Heliopolis Square, Alf Masken and El-Shams Club. Haroun El-Rashid, El-Shams Club and Alf Maskan stations opened on June 15, 2019, in time for the
2019 Africa Cup of Nations The 2019 Africa Cup of Nations (abbreviated as AFCON 2019 or CAN 2019), known as the Total 2019 Africa Cup of Nations for sponsorship reasons, was the 32nd edition of the Africa Cup of Nations, the biennial international men's football championshi ...
. Heliopolis Square station opened on 20 October 2019. Phase 4-2 starts from El-Nozha passing through Qobaa on Gesr Al-Suez Street then towards Hikestep district and ends at Adly Mansour Station in El-Salam City (near El-Asher Bus Stop). It has six elevated stations. This stage has been completed and was opened to the public by the president on 16 August 2020. Phase 3-1 was set to begin in 2011, led by a consortium with Orascom and Arab Contractors as the main contractors for the project; this phase will connect Attaba Station with the already existing Gamal Abdel Nasser Station through 26 July Street, it will then continue on its way onto northern
Maspero People with the name Maspero include: *François Maspero (1932–2015), French author and journalist *Gaston Maspero (1846–1916), French Egyptologist *Georges Maspero (1872–1942), French sinologist, son of Gaston *Henri Maspero (1882–1945), F ...
(new station) and run under both branches of the Nile passing through
Zamalek Zamalek ( ar, الزمالك , ''al zamalek'') is an affluent district of western Cairo encompassing the northern portion of Gezira Island in the Nile River. The island is connected with the river banks through three bridges each on the east a ...
island at Safaa Hegazy Station and ending at Kit Kat Station under the Kit Kat Square. It was delayed due to the
uprising Rebellion, uprising, or insurrection is a refusal of obedience or order. It refers to the open resistance against the orders of an established authority. A rebellion originates from a sentiment of indignation and disapproval of a situation and ...
in Egypt. Construction of the western branch of Line 3 started in September 2017, and it opened on October 10, 2022.


Under construction

Phase 3-2 will be starting from Kit Kat Station heading towards Sudan Street (new station) then towards Imbaba to the cross point of 6 October West Wing highway (under construction) and Alexandria freight railway then ends at Rod Al-Farag Corridor Station and will have 6 new stations. Phase 3-3 will be starting from Kit Kat Station heading towards Al Tawfikiya (new station) passing through
Mohandessin Mohandiseen ( '  , "The Engineers"), is a major 1940s sub-division project originally named Madinat al-Awqaf, and made up most of the Wasat (middle) district in the city of Giza, before being divided in 1997 into the districts of Agouza (cove ...
(Wadi Al-Nile Station, Gamaet Al-Dowal Station) then heading to Bulak Al-Dakror Station to the Cairo University Station of Line 2 where Line 2 and Line 3 will be connected to each other. This stage is set for a completion date of November 2022. Phase 4-3 will start from Heliopolis Square Station passing through Al-Hegaz Square and Military Academy area to Sheraton District then ends at
Cairo International Airport Cairo International Airport (; ''Maṭār El Qāhira El Dawly'') is the principal international airport of Cairo and the largest and busiest airport in Egypt. It serves as the primary hub for Egyptair and Nile Air as well as several other a ...
. It will have five tunnel stations. Construction has yet to start for this stage and it doesn't have a completion date as of yet.


Connections


To other Metro lines

Line 3 connects to Line 2 at Attaba Station and with Line 1 at Nasser Station.


To other forms of transit

Cairo metro Line 3 riders can access
Egyptian National Railways Egyptian National Railways (ENR; ar, السكك الحديدية المصرية, Al-Sikak al-Ḥadīdiyyah al-Miṣriyyah) is the national railway of Egypt and managed by the parastatal Egyptian Railway Authority (ERA; ar, الهيئة الق ...
long-haul and short-haul domestic passenger service via transfer to Line 2 and debarkation at Shohadaa Station near
Ramses Station Ramses Railway Station ( ar, محطة رمسيس, Maḥaṭṭat Ramsīs), also called Misr Station ( ar, محطة مصر, Maḥaṭṭat Miṣr), is the main railway station of Cairo, Egypt. The name is derived from the Ancient Egyptian Phar ...
. Cairo Transport Authority buses and private microbus services are also nearby. Access to
Cairo International Airport Cairo International Airport (; ''Maṭār El Qāhira El Dawly'') is the principal international airport of Cairo and the largest and busiest airport in Egypt. It serves as the primary hub for Egyptair and Nile Air as well as several other a ...
is planned upon completion of Phase 4-3 (no completion date yet). The Cairo LRT is a
commuter rail Commuter rail, or suburban rail, is a passenger rail transport service that primarily operates within a metropolitan area, connecting commuters to a central city from adjacent suburbs or commuter towns. Generally commuter rail systems are con ...
line linking the
New Administrative Capital The New Administrative Capital (NAC) ( ar, العاصمة الإدارية الجديدة, al-ʿĀṣima al-ʾIdārīya al-Gadīda) is a new urban community in Cairo Governorate, Egypt and a satellite of Cairo City. It is planned to be Egypt's n ...
with Cairo. The line starts at Adly Mansour Station at Al Salam City providing a transfer to the Cairo Metro Line 3, and splits into two branches at Badr station. The northern branch runs parallel to the Cairo Ring Road, reaching 10th of Ramadan City. The southern branch connects to the New Administrative Capital. Intermediate cities along the train's route include Obour,
El Shorouk El Shorouk ( ar, الشروق  , "the Sunrise") is a city in the Greater Cairo area, specifically located northeast of Cairo and north of New Cairo in the province of Cairo. El Shorouk is one of Third Generation cities, established by Prim ...
, and Future City. Line 3 is also slated to connect to both Monorail projects in the Greater Cairo Area. The New Administrative Capital Monorail will meet Line 3 at Stadium station, which will serve as the monorail's terminus. The 6th of October City Monorail will eventually connect to Line 3 in Nile Valley station, part of the line's western expansion plans.


Criticism

There was a 10 meter deep sinkhole in the road in a muddy area reclaimed from the Nile during the very first phase of construction in 2009, a car was swallowed but luckily there was no structural damage to the surrounding buildings. When construction began, residents of the historic island of Zamalek were concerned that the location of the station was not opportune. A complaint was filed to the
European Investment Bank The European Investment Bank (EIB) is the European Union's investment bank and is owned by the EU Member States. It is one of the largest supranational lenders in the world. The EIB finances and invests both through equity and debt solution ...
, which helped finance the project, which dismissed the complaint. The residents fears were nevertheless confirmed on 26 July 2020, when an apartment building above one of the construction sites subsided and was evacuated. The fence of the adjoining Bahraini embassy also showed signs of damage.


See also

* List of Cairo Metro stations


External links


Mobility Cairo - Network Maps and Line 3 Maps


References


Line 3 on Google Maps
{{Cairo Metro Cairo Metro Railway lines opened in 2012