British Rail Class 33
   HOME

TheInfoList



OR:

The British Rail Class 33, also known as the BRCW Type 3 or Crompton, is a class of
Bo-Bo B-B and Bo-Bo are the Association of American Railroads (AAR) and British classifications of wheel arrangement for railway locomotives with four axles in two individual bogies. They are equivalent to the B′B′ and Bo′Bo′ classifications i ...
diesel-electric locomotive A diesel locomotive is a type of railway locomotive in which the prime mover is a diesel engine. Several types of diesel locomotives have been developed, differing mainly in the means by which mechanical power is conveyed to the driving wheels ...
s, ordered in 1957 and built for the
Southern Region of British Railways The Southern Region was a region of British Railways from 1948 until 1992 when railways were re-privatised. The region ceased to be an operating unit in its own right in the 1980s. The region covered south London, southern England and the south ...
between 1960 and 1962. They were produced as a more powerful Type 3 (1,550 bhp) development of the 1,160 bhp Type 2 Class 26. This was achieved, quite simply, by removing the steam heating boiler and fitting a larger 8 cylinder version of the previous 6 cylinder engine. This was possible because of the traffic requirements of the Southern Region: locomotive-hauled passenger traffic depended on seasonal tourist traffic and was heavier in the summer, when carriage heating was not needed. In the winter, their expected use was to be for freight. Thus, they became the most powerful BR Bo-Bo diesel locomotive. The perennially unreliable steam heating boiler could also be avoided. A total of 98 were built by the
Birmingham Railway Carriage and Wagon Company The Birmingham Railway Carriage and Wagon Company (BRC&W) was a railway locomotive and carriage builder, founded in Birmingham, England and, for most of its existence, located at nearby Smethwick, with the factory divided by the boundary ...
(BRCW) and they were known as "Cromptons" after the Crompton Parkinson electrical equipment installed in them. Like their lower-powered BRCW sisters, the Class 26 and Class 27 locomotives, their bodywork and cab ends were of all steel construction. They were very similar in appearance to Class 26 locos, but carried Southern Region two-digit headcode blinds between the cab windows. The original (1957) number sequence was D6500–D6597.


Background

The locomotives were initially needed, unusually, because of an electrification scheme. The 'Kent Coast scheme' was one of five major electrification schemes put forward by the
1955 Modernisation Plan Events January * January 3 – José Ramón Guizado becomes president of Panama. * January 17 – , the first nuclear-powered submarine, puts to sea for the first time, from Groton, Connecticut. * January 18– 20 – Battle of Yijian ...
. Under Stage 1 of the scheme, the majority of railway lines east of a line drawn between
Reading Reading is the process of taking in the sense or meaning of letters, symbols, etc., especially by sight or touch. For educators and researchers, reading is a multifaceted process involving such areas as word recognition, orthography (spell ...
and
Portsmouth Portsmouth ( ) is a port and city in the ceremonial county of Hampshire in southern England. The city of Portsmouth has been a unitary authority since 1 April 1997 and is administered by Portsmouth City Council. Portsmouth is the most d ...
would be electrified. On secondary and branch lines not electrified, such as Tonbridge – West St. Leonards,
diesel electric multiple unit A diesel multiple unit or DMU is a multiple-unit train powered by on-board diesel engines. A DMU requires no separate locomotive, as the engines are incorporated into one or more of the carriages. Diesel-powered single-unit railcars are also ...
s would work passenger services. The scheme involved the electrification of 250 route miles (400 km) of track at a cost of approximately £25m. The
British Transport Commission The British Transport Commission (BTC) was created by Clement Attlee's post-war Labour government as a part of its nationalisation programme, to oversee railways, canals and road freight transport in Great Britain (Northern Ireland had the se ...
(BTC) approved the scheme in February 1956. The Southern Region established an Electrification Committee, which met monthly from August 1955. On the South Eastern section, electrification was to be carried out in two phases. Phase 1 would cover the north Kent routes via and , including the Sheerness line, which had not featured in any previous electrification proposals. Phase 2 would cover the remainder of the South Eastern section routes that were to be electrified. The initial assessment was that eighty-eight and twenty . Bo-Bo
diesel locomotive A diesel locomotive is a type of railway locomotive in which the prime mover is a diesel engine. Several types of diesel locomotives have been developed, differing mainly in the means by which mechanical power is conveyed to the driving whee ...
s would be needed, plus twenty
electric locomotive An electric locomotive is a locomotive powered by electricity from overhead lines, a third rail or on-board energy storage such as a battery or a supercapacitor. Locomotives with on-board fuelled prime movers, such as diesel engines or g ...
s. By November, it was thought that 98 locomotives of would be needed. That figure was based on the locomotives collectively achieving annually. The locomotives would be used on passenger, van and freight trains, as well as working inter-regional services. The
British Transport Commission The British Transport Commission (BTC) was created by Clement Attlee's post-war Labour government as a part of its nationalisation programme, to oversee railways, canals and road freight transport in Great Britain (Northern Ireland had the se ...
approved the electrification scheme in February 1956. By April 1956, it was apparent that the new locomotives would not be powerful enough, as the Southern Region was intent on eliminating the steam heating of its trains in favour of electric train heating (ETH). As an interim, it was intended that fifteen Sulzer Type 2 locomotives would be allocated to the Southern Region. The Electrification Committee informed the BTC of their requirements in October, advising them that they had been in contact with Sulzer Brothers Ltd. to determine whether or not a locomotive in the range could be built. On 4 December, a meeting between the General and Assistant General Managers of the Southern Region and the BTCs Secretary-General, Chief Mechanical Engineer and a Technical member, it was agreed to approach
English Electric N.º UIC: 9094 110 1449-3 (Takargo Rail) The English Electric Company Limited (EE) was a British industrial manufacturer formed after the Armistice of 11 November 1918, armistice of World War I by amalgamating five businesses which, during th ...
to build the locomotives. This was against the
competitive tendering Best Value was government policy in the United Kingdom affecting the provision of public services in England and Wales. In Wales, Best Value is known as the Wales Programme for Improvement. A statutory duty of Best Value applies in Scotland.Audi ...
policy in force at the time, but was done as it was thought that this would be the quickest way to acquire the locomotives. A few days later, BTC Chairman Sir Brian Robertson told a director of Vickers-Armstrong Ltd. of the plan at a social event. Vickers-Armstrong was the builder of Sulzer engines in the United Kingdom. The company was not happy with the situation and a protest was made. In February 1957, the BTC decided to put the process for the procurement of the new locomotives out to tender. To enable Phase 1 of the electrification to be implemented in June 1959, forty-five diesel locomotives would be needed. In addition, fifteen Type 2 locomotives (later class 24) would be loaned by the London Midland Region. Tenders were returned to the Electrification Committee in July 1957. The committee made its recommendations to the BTC, which met on 8 August. The BTC discussed an order for forty-five locomotives at a cost of £76,970 each. They were to be built by the
Birmingham Railway Carriage and Wagon Company The Birmingham Railway Carriage and Wagon Company (BRC&W) was a railway locomotive and carriage builder, founded in Birmingham, England and, for most of its existence, located at nearby Smethwick, with the factory divided by the boundary ...
(BRCW), with Crompton Parkinson electrical equipment and Sulzer engines. Deliveries were to start in April 1959, with thirty locomotives in service by June. Despite offering a cheaper locomotive and better delivery times, English Electric did not gain the order. The BTC approved the order on 26 September. The order was not placed until 5 December. Under the terms of the tender, deliveries were to start 21 months from the placing of the order, and continue at three per month thereafter. This meant that the first locomotives would be delivered in November 1959 and completed by February 1961. None of the locomotives would be in service for the planned start date of Phase 1 of the electrification plan. At their January 1958 meeting, the Electrification Committee heard that delivery of the locomotives would be calculated once all technical details had been agreed. One locomotive would be delivered 21 months thereafter, two the following month and three per month after that. This pushed back final delivery until March 1961. In February 1958, the BTC approved the purchase of thirty-four Type 2 locomotives, but deferred a decision on 51 others due to be built in 1959, including twenty needed for Phase 2 of the electrification programme. In November, the Electrification Committee was informed that due to the delays in delivery, the phasing out of steam locomotives would be delayed. It was agreed to push for the purchase of the second batch of 20 locomotives. The BTC discussed the purchase later that month, and agreed to accept BRCWs tender of £78,940 per locomotive. Eleven locomotives were to be delivered by December 1960 and the rest by February 1961. In February 1959, the Electrification Committee discussed a third batch of 33 locomotives, including 12 suitable to work the Hastings line. The BTC approved the locomotives for the Hastings line in May, but deferred a decision on the other 21. These locomotives would cost £78,858 each. In July, the Electrification Committee expressed the view that the remaining locomotives should be ordered without delay. In August, there was concern that late deliveries would impact on driver training. The BTC approved the order of the final 21 locomotives in September at a cost of £78,380 each. In December, BRCW reported to the Electrification Committee that the first locomotive would not be delivered until 8 January 1960. The Electrification Committee met again on 14 January, and were told that the first locomotive would not be delivered until 22 January, with another in February and a total of 9 by 16 April. It was hoped that all forty-five locomotives of the first batch will have been delivered by October. The committee met again on 19 January. It was stated that the intention was that the second batch of locomotives would have been delivered by 11 September 1961. The third batch (for the Hastings line) were needed in service by June 1962. It was hoped that deliveries would begin in July 1961 and be completed in September. The first locomotive, numbered D6500, was delivered on 30 January. The Electrification Committee met again on 10 March, when they were told that only thirteen of the twenty locomotives of the first batch would be in service by June, although it was hoped that all forty-five would be in service by October. Concerns were expressed that Ramsgate
Motive Power Depot The motive power depot (MPD) or locomotive depot, or traction maintenance depot (TMD), is the place where locomotives are usually housed, repaired and maintained when not being used. They were originally known as "running sheds", "engine she ...
(MPD) would not be able to close by 14 November as planned. Its site was needed for the construction of a new maintenance facility for
electric multiple unit An electric multiple unit or EMU is a multiple-unit train consisting of self-propelled carriages using electricity as the motive power. An EMU requires no separate locomotive, as electric traction motors are incorporated within one or a number ...
s. The committee met again in May. As delivery of all forty-five locomotives of the first batch was projected not to be completed until 31 January 1961, the closure of Ramsgate MPD was postponed. The committee was told that delays in the delivery of the third batch would mean that the replacement of steam on the Hastings line would have to be postponed. The committee met in June. It was agreed that Ramsgate MPD could close once thirty-five locomotives had been delivered. It was anticipated that this would be achieved by 30 November allowing the shed to closed on 1 December. By the time the Electrification Committee met on 10 November, thirty locomotives had been delivered. Consequently, Ramsgate MPD would not be able to be closed until at least 19 December. Delivery of the locomotives for the Hastings line was also likely to be delayed. When the committee met in December, the thirty-five locomotives had been delivered and permission was given for the closure of Ramsgate MPD. The BTC wanted to arrange a test of the ETH system fitted to the locomotives. It was agreed that a locomotive would be released at the end of January 1961 for three weeks. The Electrification Committee met in February 1961. Delivery of the first of the second batch of locomotives was due to start on 24 February and be complete by 7 July. The third batch was due to be delivered between 8 December and 23 February 1962 and the fourth batch by the end of June 1962. The final locomotive of the first batch, D6544, was delivered fourteen months later than the original delivery date. Delivery of the first of the second batch of locomotives was on 7 March. The committee met again in April. Although delivery of the second batch of locomotives was still on schedule for 7 July, by the time at Phase 2 of the electrification scheme was put into operation in June, there would be a shortfall of fifteen locomotives against the number required. When the committee met in May, delivery of the last of the second batch of locomotives had been put back to 15 July. The third batch would not start to be delivered until 23 February 1962, with completion by 31 March. The fourth batch was scheduled to be delivered between 23 January and 31 March 1962. The committee met again in July. Completion of the second batch of locomotives had been pushed back to 29 July. Start of deliveries of the third and fourth batches had been delayed, but final deliver dates remained the same. The Electrification Committee met for the final time on 14 September. Delivery of the fourth batch had started; 69 locomotives had been delivered up to that date. As Phase 2 of the electrification scheme had been implemented, the Southern Region set up the Traction Committee, which met for the first time on 15 December. Eighty-one of the 85 Restriction 4 locomotives had been delivered, but the final locomotive was not now due for delivery until 12 January 1962. Delivery of the locomotives for the Hastings line was due to start a week later, and be complete by 6 April 1962. At that meeting discussion took place in respect of the annual milage the fleet would accrue. The original estimate of had been revised upwards to but had then been revised down to due to the introduction of electric multiple units for most passenger trains and changes in freight requirements. This meant that only 70 locomotives would be needed, leaving 28 surplus to requirements. Reallocation of the surplus locomotives was discussed. BTC approval was needed for reallocation, although the BTC had the power to order the locomotives to be reallocated. They could have challenged the Southern Region as to why the order had not been amended. By this time, two locomotives had been transferred to the Eastern Region to work cement trains between
Cliffe, Kent Cliffe is a village on the Hoo Peninsula in Kent, England, reached from the Medway Towns by a three-mile (4.8 km) journey along the B2000 road. Situated upon a low chalk escarpment overlooking the Thames marshes, Cliffe offers views of ...
and Uddingston,
Lanarkshire Lanarkshire, also called the County of Lanark ( gd, Siorrachd Lannraig; sco, Lanrikshire), is a historic county, lieutenancy area and registration county in the central Lowlands of Scotland. Lanarkshire is the most populous county in Scotl ...
. The Traction Committee met again in January 1962. With seven locomotives allocated to the cement trains, work had to be found for the remaining 21. If these locomotives were allocated to the South Western Division to work tank trains from
Fawley Refinery Fawley Refinery is an oil refinery located at Fawley, Hampshire, England. The refinery is owned by Esso Petroleum Company Limited, a subsidiary of Exxon Mobil Corporation, which acquired the site in 1925. Situated on Southampton Water, it was ...
to various destinations in the London Midland and
Western Regions The Western Regions or Xiyu (Hsi-yü; ) was a historical name specified in the Chinese chronicles between the 3rd century BC to the 8th century AD that referred to the regions west of Yumen Pass, most often Central Asia or sometimes more sp ...
, 36 steam locomotives could be withdrawn from service. The oil traffic was a new introduction, for which no provision had been made in the locomotive building programme. By the time then next meeting of the committee in March, some of the locomotives had been temporarily transferred to the South Western Division. The BTC were appraised of the situation in respect of the spare locomotives. It was stated that the new timetable due for introduction in June had a substantial reduction in freight, which had only been recently decided upon and could not have been foreseen when the locomotives were ordered. The BTC replied that they were concerned at the drastic cut in numbers required. They felt that the locomotives could be used following Stages 2 and 3 of the electrification programme. Another possibility was using the locomotives in the
Sheffield Sheffield is a city in South Yorkshire, England, whose name derives from the River Sheaf which runs through it. The city serves as the administrative centre of the City of Sheffield. It is historically part of the West Riding of Yorkshire ...
area, where the order of a number of Type 3 locomotives had already been authorised. The locomotives lack of steam heating was a factor against their use however. The committee responded that the use following the implementation of Stages 2 and 3 held good. They appreciated the BTCs position over the Sheffield scheme, but would put forward proposals that kept the locomotives on the Southern Region. In March, the General Manager's department held a meeting to discuss the use of the locomotives on the Fawley oil trains. The Traction Committee met in April. They were told that the South Western Division had identified that the twenty-one locomotives could be used on the Fawley oil trains. A formal justification would be made to the BTC for the use of locomotives on the cement trains. This traffic was profitable and the contract had been negotiated on the basis that diesel locomotives would be used. A meeting between the Southern and Eastern Regions on 31 May resulted in a decision that only four locomotives would be needed to work the cement trains. The Central Division had identified that the three spare locomotives could be used on freight trains between and . The BTC met on 29 June to consider the reallocation of the spare locomotives. Fifteen were to be allocated to the Fawley oil traffic, nine to cross-London freight traffic from
Feltham Feltham () is a town in West London, England, from Charing Cross. Historically part of Middlesex, it became part of the London Borough of Hounslow in 1965. The parliamentary constituency of Feltham and Heston has been held by Labour Party ...
and four to the Cliffe cement traffic. The use of the locomotives on the South Western Division would allow the withdrawal of forty-nine steam locomotives and a loss of thirty-five jobs. A meeting of Southern Region officials on 16 July discussed the exact information that the BTC required for the permanent reallocation of the spare locomotives. The issue would be discussed at a Board meeting of the Southern Region to be held on 6 September. The Western Region had reservations about the locomotives working the Fawley oil trains single-headed. A test with a 1,000-ton train between
Winchester Winchester is a City status in the United Kingdom, cathedral city in Hampshire, England. The city lies at the heart of the wider City of Winchester, a local government Districts of England, district, at the western end of the South Downs Nation ...
and on 31 July had been successful. The Western Region had agreed that these trains could be worked single-handed by 12 September, when the Traction Committee met.


Design

The locomotives were based on the Sulzer Type 2 locomotives that BRCW had built for the
Scottish Region of British Railways The Scottish Region (ScR) was one of the six regions created on British Railways (BR) and consisted of ex-London, Midland and Scottish Railway (LMS) and ex-London and North Eastern Railway (LNER) lines in Scotland. It existed from the creation o ...
. The cabs were altered slightly, with the centre section housing a two figure route indicator. They were built at BRCWs
Smethwick Smethwick () is an industrial town in Sandwell, West Midlands, England. It lies west of Birmingham city centre. Historically it was in Staffordshire. In 2019, the ward of Smethwick had an estimated population of 15,246, while the wider b ...
works. The underframe and bodysides form an integral superstructure. The cabs are double skinned, with driving controls both sides to make shunting easier. The roof is of
glass reinforced plastic Fiberglass (American English) or fibreglass (Commonwealth English) is a common type of fiber-reinforced plastic using glass fiber. The fibers may be randomly arranged, flattened into a sheet called a chopped strand mat, or woven into glass clot ...
. Bogies are identical to those used on the Sulzer Type 2, with SKF
roller bearing In mechanical engineering, a rolling-element bearing, also known as a rolling bearing, is a bearing which carries a load by placing rolling elements (such as balls or rollers) between two concentric, grooved rings called races. The relative m ...
s and brakes on all wheels. The handbrake works on the inner set of wheels of each bogie. The engine is a Sulzer 8LDA28
diesel engine The diesel engine, named after Rudolf Diesel, is an internal combustion engine in which ignition of the fuel is caused by the elevated temperature of the air in the cylinder due to mechanical compression; thus, the diesel engine is a so-cal ...
, built by Vickers Armstrong at
Barrow-in-Furness Barrow-in-Furness is a port town in Cumbria, England. Historically in Lancashire, it was incorporated as a municipal borough in 1867 and merged with Dalton-in-Furness Urban District in 1974 to form the Borough of Barrow-in-Furness. In 2023 t ...
, Lancashire. It has eight cylinders of 280 mm bore by 360 mm stroke and develops at 750 rpm. a Sulzer
de Havilland The de Havilland Aircraft Company Limited () was a British aviation manufacturer established in late 1920 by Geoffrey de Havilland at Stag Lane Aerodrome Edgware on the outskirts of north London. Operations were later moved to Hatfield in H ...
LAG 37-17
turbocharger In an internal combustion engine, a turbocharger (often called a turbo) is a forced induction device that is powered by the flow of exhaust gases. It uses this energy to compress the intake gas, forcing more air into the engine in order to pro ...
is fitted. The main generator is a Crompton Parkinson CG391-B1. The locomotives are fitted with dual
air The atmosphere of Earth is the layer of gases, known collectively as air, retained by Earth's gravity that surrounds the planet and forms its planetary atmosphere. The atmosphere of Earth protects life on Earth by creating pressure allowing f ...
and vacuum brakes and can work in multiple with any other "blue star" locomotives.


Electric Train Heating (ETH)

The electrical heating system worked at a DC voltage of 800 V, with a generator capacity of . As this was early days for ETH on BR, standards were not yet clear and there was a possibility in this region of a future need to heat continental stock from
boat train A boat train is a passenger train operating to a port for the specific purpose of making connection with a passenger ship, such as a ferry, ocean liner, or cruise ship. Through ticketing is normally available. __NOTOC__ Notable named boat tr ...
s. Both two pole and single pole systems were supported; two pole becoming the standard on BR but some continental stock using a single pole system with return through the rails. Electrically, the main traction generator was separate from the heating generator, although both were built mechanically as part of the same machine. A third auxiliary generator of 57 kW was arranged similarly, to provide a supply for the traction motor cooling blowers, pumps, brake exhausters etc. The electrical rating for traction power was the same whether heating was in use or not, but the excess engine power now became available for traction. Avoiding the weight of the boiler and its water and fuel supplies allowed the diesel fuel capacity to be increased from 500 gallons to 800 gallons, compared to the Type 2s.


New-build locomotives


Class 33/0 – standard locomotives

All 86 of the first delivery were built as standard locomotives, numbered D6500 to D6585. Under TOPS they became class 33/0 and the surviving locomotives, excluding the 19 that were converted for push-pull operation, were renumbered 33 001–33 065. The locomotives were built to Restriction 4, which was the normal standard and equivalent to British Railways standard C1 restriction. All 86 locomotives were route availability 6. Two accident-damaged locomotives were withdrawn before TOPS took effect.


Class 33/2 – narrow-bodied locomotives

A batch of twelve locomotives was built with narrow bodies, to allow them to work through the narrow tunnels between , Kent, and , Sussex. The Hastings Line was designated Restriction 0. This required the bodies to be reduced in width to avoid clipping tunnel linings on that line, leading to their nickname of 'Slim Jims'. These locomotives were wide over the steps and over the body. Originally numbered D6586 to D6597, they were later renumbered 33201 to 33212. These locomotives were fitted with slow-speed control to enable them to work
merry-go-round train A merry-go-round train, often abbreviated to MGR, is a block train of hopper wagons which both loads and unloads its cargo while moving. In the United Kingdom, they are most commonly coal trains delivering to power stations. These trains were ...
s. All 12 locomotives were route availability 6.


Early years

D6500 entered service on 30 January 1960. D6501 on 28 February and D6502/3/4 in March. On 2 April, D6502 and D5012 worked a
boat train A boat train is a passenger train operating to a port for the specific purpose of making connection with a passenger ship, such as a ferry, ocean liner, or cruise ship. Through ticketing is normally available. __NOTOC__ Notable named boat tr ...
from
London Victoria Victoria station, also known as London Victoria, is a central London railway terminus and connected London Underground station in Victoria, in the City of Westminster, managed by Network Rail. Named after the nearby Victoria Street (not the Q ...
to via . A new timetable was introduced on 13 June. There were twelve locomotives available, enough to enable the class to be introduced to passenger trains, including the ''Man of Kent'' and ''
Night Ferry The ''Night Ferry'' was an international boat train from London Victoria to Paris Gare du Nord that crossed the English Channel on a train ferry. It ran from 1936 until 1939 when it ceased due to the onset of World War II. It resumed in 1947 ...
''. The class was also introduced to service of freight trains between and
Dover Dover () is a town and major ferry port in Kent, South East England. It faces France across the Strait of Dover, the narrowest part of the English Channel at from Cap Gris Nez in France. It lies south-east of Canterbury and east of Maids ...
. The were allowed to haul 500-ton trains via , dropping to 460 tons via and and 450 tons via . On 17 July, locomotives D6506, E5004 and 20002 were used on the
Brighton Main Line The Brighton Main Line (also known as the South Central Main Line) is a major railway line in the United Kingdom that links Brighton, on the south coast of England, with central London. In London the line has two branches, out of and station ...
for rail joint tests between and . With the introduction of the winter timetable in September, the class were largely withdrawn from passenger service due to carriages still being heated by steam. Some trains were worked by steam locomotives and others by the Type 2 locomotives. Occasionally the class worked unheated passenger trains. D6504 was used for ETH tests on the
Eastern Region of British Railways The Eastern Region was a region of British Railways from 1948, whose operating area could be identified from the dark blue signs and colour schemes that adorned its station and other railway buildings. Together with the North Eastern Region (w ...
. It was exhibited at
Stratford, London Stratford is a town in east London, England, within the ceremonial county of Greater London. Until 1965 it was within the historic county of Essex. Part of the Lower Lea Valley, Stratford is situated 6 miles (10 km) east-northeast of Char ...
on 17 and 18 February in connection with a committee meeting of the UIC. The locomotive hauled trains between and between 13 and 17 February. Phase 2 of the electrification scheme came into service on 12 June 1961. The last of the second batch of locomotives, D6564, was delivered on 28 July. Delivery of the fourth batch of locomotives took place between 18 August and 12 January 1962. In November 1961, D6569 and D6559 were transferred to the Eastern Region to work CliffeUddingston cement trains. These trains comprised 30 wagons, with a train weight of 1,050 tons. A pair of locomotives hauled the trains from Cliffe to Ferme Park, just north of King's Cross. Haulage of the train was then taken over by Eastern or North Eastern Region locomotives. It was soon found that these locomotives were unable to keep to the schedule demanded. The Southern Region agreed that their locomotives could work the train as far as , operated by Eastern Region crews north of Ferme Park. This enabled an earlier arrival at York and the overall scheduled timing to Uddingston to be met. Seven locomotives were allocated to this traffic, allowing one to be spare. Operating costs were £104 per train, about half that of using steam locomotives. The round trip took 44 hours. One of these trains, hauled by D6558, appeared in
The Rank Organisation The Rank Organisation was a British entertainment conglomerate founded by industrialist J. Arthur Rank in April 1937. It quickly became the largest and most vertically integrated film company in the United Kingdom, owning production, distribut ...
's 1963 film ''High, Wide and Faster'', part of its documentary series ''Look at Life''. The third batch of locomotives was delivered between 2 February and 12 May 1962. In April, three locomotives were transferred to the South Western Division to work oil trains from
Fawley Refinery Fawley Refinery is an oil refinery located at Fawley, Hampshire, England. The refinery is owned by Esso Petroleum Company Limited, a subsidiary of Exxon Mobil Corporation, which acquired the site in 1925. Situated on Southampton Water, it was ...
, Hampshire. Initially, they were used on trains between Fawley and . In late April, a locomotive worked a Fawley– Spondon oil train as far as . It worked a freight train back to Eastleigh that day. Only the then new
electric train heating In rail transport, head-end power (HEP), also known as electric train supply (ETS), is the electrical power distribution system on a passenger train. The power source, usually a locomotive (or a generator car) at the front or 'head' of a train, p ...
was fitted, rather than the ubiquitous
steam heating A central heating system provides warmth to a number of spaces within a building from one main source of heat. It is a component of heating, ventilation, and air conditioning (short: HVAC) systems, which can both cool and warm interior spaces. ...
which passenger carriages largely used. Early delivery problems and a shortage of steam locomotives resulted in many Class 24 locomotives being borrowed from the Midland Region and pairs, of 33 + 24, became common on winter passenger services. This resulted in unpopular, complex run-round manoeuvres at termini as the Class 24 needed to be coupled inside to provide steam heat. Emergency provisioning of through-piping for steam heat on some examples of class 33 alleviated this somewhat. The Southern Region was unaccustomed to the operational overhead and maintenance associated with the use of class 24 and they rapidly became unpopular. With the advent of modern stock and warmer seasons, they were returned to the Midland Region.


Push-pull operations

The mainstay of push-pull operations was the operation over the then un-electrified track from Bournemouth to and the service continued like this across three decades. Weymouth trains started at
London Waterloo Waterloo station (), also known as London Waterloo, is a central London terminus on the National Rail network in the United Kingdom, in the Waterloo area of the London Borough of Lambeth. It is connected to a London Underground station o ...
powered by
third-rail A third rail, also known as a live rail, electric rail or conductor rail, is a method of providing electric power to a railway locomotive or train, through a semi-continuous rigid conductor placed alongside or between the rails of a railway ...
electric traction via
Winchester Winchester is a City status in the United Kingdom, cathedral city in Hampshire, England. The city lies at the heart of the wider City of Winchester, a local government Districts of England, district, at the western end of the South Downs Nation ...
and
Southampton Southampton () is a port city in the ceremonial county of Hampshire in southern England. It is located approximately south-west of London and west of Portsmouth. The city forms part of the South Hampshire built-up area, which also covers Po ...
to Bournemouth. The consist was normally twelve cars made up of a powerful
4REP The British Rail Class 432 ( 4-REP) electric multiple unit passenger trains were built by BR at York Works from 1966 to 1967 and in 1974. The units were built to power the TC trailer units on services on the South West Main Line. Fifteen four-c ...
electric multiple unit on the rear with two leading units of un-powered 4TCs. At Bournemouth the train would be divided with the 4REP remaining at the London end of Bournemouth station and the 4TCs hauled onward to
Poole Poole () is a large coastal town and seaport in Dorset, on the south coast of England. The town is east of Dorchester and adjoins Bournemouth to the east. Since 1 April 2019, the local authority is Bournemouth, Christchurch and Poole Counc ...
and Weymouth by Class 33/1. On the return leg, the locomotive propelled the train back to Bournemouth where it would be attached to a waiting London-bound 4REP and the locomotive detached to await the next Weymouth-bound portion. The usual configuration was 4TC+4TC+Loco with the locomotive at the country end. Light traffic would result in 4TC+Loco, and in rare operational circumstances 4TC+Loco+4TC was noted. This combination was not preferred, as it led to operational difficulties and inconvenience to waiting passengers who found themselves confronted with the side of the locomotive when their train has drawn to a halt. The Class 33/1 with one or two 4TC sets (normally with the Class 33/1 at the country end of the train) were also the mainstay of the Waterloo – Salisbury service from their introduction. Platform congestion and the lack of facilities at the very busy Basingstoke station were two of the reasons for class 33/1 operation throughout the route rather than just over the non-electrified section west of Basingstoke. In later years Weymouth boat trains, conveying passengers between London and the Channel Islands ferry service out of Weymouth, were handed over to push-pull operation. The section of route from Weymouth to the ship terminal at the
quay A wharf, quay (, also ), staith, or staithe is a structure on the shore of a harbour or on the bank of a river or canal where ships may dock to load and unload cargo or passengers. Such a structure includes one or more berths ( mooring locatio ...
was actually tramway, following (and largely in the middle of) the harbour road. The quay spur did not pass through the station, but diverged westwards at the throat thus it was not possible for
boat train A boat train is a passenger train operating to a port for the specific purpose of making connection with a passenger ship, such as a ferry, ocean liner, or cruise ship. Through ticketing is normally available. __NOTOC__ Notable named boat tr ...
s to call at Weymouth station. Boat trains had been made up of conventional coaching stock and the locomotive would run-round its train on arrival at the sea-terminal. The move to push-pull sets on boat trains removed two headaches for the SR: * The necessity for the run-round at the quay was removed. * The locomotive swap at Bournemouth (for both up and down trains) was eliminated and services were greatly improved with the removal of the troublesome Class 74 locomotive from the equation. Although class 73 and 74 electro-diesel locomotives had push-pull capability, they did not have the endurance for longer runs on diesel power – their 600/650HP was not even Type 1 – little more than a high-powered shunter equivalent. The Type 3 power of Class 33/1 with only a 4 or 8 car train was rarely into the recovery margin of a schedule due to load. Class 33/1 and 4TC combinations were often used to supplement other services and were not just the purview of Bournemouth-Weymouth trains. Services could be rostered for a push-pull set due to stock shortages – the Reading to Basingstoke service (normally a stronghold of
DEMU A diesel multiple unit or DMU is a multiple-unit train powered by on-board diesel engines. A DMU requires no separate locomotive, as the engines are incorporated into one or more of the carriages. Diesel-powered single-unit railcars are also ...
sets) could be relied upon to produce a push-pull set on Sundays. Often, electric rosters would be substituted by class 33/1 + 4TC if the line was de-energised during engineering work. Indeed, push-pull sets were a possibility over the entire range of Southern Region services including inter-regional trains; they were not in-frequent visitors to Bristol Temple Meads and have been noted at
Cardiff Cardiff (; cy, Caerdydd ) is the capital city, capital and List of urban areas in the United Kingdom, largest city of Wales. It forms a Principal areas of Wales, principal area, officially known as the City and County of Cardiff ( cy, Dinas a ...
. Although in private ownership at the time, 33103 and 4TC 417 were spot-hired for use on Barking-Gospel Oak services during a stock shortage in 1999 and worked the service for some weeks without issue.


Conversions – Class 33/1 – push-pull fitted locomotives

While
third rail A third rail, also known as a live rail, electric rail or conductor rail, is a method of providing electric power to a railway locomotive or train, through a semi-continuous rigid conductor placed alongside or between the rails of a railway ...
electrification was expanding on the Southern region, it was not then considered to be justified to extend beyond
Bournemouth Bournemouth () is a coastal resort town in the Bournemouth, Christchurch and Poole council area of Dorset, England. At the 2011 census, the town had a population of 183,491, making it the largest town in Dorset. It is situated on the English ...
and so, in 1965, D6580 was fitted with experimental push-pull apparatus, high-level brake pipes and jumper cables to make it compatible with Multiple Unit stock. Commencing 21 July 1965 tests were carried out between Wimbledon Park and Basingstoke and then, from 17 January 1966, on the Oxted Line, using a 6-coach rake of unpowered multiple unit coaches (designated TC, standing for Trailer Control). The use of this equipment removed the necessity for the locomotive to run around to the front of its train at each terminus, as it could be controlled from the driving position of a TC unit and hence could propel its train from the rear. Following successful completion of trials, D6580 and a further eighteen other members of the class (D6511, D6513, D6514, D6516, D6517, D6519, D6520, D6521, D6525, D6527, D6528, D6529, D6531, D6532, D6533, D6535, D6536 and D6538) entered
Eastleigh Works Eastleigh Works is a locomotive, carriage and wagon building and repair facility in the town of Eastleigh, in the county of Hampshire in England. History LSWR The London and South Western Railway (LSWR) opened a carriage and wagon works at E ...
, to be fitted with a modified version of the push-pull apparatus – fully compatible with Class 73 and Class 74 electro-diesels and indeed any electro-pneumatically controlled (EP) multiple unit stock. They emerged, painted in the new BR corporate blue with full yellow ends. D6521 had re-entered service by November 1966, so equipped, and by November 1967 the remainder had returned to traffic fitted for push-pull working. With the advent of TOPS, Class 34 was originally reserved for these modified locomotives - but it was not used and they were grouped, instead, into class 33/1 and the nineteen locomotives were renumbered, sequentially, in the range 33101–33119. They settled into sterling service, proving themselves highly useful and reliable. The prototype locomotive (D6580, later 33119) was the only member of Class 33 to run in green livery with the multiple unit control equipment – not to be confused with preserved members of Class 33/1 that have been repainted green.


Tramway safety

Allocated to work the Weymouth Harbour Tramway, trains operating over public thoroughfare tramway without escort are required to be fitted with warning equipment for the general public. Before its withdrawal, the Class 03 Weymouth pilot would regularly take fuel-oil tank wagons (for the ferries) and occasionally boat-train stock between Weymouth yard and ferry terminal. It had a bell and beacon fitted at both ends above the lower-centre headcode lamp (along with SR style high-level brake pipes) which served to warn thoroughfare users and was controlled from the cab. For main-line stock, two warning units were built and housed in a cabinet at the track side of the quay spur at the throat of the yard. This equipment comprised a yellow control box with amber rotating
beacon A beacon is an intentionally conspicuous device designed to attract attention to a specific location. A common example is the lighthouse, which draws attention to a fixed point that can be used to navigate around obstacles or into port. More mode ...
and bell which fitted on a bracket just above the rubbing plate on the cab front. Class 33/1 and all TC stock were equipped with this bracket and a socket where units plugged-in to draw power from the train systems. This was a specific complexity with the two types and in order to standardize and remove a maintenance risk, in the early 1980s, three battery-powered units were constructed which mounted on a standard lamp bracket with no need to draw power from the train. This allowed the power and control circuitry for warning units to be removed during (and thus simplifying) overhaul. The old power sockets were gradually removed and plated-over but some remained until withdrawal of the stock. These new units also enabled other types of stock to use the tramway. They were smaller, had an on/off switch on the rear of the unit and no bell – warnings being given using the train horn. Trains for the quay would halt at the station throat, and the warning equipment was attached and tested by the train guard. In addition, trains on the tramway were "walked" by railway staff with flags, clearing the route of people and badly parked cars all the way between the points at which the tramway reverted to conventional track at the quay station and road crossing into Weymouth yard. On arrival at the quay terminus the guard would move the warning equipment to the other end of the train in readiness for the return journey. In later years, (e.g. for Railtours) the local Police fulfilled the role of traffic control and the process of moving a train along the tramway became less routine.


Accidents and incidents

*At 02:02 on 8 December 1961, a freight train was setting back at station when the 00:20 goods from Hoo Junction to , hauled by D6506, overran signals and collided with it. The wreckage from the accident piled up under the bridge carrying the B2160 Maidstone Road. The line was blocked for 12 hours. D6506 was severely damaged. It arrived at
Eastleigh Works Eastleigh Works is a locomotive, carriage and wagon building and repair facility in the town of Eastleigh, in the county of Hampshire in England. History LSWR The London and South Western Railway (LSWR) opened a carriage and wagon works at E ...
for repair on 29 December. * On 23 March 1963, locomotive D6520 was hauling a freight that was derailed between and ,
Hampshire Hampshire (, ; abbreviated to Hants) is a ceremonial and non-metropolitan county in western South East England on the coast of the English Channel. Home to two major English cities on its south coast, Southampton and Portsmouth, Hampshire ...
. * On 5 March 1964, locomotive D6502 was hauling a freight train when it ran through signals at Itchingfield Junction, West Sussex and was in a rear-end collision with a freight train. Two people were killed. Damage was so extensive that the locomotive was cut up on site. * On 30 September 1966, locomotive D6535 was hauling a freight train that overran signals and was derailed by trap points at
Wallers Ash Wallers () is a commune in the Nord department in northern France. It is known for the Trench of Arenberg, part of the Paris–Roubaix cycling race, held annually in April. Heraldry Population See also *Communes of the Nord department T ...
, Hampshire. * On 16 October 1968, locomotive D6576 was involved in a collision with a locomotive at
Reading, Berkshire Reading ( ) is a town and borough in Berkshire, southeast England. Located in the Thames Valley at the confluence of the rivers Thames and Kennet, the Great Western Main Line railway and the M4 motorway serve the town. Reading is east ...
. Following recovery to
Eastleigh Works Eastleigh Works is a locomotive, carriage and wagon building and repair facility in the town of Eastleigh, in the county of Hampshire in England. History LSWR The London and South Western Railway (LSWR) opened a carriage and wagon works at E ...
and examination, it was considered uneconomical to repair. The locomotive was withdrawn in November 1968 and was cut up for spares in March 1969. * On 4 January 1969, locomotive No. D6558 was hauling a parcels train that was run into by a passenger train at ,
Kent Kent is a county in South East England and one of the home counties. It borders Greater London to the north-west, Surrey to the west and East Sussex to the south-west, and Essex to the north across the estuary of the River Thames; it faces ...
. * On 28 July 1971, locomotive No. 6561 was hauling a parcels train that was derailed at ,
Surrey Surrey () is a ceremonial county, ceremonial and non-metropolitan county, non-metropolitan counties of England, county in South East England, bordering Greater London to the south west. Surrey has a large rural area, and several significant ur ...
. * On 11 September 1975, locomotive No. 33041 was involved in a collision at Bricklayers Arms Junction and was consequently written off. * On 11 October 1977, locomotives No. 33036 and 33043 were hauling a freight train that was derailed at
Mottingham Mottingham is a district of south-east London, England, which straddles the border of both the London Borough of Bromley and the Royal Borough of Greenwich. It is located south of Eltham, southeast of Charing Cross. It is within the historic ...
, London. Due to damage sustained, 33036 was withdrawn from service and scrapped. * On 25 February 1979, locomotive No. 33115 was hauling a passenger train which was involved in a collision with an engineers' crane near
Hilsea Hilsea is a district of the city of Portsmouth in the English county of Hampshire. Hilsea is home to one of Portsmouth's main sports and leisure facilities – the Mountbatten centre. Trafalgar School (formerly the City of Portsmouth Boys' School ...
. One person was killed in the accident. 33115 was out of traffic until 1980. * On 26 January 1985, locomotive 33104 ran into the rear of a passenger train formed of
4VEP The British Rail Class 423 ( 4 VEP), electric multiple unit passenger trains were mostly built by British Rail (BR) at York Works from 1967 to 1974, although the MBSOs and TSOs of the first 20, 7701-7720, were built at Derby Works. They have ...
units 7754 & 7703 and 4CIG unit 7395 which had been halted by a landslip near
Popham, Hampshire Popham is a hamlet and civil parish south of Basingstoke, Hampshire, England. According to the Post Office the population of the 2011 Census was included in the civil parish of Dummer. The area was occupied from pre-historic times and was estab ...
. The crew of the passenger train had failed to protect the rear of their train, Twelve people were injured. The locomotive was written off. * On 24 March 1987, a freight train overran a signal at Frome North Junction,
Somerset ( en, All The People of Somerset) , locator_map = , coordinates = , region = South West England , established_date = Ancient , established_by = , preceded_by = , origin = , lord_lieutenant_office =Lord Lieutenant of Somerset , lor ...
. Locomotive No. 33032 was hauling a passenger train that was in a head-on collision with the freight train (hauled by 47202). Fifteen people were injured, but only the driver of the freight train seriously. 33032 was stored at Frome West stone terminal and on 4 June 1987 it was hauled back to
Eastleigh Works Eastleigh Works is a locomotive, carriage and wagon building and repair facility in the town of Eastleigh, in the county of Hampshire in England. History LSWR The London and South Western Railway (LSWR) opened a carriage and wagon works at E ...
, where it was later broken up. * On 20 April 1989 locomotive number 33107 collided with the rear of a freight train at Holton Heath, between Wareham and Hamworthy Junction, according to television news the driver of 33107 was killed as he jumped from the locomotive.


83301

In May 1991, locomotive 33115 was converted to a test locomotive in connection with the
Channel Tunnel The Channel Tunnel (french: Tunnel sous la Manche), also known as the Chunnel, is a railway tunnel that connects Folkestone (Kent, England, UK) with Coquelles ( Hauts-de-France, France) beneath the English Channel at the Strait of Dover ...
works. It was fitted with bogies that had third rail collection shoes. The locomotive was renumbered 83301. A test train formed of 83301, 73205 ''London Chamber of Commerce'', a Class 47/9 and
4TC The British Rail TC (Trailer Control) multiple units were unpowered fixed formations of 3 or 4 carriages with a driving position at each end of the set, converted by BR's Holgate Road carriage works from locomotive-hauled Mark 1 carriages in 19 ...
set 8007 were used between Waterloo and , and between
Stewarts Lane Stewarts Lane is a large railway-servicing facility in Battersea in London, England, founded by the London Chatham and Dover Railway (LCDR) in 1862, to serve London Victoria railway station. It is sited in the midst of a maze of railway lines ...
and . Two more carriages had been added to the train by that summer. 83301 was withdrawn in November 1994. It was stripped of parts and then scrapped in the summer of 1996.


Preservation

Twenty-nine locomotives have been preserved.


Model railways

Italian manufacturer Lima produced a Class 33, initially in HO gauge and
O gauge O scale (or O gauge) is a scale commonly used for toy trains and rail transport modelling. Introduced by German toy manufacturer Märklin around 1900, by the 1930s three-rail alternating current O gauge was the most common model railroad scal ...
and later in
OO gauge OO gauge or OO scale (also, 00 gauge and 00 scale) is the most popular standard-gauge model railway standard in the United Kingdom, outside of which it is virtually unknown. OO gauge is one of several 4 mm-scale standards (4 mm to 1 foot, ...
. In 2010
Hornby Railways Hornby Railways is a British model railways manufacturing company. Its roots date back to 1901 in Liverpool, when founder Frank Hornby received a patent for his Meccano construction toy. The first clockwork train was produced in 1920. In 1938, ...
started to sell the BR Class 33 in its Railroad range in BR Green in
OO gauge OO gauge or OO scale (also, 00 gauge and 00 scale) is the most popular standard-gauge model railway standard in the United Kingdom, outside of which it is virtually unknown. OO gauge is one of several 4 mm-scale standards (4 mm to 1 foot, ...
. This was based upon the earlier Lima model that Hornby acquired upon purchasing the liquidated assets of the Lima company in 2003. Heljan make various BR Class 33's in
OO gauge OO gauge or OO scale (also, 00 gauge and 00 scale) is the most popular standard-gauge model railway standard in the United Kingdom, outside of which it is virtually unknown. OO gauge is one of several 4 mm-scale standards (4 mm to 1 foot, ...
. Graham Farish (now part of the Bachmann company) produce a Class 33 in British N gauge (1/148 scale).


Notes


References

;Sources * * * * * * * * * * * * * * * * * *


Further reading

* * * * * * * * *


External links


71A Locomotive Group - Owners of D6515/33012



South East Locomotive Group – owners of 33063 & 33065

Cromptons – BR Class 33 Locomotives

Pioneer Diesel Group Owners of 33035
{{Authority control 33 Bo-Bo locomotives BRCW locomotives Railway locomotives introduced in 1960 Railway locomotives introduced in 1962 Railway locomotives introduced in 1965 Standard gauge locomotives of Great Britain Diesel-electric locomotives of Great Britain