Boeing 777-8X
   HOME

TheInfoList



OR:

The Boeing 777X is the latest series of the long-range,
wide-body A wide-body aircraft, also known as a twin-aisle aircraft, is an airliner with a fuselage wide enough to accommodate two passenger aisles with seven or more seats abreast. The typical fuselage diameter is . In the typical wide-body economy cabin ...
,
twin-engine A twinjet or twin-engine jet is a jet aircraft powered by two engines. A twinjet is able to fly well enough to land with a single working engine, making it safer than a single-engine aircraft in the event of failure of an engine. Fuel efficien ...
jetliners in the
Boeing 777 The Boeing 777, commonly referred to as the Triple Seven, is an American long-range wide-body airliner developed and manufactured by Boeing Commercial Airplanes. It is the world's largest twinjet. The 777 was designed to bridge the gap betw ...
family from Boeing Commercial Airplanes. The 777X features new GE9X engines, new
composite Composite or compositing may refer to: Materials * Composite material, a material that is made from several different substances ** Metal matrix composite, composed of metal and other parts ** Cermet, a composite of ceramic and metallic materials ...
wings with
folding wing A folding wing is a wing configuration design feature of aircraft to save space and is typical of carrier-based aircraft that operate from the limited deck space of aircraft carriers. The folding allows the aircraft to occupy less space in a con ...
tips, greater cabin width and seating capacity, and technologies from the
Boeing 787 The Boeing 787 Dreamliner is an American wide-body jet airliner developed and manufactured by Boeing Commercial Airplanes. After dropping its unconventional Sonic Cruiser project, Boeing announced the conventional 7E7 on January 29, 2003, ...
. The 777X was launched in November 2013 with two variants: the 777-8 and the 777-9. The 777-8 provides seating for 384 passengers and has a range of 8,730 nmi (16,170 km) while the 777-9 has seating for 426 passengers and a range of over 7,285 nmi (13,500 km). The 777X program was proposed in the early 2010s with assembly at the
Boeing Everett Factory The Boeing Everett Factory is an airplane assembly facility built by Boeing in Everett, Washington, United States. It sits at the northeast corner of Paine Field and includes the largest building in the world by volume at 13,385,378 m3 (472,37 ...
and the wings built at a new building adjacent to the Everett factory. , there are 341 total orders for the 777X passenger and freighter versions from eight identified customers and other buyers. The 777-9 first flew on January 25, 2020, with deliveries delayed multiple times and expected to commence in 2025.


Development


Initial design

In 2011, Boeing refined its response to the revamped
Airbus A350 XWB The Airbus A350 is a long-range, wide-body twin-engine jet airliner developed and produced by Airbus. The first A350 design proposed by Airbus in 2004, in response to the Boeing 787 Dreamliner, would have been a development of the A330 ...
with three 777X models, targeting a firm configuration in 2015, flying in late 2017 or 2018, and entering service by 2019. The 407–passenger 777-9X should stretch the 777-300ER by four frames to in length, for a
maximum take-off weight The maximum takeoff weight (MTOW) or maximum gross takeoff weight (MGTOW) or maximum takeoff mass (MTOM) of an aircraft is the maximum weight at which the pilot is allowed to attempt to take off, due to structural or other limits. The analogous ...
(MTOW) and powered by engines, targeting per-seat 21% better fuel burn and 16% better operating cost. The smaller 353-seat 777-8X was to stretch the 777-200ER by ten frames to , with a MTOW and turbofans to compete with the A350-900 with improvements over the -200ER like the 777-9X over the 777-300ER. A 8LX with the 9X MTOW would have a range. The current 777-200LR/300ER have a MTOW. A new
carbon-fiber-reinforced polymer Carbon fiber-reinforced polymers (American English), carbon-fibre-reinforced polymers (Commonwealth English), carbon-fiber-reinforced plastics, carbon-fiber reinforced-thermoplastic (CFRP, CRP, CFRTP), also known as carbon fiber, carbon compo ...
(CFRP) wing with a wingspan of with blended winglets, or up to with
raked wingtip Wingtip devices are intended to improve the efficiency of fixed-wing aircraft by reducing drag. Although there are several types of wing tip devices which function in different manners, their intended effect is always to reduce an aircraft' ...
provide for a 10% larger wing area. It would fall into ICAO aerodrome code F like the
747-8 The Boeing 747-8 is a wide-body airliner formerly developed by Boeing Commercial Airplanes, and the largest variant of the 747. After introducing the 747-400, Boeing considered larger 747 versions as alternatives to the proposed double-deck ...
and A380 but with folding wingtips it would stay within the code E like current 777s. Horizontal stabilizers would be extended.


Engine selection

The
General Electric GE90 The General Electric GE90 is a family of high-bypass turbofan aircraft engines built by GE Aviation for the Boeing 777, with thrust ratings from . It entered service with British Airways in November 1995. It is one of three options for the 777 ...
-115B of the earlier 777-200LR and -300ER variants has a 42:1
overall pressure ratio In aeronautical engineering, overall pressure ratio, or overall compression ratio, is the ratio of the stagnation pressure as measured at the front and rear of the compressor of a gas turbine engine. The terms ''compression ratio'' and ''pressure ...
and 23:1 compressor ratio.
Rolls-Royce Plc Rolls-Royce Holdings plc is a British multinational aerospace and defence company incorporated in February 2011. The company owns Rolls-Royce, a business established in 1904 which today designs, manufactures and distributes power systems for ...
proposed its RB3025 concept with a fan diameter, a 12:1
bypass ratio The bypass ratio (BPR) of a turbofan engine is the ratio between the mass flow rate of the bypass stream to the mass flow rate entering the core. A 10:1 bypass ratio, for example, means that 10 kg of air passes through the bypass duct for ev ...
, and a 62:1 overall pressure ratio, targeting a fuel burn of more than 10% lower than the GE90-115B and 15% lower than its
Trent 800 The Rolls-Royce Trent 800 is a high-bypass turbofan produced by Rolls-Royce plc, one of the engine options for the early Boeing 777 variants. Launched in September 1991, it first ran in September 1993, was granted EASA certification on 27 Jan ...
powering the 777; the RB3025 concept has a composite fan, a core derived from the
Trent 1000 The Rolls-Royce Trent 1000 is a high-bypass turbofan engine produced by Rolls-Royce plc, one of the two engine options for the Boeing 787 Dreamliner, competing with the General Electric GEnx. It first ran on 14 February 2006 and first flew on ...
, and advanced HP materials. Pratt & Whitney responded with the thrust
PW1000G The Pratt & Whitney PW1000G, also called the Geared Turbofan (GTF), is a high-bypass geared turbofan engine family produced by Pratt & Whitney. After many demonstrators, the program was launched with the Mitsubishi MRJ's PW1200G in March 2008, ...
geared turbofan architecture.
GE Aviation GE Aviation, a subsidiary of General Electric, is headquartered in Evendale, Ohio, outside Cincinnati. GE Aviation is among the top aircraft engine suppliers, and offers engines for the majority of commercial aircraft. GE Aviation is part of t ...
proposed the GE9X with a diameter fan, a 10:1 bypass ratio, a 60:1 overall pressure ratio, and 27:1 HP compressor ratio for a 10% fuel burn reduction. In March 2013, Boeing selected the GE9X with a fan. It is the largest fan made by GE. In the rest of 2013, thrust was bumped to to support the MTOW growing from and increasing the payload-range, with a possible envisioned. Some customers bemoan the loss of engine competition, like
Air Lease Corporation Air Lease Corporation (ALC) is an American aircraft leasing company founded in 2010 and headed by Steven F. Udvar-Házy. Air Lease purchases new commercial aircraft through direct orders from Boeing, Airbus, Embraer and ATR, and leases them to ...
's CEO Steven Udvar-Hazy who wanted a choice of engines. Airbus points out that handling more than one engine type adds millions of dollars to an airliner cost.
Pratt and Whitney Pratt & Whitney is an American aerospace manufacturer with global service operations. It is a subsidiary of Raytheon Technologies. Pratt & Whitney's aircraft engines are widely used in both civil aviation (especially airlines) and military av ...
said: "Engines are no longer commodities...the optimization of the engine and the aircraft becomes more relevant."


Launch

In 2012, with the
Boeing 737 MAX The Boeing 737 MAX is the fourth generation of the Boeing 737, a narrow-body airliner manufactured by Boeing Commercial Airplanes (BCA), a division of American company Boeing. It succeeds the Boeing 737 Next Generation (NG) and competes with ...
in development and the 787-10 launch in preparation, Boeing decided to slow 777X development to reduce the risk with introduction still forecast for 2019. On May 1, 2013, Boeing's board of directors approved selling the 353-seat 777-8LX to replace the 777-300ER from 2021, after the larger 406-seat -9X. The design work is distributed between Charleston, Huntsville, Long Beach, Philadelphia, St. Louis in the U.S and Moscow, Russia. Its
development Development or developing may refer to: Arts *Development hell, when a project is stuck in development *Filmmaking, development phase, including finance and budgeting *Development (music), the process thematic material is reshaped * Photograph ...
cost could be over $5 billion with at least $2 billion for the carbon-composite wing. On September 18, 2013, Lufthansa became its launch customer by selecting 34 Boeing 777-9X airliners, along with 25 Airbus A350-900s to replace its 22 747-400s and 48 A340-300/600s for its long-haul fleet. At the November 2013
Dubai Airshow The Dubai Airshow ( ar, معرض دبي للطيران) is a biennial air show held in Dubai, United Arab Emirates under the patronage of Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, in ...
, the -8X for 350 passengers over a range and the -9X, seating more than 400 over were launched with 259 orders and commitments for US$95 billion at list prices. This was the largest commercial aircraft launch by dollar value with
Emirates Emirates may refer to: * United Arab Emirates, a Middle Eastern country * Emirate, any territory ruled by an emir ** Gulf emirates, emirates located on the Persian Gulf ** Emirates of the United Arab Emirates, the individual emirates * The Emirat ...
ordering 150,
Qatar Airways Qatar Airways Company Q.C.S.C. ( ar, القطرية, ''al-Qaṭariya''), operating as Qatar Airways, is the state-owned flag carrier airline of Qatar. Headquartered in the Qatar Airways Tower in Doha, the airline operates a hub-and-spoke netwo ...
50, and Etihad Airways 25, in addition to the September 2013 Lufthansa commitment for 34 aircraft. Boeing dropped the variants' "X" suffix, while keeping the 777X program name at the 2015 Dubai Airshow. In June 2017, Lufthansa was considering delaying 777X deliveries and could limit its -9 orders to 20 and order more A350s. Due to its large order, Emirates will become the first operator instead of Lufthansa.


Production

In December 2014, Boeing began construction on a new composites facility in St. Louis to be completed in 2016, to build 777X parts with six
autoclave An autoclave is a machine used to carry out industrial and scientific processes requiring elevated temperature and pressure in relation to ambient pressure and/or temperature. Autoclaves are used before surgical procedures to perform sterilizati ...
s for the wing and
empennage The empennage ( or ), also known as the tail or tail assembly, is a structure at the rear of an aircraft that provides stability during flight, in a way similar to the feathers on an arrow.Crane, Dale: ''Dictionary of Aeronautical Terms, third e ...
parts, starting in 2017. The 787 'surge' line at the Everett factory would be converted into a 777X early production line by the end of 2015. Boeing built a new building adjacent to the Everett factory, with a autoclave, and a robot to wind fiber for the wings. The first 777X was planned to be built on the ex-787 "surge" line. The -9 firm-configuration was reached in August 2015 and assembly of the initial aircraft was to begin in 2017 for a December 2019 introduction advanced from the previously scheduled 2020. With a current 777 production rate of 100 per year, 380 on order at the end of 2013 and no orders at the February 2014
Singapore Airshow The Singapore Airshow is a biennial aerospace event held in Singapore, debuted in 2008. It hosts high-level government and military delegations, as well as senior corporate executives around the world, while serving as a global event for leadin ...
, bridging the gap to the 777X deliveries starting from 2020 is a challenge: to stimulate orders, sales of current 777s can be paired with 777Xs and used 777s can be converted to freighters to be sold and stimulate new sales.


2017

In April 2017, the initial one-piece
wing spar In a fixed-wing aircraft, the spar is often the main structural member of the wing, running spanwise at right angles (or thereabouts depending on wing sweep) to the fuselage. The spar carries flight loads and the weight of the wings while on t ...
came onto the assembly jig and was about to enter lay-up in June; first parts assembly for the initial -9, a static test airframe, were underway in the purpose-built wing center near
Everett, Washington Everett is the county seat and largest city of Snohomish County, Washington, United States. It is north of Seattle and is one of the main cities in the metropolitan area and the Puget Sound region. Everett is the seventh-largest city in the ...
. Four -9s, a fatigue-test airframe, and two -8s were planned for testing. Tests of
avionics Avionics (a blend of ''aviation'' and ''electronics'') are the electronic systems used on aircraft. Avionic systems include communications, navigation, the display and management of multiple systems, and the hundreds of systems that are fit ...
, power and integrated systems continue in
Boeing Field Boeing Field, officially King County International Airport , is a public airport owned and operated by King County, five miles south of downtown Seattle, Washington. The airport is sometimes referred to as KCIA (King County International Airp ...
laboratories and were integrated into an "Airplane Zero" in 2017 as 70% detailed design was done by June 2017. The assembly of the first composite wing test example began in Everett in late September 2017 with its top section lowered into a jig for robotic drilling. Boeing launched the 777-9 production on October 23 with the
wing spar In a fixed-wing aircraft, the spar is often the main structural member of the wing, running spanwise at right angles (or thereabouts depending on wing sweep) to the fuselage. The spar carries flight loads and the weight of the wings while on t ...
drilling; its
maiden flight The maiden flight, also known as first flight, of an aircraft is the first occasion on which it leaves the ground under its own power. The same term is also used for the first launch of rockets. The maiden flight of a new aircraft type is alw ...
was scheduled in the first quarter of 2019, one year before its introduction, perhaps with Emirates. On November 7, 90% of the engineering drawings were released, with the airframe before the systems: 99% of the wing and 98% of the fuselage drawings are released. The detailed design phase was expected to be completed in 2017 as avionics, power and other systems are ready for ground tests. Aircraft Numbers 1 and 6 were planned to be used for ground tests; four 777-9s (No. 2 to 5) were slated for the
flight test Flight testing is a branch of aeronautical engineering that develops specialist equipment required for testing aircraft behaviour and systems. Instrumentation systems are developed using proprietary transducers and data acquisition systems. D ...
and certification campaign, with two 777-8s to come later. Final assembly was planned to start in 2018 before roll-out the same year. The 777X production techniques were expected to be major cost-cutters. The Fuselage Automated Upright Build (FAUB) system was developed and quietly tested in
Anacortes, Washington Anacortes ( ) is a city in Skagit County, Washington, United States. The name "Anacortes" is an adaptation of the name of Anne Curtis Bowman, who was the wife of early Fidalgo Island settler Amos Bowman.automated production, it drills the tens of thousands of holes in the fuselage more quickly, accurately, and safely. The wings are the first produced by Boeing in composite and not out-sourced like for the 787, and production is largely
automated Automation describes a wide range of technologies that reduce human intervention in processes, namely by predetermining decision criteria, subprocess relationships, and related actions, as well as embodying those predeterminations in machines ...
as well. The specifically built billion-dollar factory has excess capacity, laying the foundation for the company's expected future programs: the New Midsize Airplane (NMA) and later the New Small Airplane to replace the 737.


2018

In February 2018, Subaru (ex–Fuji Heavy Industries) completed the first aluminum and titanium center
wingbox The wingbox of a fixed-wing aircraft refers to the primary load-carrying structure of the wing, which forms the structural centre of the wings and also the attachment point for other wing components such as leading edge flaps, trailing edge flaps ...
integrated with main landing gear wheel wells at its Handa factory. The factory was completed in April 2016 and started operation in 2017. It has of floor space and is equipped with automatic
riveter A rivet is a permanent mechanical fastener. Before being installed, a rivet consists of a smooth cylindrical shaft with a head on one end. The end opposite to the head is called the ''tail''. On installation, the rivet is placed in a punched o ...
s, transfer, and painting machines. Boeing's first composite wing spars, stringers, and skin panels are formed in the $1 billion Composite Wing Center before assembly on a new horizontal build line. In February 2018, its wing components were ready to go through assembly as
Mitsubishi Heavy Industries is a Japanese multinational engineering, electrical equipment and electronics corporation headquartered in Tokyo, Japan. MHI is one of the core companies of the Mitsubishi Group and its automobile division is the predecessor of Mitsubishi Mo ...
, the 787 composite wings manufacturer, advised Boeing on the wing assembly. At this time, 93–95% of the design was released: complete for structures and in progress for systems and engine installation before interiors. Fuselage subassemblies started shipping on February 7: aft fuselage panels from Mitsubishi Heavy Industries, center and forward fuselage panels from
Kawasaki Heavy Industries (or simply Kawasaki) is a Japanese public multinational corporation manufacturer of motorcycles, engines, heavy equipment, aerospace and defense equipment, rolling stock and ships, headquartered in Chūō, Kobe and Minato, Tokyo, Japan. It is ...
and the 11/45 center wingbox from Subaru. In March, fuselage assembly was to begin in Everett at a temporary production line between the current 747-8 and 777 assembly lines to avoid disrupting the 777-300ER production. The static airframe and the first flight-test aircraft bodies were to be joined in the second quarter of 2018 and in June–July, respectively. Scheduled for the start of 2018, the GE9X first flight has been delayed by the variable stator vane actuator arms redesign but the slip should not change the engine certification schedule or the first flight of the 777X. The flight-test engines were to be shipped later in 2018, before the year-end roll out and first flight expected in February 2019. During the new component development, two temporary engines were to be placed on the first flight-test aircraft. Wing assembly is difficult, with the light but strong carbon-fiber material being less forgiving than traditional aluminum, and aircraft systems integration in a special demonstration lab is not as quick as planned. The first 777-9 fuselage assembly started in March 2018. In May 2018, Qatar Airways head
Akbar Al Baker Akbar Al Baker ( ar, أكبر الباکر; born 1962) is the Group CEO of Qatar Airways and the Chairman of Qatar Tourism. under Qatar Airways Group, Al-Baker is also the CEO of Hamad International Airport, which opened in 2014. In May 2021, Al ...
thought development was a couple of months late but expects Boeing to catch up, provided no certification issues arise. To avoid disrupting current 777 assembly, a temporary low-rate
assembly line An assembly line is a manufacturing process (often called a ''progressive assembly'') in which parts (usually interchangeable parts) are added as the semi-finished assembly moves from workstation to workstation where the parts are added in se ...
was set up for up to 38 airframes before transitioning to the main FAL in the early 2020s. The first -9 roll-out is due in late 2018 and all four -9 prototypes are to join the flight tests by mid-2019, while the two -8 prototypes were to be assembled in 2020 before deliveries. The first wing was completed in May for static tests before the flight test wings. By July 2018, 98% of its engineering had been released. By September, the static test 777X article was completed, lacking engines and various systems, ahead of its structural testing on ground. The first join on the static-test aircraft was done in 16 days instead of the planned 20 and
lessons learned Lessons learned (American English) or lessons learnt (British English) are experiences distilled from past activities that should be actively taken into account in future actions and behaviors. There are several definitions of the concept. The ...
from the 787 wing-body join led to a single defect instead of hundreds usually in new models. The final body join of the first flight test aircraft was completed by November, before an early 2019 rollout and a second quarter first flight. By late 2019, it should be joined in the flight program by the other four 777-9 prototypes which were undergoing assembly. The first flight-test aircraft was built 20% faster than the static airframe. At the end of November, the
electric system Electricity is the set of physical phenomena associated with the presence and motion of matter that has a property of electric charge. Electricity is related to magnetism, both being part of the phenomenon of electromagnetism, as described ...
s were powered on and the rollout was expected for February 2019. First deliveries are planned for May 2020 while the first production
wing spar In a fixed-wing aircraft, the spar is often the main structural member of the wing, running spanwise at right angles (or thereabouts depending on wing sweep) to the fuselage. The spar carries flight loads and the weight of the wings while on t ...
was going to be loaded in early December. To position wings and fuselage sections, automated guided vehicles are replacing
overhead crane An overhead crane, commonly called a bridge crane, is a type of crane found in industrial environments. An overhead crane consists of two parallel rails seated on longitudinal I-beams attached to opposite steel columns by means of brackets. ...
s and "monuments" - large, permanent tooling fixtures. The primary systems were installed by December and its second GE9X engine were to be hung in early 2019.


2019

Engines were installed by early January 2019. The first 777-9 body join happened in February for a delivery planned in summer 2020 to Lufthansa. The roll-out of the prototype occurred on March 13, 2019, in a low-key employees-only event overshadowed by the crash of an Ethiopian Airlines 737 MAX 8 on March 10. The GE9X engines installed on the 777X prototype were first run on May 29. However, a compressor anomaly occurred with another engine during pre-delivery tests, and the maiden flight previously planned for no earlier than June 26 was delayed while the engines are modified to a final certifiable configuration. , GE expressed confidence that the engine would receive certification during the fall and that the first flight of the 777X would still occur in 2019. The 777X test plan was later revised as several months are required to develop and test fixes to the GE9X, and first flight slipped to October–November. By June, the first prototype began low-speed taxi tests. On July 24, Boeing announced that the GE9X engine issue would delay the maiden flight until 2020. The company continued to target first deliveries in 2020, though it intends to boost production of current-generation 777 freighters in 2020. GE Aviation in Ohio is recalling four GE9X turbofans from Boeing in Washington state in
Antonov An-124 The Antonov An-124 Ruslan (; russian: Антонов Ан-124 Руслан, , Ruslan; NATO reporting name: Condor) is a large, strategic airlift, four-engined aircraft that was designed in the 1980s by the Antonov design bureau in the Ukrain ...
freighters from
Volga-Dnepr Airlines Volga-Dnepr Airlines, LLC (russian: ООО «Авиакомпания «Волга-Днепр») is an airline based in Ulyanovsk, Russia. It specializes in providing air charter services by operating a unique fleet of twelve Antonov An-124 (lar ...
, mounted in 26 x 14 x 13 ft (8 x 4 x 4 m), 36,000 lb (16.3 t) stands. On September 5, in the presence of FAA inspectors, a cargo door blew off on the 777X static test airframe during the ultimate load test, which is conducted with the airplane stressed and pressurized beyond normal operating limits. Depending on the outcome of its root cause investigation, Boeing should have time to modify the failed part and repeat the test during the margin from the existing engine-related delays. At 99% of ultimate load, 1.48 times the limit load, the
aluminum Aluminium (aluminum in American and Canadian English) is a chemical element with the symbol Al and atomic number 13. Aluminium has a density lower than those of other common metals, at approximately one third that of steel. It ha ...
skin ruptured under the center fuselage, aft of the wing, and the damaged structure extended up the fuselage side to a passenger
plug door A plug door is a door designed to seal itself by taking advantage of pressure difference on its two sides and is typically used on aircraft with cabin pressurization. The higher pressure on one side forces the usually wedge-shaped door into its ...
which blew out − and not an outward-hinged cargo door. In October 2019, the JATR board created to review the
Boeing 737 MAX certification The Boeing 737 MAX was initially certified in 2017 by the U.S. Federal Aviation Administration (FAA) and the European Union Aviation Safety Agency (EASA). Global regulators grounded the plane in 2019 following fatal crashes of Lion Air Flight ...
noted that the FAA would need to assess more thoroughly how modifications interact with the aircraft. The FAA did not announce how its review and certification of the 777X may be affected. The 777X was already a year behind schedule as service introduction was targeted for 2022, a further delay due to the certification as a derivative could risk key orders. Boeing received the first flight compliant GE9X on October 18 with a second engine due by the end of the month, for a mid-November power up. On November 13, the FAUB robotic system was abandoned after six years of implementation, to use human machinists more. By mid-November, a pair of flight compliant engines were installed on the first 777-9.


2020

As part of an investigation by the FAA into the fatal crashes of the Boeing 737 MAX aircraft, emails were released that showed that a problematic supplier of parts for the 737 MAX flight simulators was still being used for 777X simulators, on an even more aggressive schedule. Boeing stated that the 777X does not have an equivalent of the
Maneuvering Characteristics Augmentation System The Maneuvering Characteristics Augmentation System (MCAS) is a flight stabilizing feature developed by Boeing that became notorious for its role in two fatal accidents of the 737 MAX, which killed all 346 passengers and crew among both flight ...
(MCAS) that is installed on the 737 MAX and that played a role in two crashes.


Testing

The first test flight took place on January 25, 2020, at 10:09 a.m. from
Paine Field Paine Field , also known as Snohomish County Airport, is a commercial and general aviation airport serving the Seattle metropolitan area in the U.S. state of Washington. It is located in unincorporated Snohomish County, Washington, between the ...
in Everett, and ended in
Boeing Field Boeing Field, officially King County International Airport , is a public airport owned and operated by King County, five miles south of downtown Seattle, Washington. The airport is sometimes referred to as KCIA (King County International Airp ...
in Seattle after 3 hours and 52 minutes. The second 777X first flew on April 30, by which point the first had explored the
flight envelope In aerodynamics, the flight envelope, service envelope, or performance envelope of an aircraft or spacecraft refers to the capabilities of a design in terms of airspeed and load factor or atmospheric density, often simplified to altitude. The t ...
for nearly 100 hours.


2021

In January 2021, Boeing expected to add two more 777-9s to the test program, aiming for certification in 2021. After the first delivery was pushed back from 2021 to 2022, the third aircraft made its maiden flight on August 3; it is slated for avionics systems, APU, flight loads and propulsion performance tests. In early 2021, first delivery was pushed to late 2023. The delay was due to updated
type certification A type certificate signifies the airworthiness of a particular category of aircraft, according to its manufacturing design (''type design''). It confirms that the aircraft of a new type intended for serial production, is in compliance with applic ...
requirements and the
impact of the COVID-19 pandemic on aviation The COVID-19 pandemic has had a significant impact on the airline industry due to travel restrictions and a decimation in demand among travelers. Significant reductions in passenger numbers have resulted in flights being cancelled or planes ...
, costing a $6.5 billion charge. On June 27, 2021,
The Seattle Times ''The Seattle Times'' is a daily newspaper serving Seattle, Washington, United States. It was founded in 1891 and has been owned by the Blethen family since 1896. ''The Seattle Times'' has the largest circulation of any newspaper in Washington ...
reported on an FAA letter to Boeing dated May 13 delaying type certification until mid to late 2023, pushing deliveries to 2024. The FAA cited a serious test flight incident involving an "uncommanded pitch event" and a lack of "design maturity".


2022

In April 2022, Boeing again delayed 777X deliveries, this time to 2025. In 2012, the 777X was planned to enter service in 2019. In November 2022, it was revealed that a GE9X engine on one of the four test 777-9s suffered a technical issue on October 6. Boeing subsequently paused the test program while GE investigated the issue.


Design


Wing

The 777X has a new longer composite wing with folding wingtips. Due to this, the 777x is the first aircraft to have 'Wingtip Controls' inside the cockpit. Based on the 787 wing but with less
sweep Sweep or swept may refer to: Cleaning * Sweep, the action of using a brush to clean * Chimney sweep, a worker who clears ash and soot from chimneys * Street sweeper, a person's occupation, or a machine that cleans streets * Swept quartz, a cleani ...
, the new wing has a higher
lift-to-drag ratio In aerodynamics, the lift-to-drag ratio (or L/D ratio) is the lift generated by an aerodynamic body such as an aerofoil or aircraft, divided by the aerodynamic drag caused by moving through air. It describes the aerodynamic efficiency under gi ...
, aspect ratio increased from 9:1 to 10:1, area increased from , and usable fuel capacity increased from . To stay within the size category of the current 777 with a less than wingspan, it features folding
wingtip A wing tip (or wingtip) is the part of the wing that is most distant from the fuselage of a fixed-wing aircraft. Because the wing tip shape influences the size and drag of the wingtip vortices, tip design has produced a diversity of sha ...
s with the folding wingtip actuation system made by
Liebherr Aerospace Liebherr-Aerospace is the aerospace equipment manufacturing division of Liebherr. The company is an original equipment manufacturer (OEM); its low visibility in the minds of end consumers can be attributed to the OEM nature of all its operatio ...
. The mechanism was demonstrated for ''Aviation Week'' at the
Boeing Everett Factory The Boeing Everett Factory is an airplane assembly facility built by Boeing in Everett, Washington, United States. It sits at the northeast corner of Paine Field and includes the largest building in the world by volume at 13,385,378 m3 (472,37 ...
in October 2016; the folding movement should be complete in 20 seconds and be locked in place at the end. Specific alerts and procedures are needed to handle a malfunction. As existing regulations do not cover the folding wingtips, the
FAA The Federal Aviation Administration (FAA) is the largest transportation agency of the U.S. government and regulates all aspects of civil aviation in the country as well as over surrounding international waters. Its powers include air traffic m ...
issued special conditions, including proving their load-carrying limits, demonstrating their
handling qualities Flying qualities is one of the three principal regimes in the science of flight test, which also includes performance and systems. Flying qualities involves the study and evaluation of the stability and control characteristics of an aircraft. They h ...
in a
crosswind A crosswind is any wind that has a perpendicular component to the line or direction of travel. This affects the aerodynamics of many forms of transport. Moving non-parallel to the wind's direction creates a crosswind component on the object and th ...
when raised, alerting the crew when they are not correctly positioned while the mechanism and controls will be further inspected. Those ten special conditions were to be published on May 18, 2018, covering
worst-case scenario A worst-case scenario is a concept in risk management wherein the planner, in planning for potential disasters, considers the most severe possible outcome that can reasonably be projected to occur in a given situation. Conceiving of worst-case s ...
s. Transported by sea from Subaru in Nagoya to Everett, the center wing-box is similar in size to the legacy 777 but is more reinforced and heavier, with more
titanium Titanium is a chemical element with the Symbol (chemistry), symbol Ti and atomic number 22. Found in nature only as an oxide, it can be reduced to produce a lustrous transition metal with a silver color, low density, and high strength, resista ...
.


Interior

The internal cabin width is increased from the previous 777 models' through thinner interior cabin walls and better insulation to allow wide seats in 10-abreast economy. The 777X will feature cabin design details requiring structural changes that were originally introduced on the
Boeing 787 Dreamliner The Boeing 787 Dreamliner is an American wide-body jet airliner developed and manufactured by Boeing Commercial Airplanes. After dropping its unconventional Sonic Cruiser project, Boeing announced the conventional 7E7 on January 29, 2003, ...
: larger windows, higher ceilings, more humidity and lowered cabin altitude to . Its flight deck is similar to the 787 cockpit with large displays and
head-up display A head-up display, or heads-up display, also known as a HUD (), is any transparent display that presents data without requiring users to look away from their usual viewpoints. The origin of the name stems from a pilot being able to view informa ...
s, controls for the new folding wingtips, and
touchscreen A touchscreen or touch screen is the assembly of both an input ('touch panel') and output ('display') device. The touch panel is normally layered on the top of an electronic visual display of an information processing system. The display is ofte ...
s replacing cursor control devices. Windows are dimmable.


Efficiency

For the longer 777-9, new engines should improve
fuel consumption A fuel is any material that can be made to react with other substances so that it releases energy as thermal energy or to be used for work. The concept was originally applied solely to those materials capable of releasing chemical energy but ...
by 10%, with the longer, carbon-fiber wings adding an estimated 7% improvement. As 4 to 5% of fuel savings is lost from the 12 tons heavier
basic structure The basic structure doctrine is a common law legal doctrine that the constitution of a sovereign state has certain characteristics that cannot be erased by its legislature. The doctrine is recognised in India, Bangladesh, Malaysia, Pakistan, and ...
of the larger airliner, the net fuel efficiency gain is projected to be 12 to 13%. Ten-abreast seating instead of nine with a longer fuselage enable a reduction in fuel burn per seat of 20% compared to the 365-seat 777-300ER. The longer-range, 355-seat 777-8 should have a 13% improvement in fuel consumption with 10 fewer seats than the -300ER. Boeing forecast a 33% better cost per seat than the 747-400 and 13% better than the 777-300ER. Its
maximum takeoff weight The maximum takeoff weight (MTOW) or maximum gross takeoff weight (MGTOW) or maximum takeoff mass (MTOM) of an aircraft is the maximum weight at which the pilot is allowed to attempt to take off, due to structural or other limits. The analogous ...
is targeted for like the 777-300ER but Boeing hopes to have at least a margin at introduction. Boeing predicts the -8 to be 4% more fuel efficient and cost effective than the A350-1000, while the -9 would be 12% more fuel efficient and 11% more cost effective. Lufthansa, when it ordered both, stated the Airbus A350-900 and the 777-9X will consume an average of 2.9 L/100 km per passenger.


Variants


777-8

The 777-8 is a shortened derivative of the 777-9, long, between the 777-200 and 777-300. It would seat typically 384 passengers with a range of 8,730 nmi (16,170 km). It would succeed the ultra-long-range -200LR and compete with the Airbus A350-1000. Production of the -8 was expected to follow the -9 around two years later. It could be the basis of a freighter version which could be available 18 to 24 months after the introduction of the -8. The 777-8 should feature a higher
MTOW The maximum takeoff weight (MTOW) or maximum gross takeoff weight (MGTOW) or maximum takeoff mass (MTOM) of an aircraft is the maximum weight at which the pilot is allowed to attempt to take off, due to structural or other limits. The analogous ...
over the lb of the 777-9, for an improved range from . Due to the
Boeing 737 MAX groundings The Boeing 737 MAX passenger airliner was grounded worldwide between March 2019 and December 2020longer in many jurisdictionsafter 346 people died in two crashes: Lion Air Flight 610 on October 29, 2018 and Ethiopian Airlines Flight 302 on Ma ...
and the delayed first flight of the 777-9, in 2019 Boeing pushed back design and development of the 777-8 until at least 2021, for first deliveries in 2023 or beyond. The delays were not expected to affect Boeing's participation in Qantas' Project Sunrise, for which it has proposed a 777-8 variant. Boeing also proposed an interim solution to Qantas, assumed to comprise a 777-9 with auxiliary fuel tanks and reduced seating capacity. However, Qantas subsequently preferred the Airbus A350-1000 for this project. The -8 would also fill the niche market for an aircraft capable of flying with a full payload from hubs in the Gulf states to the
West Coast of the United States The West Coast of the United States, also known as the Pacific Coast, Pacific states, and the western seaboard, is the coastline along which the Western United States meets the North Pacific Ocean. The term typically refers to the contiguous U.S ...
. It could, however, be permanently cancelled if customers find the -9 acceptable for these routes.


777-9

The 777-9 is stretched by three extra seat rows and flies farther than the
777-300ER The Boeing 777, commonly referred to as the Triple Seven, is an American long-range wide-body airliner developed and manufactured by Boeing Commercial Airplanes. It is the world's largest twinjet. The 777 was designed to bridge the gap betw ...
with the same weight. It is longer than the -300ER for a length. It will seat typically 426 passengers over a range of 7,285 nmi (13,500 km). Boeing froze its design in August 2015 and was to start first assembly in 2017. Its
operating empty weight Empty weight (EW) is the sum of the ‘as built’ manufacturer's empty weight (MEW), plus any standard items (SI) plus any operator items (OI), EW = MEW + SI + OI. The EW is calculated for each aircraft series and each unique configuration of an ...
grew from the 777-300ER's , just over, for the -9 target. Listed at $442 million, valuation specialist Avitas estimates the -9 real purchase price at around $200 million. In 2014, Aspire Aviation estimated its manufacturer empty weight at for its operating empty weight with 300 seats in four classes. In 2017, crowd-sourced stock advising website
Seeking Alpha Seeking Alpha is a crowd-sourced content service for financial markets. Articles and research covers a broad range of stocks, asset classes, exchange-traded funds (ETFs), and investment strategies. Unlike other equity research platforms, insight ...
estimated a manufacturer empty weight and a operating empty weight. The first flight of the 777-9 was on Saturday, January 25, 2020. The 777-9 is to supersede the
Boeing 747-8 The Boeing 747-8 is a wide-body airliner formerly developed by Boeing Commercial Airplanes, and the largest variant of the 747. After introducing the 747-400, Boeing considered larger 747 versions as alternatives to the proposed double-deck Ai ...
as the longest airliner.


777-10X

Boeing is proposing to stretch the -9 by four rows of seats to accommodate 450 passengers in a 777-10X variant to compete with the Airbus A380 superjumbo. The company has approached several airlines including Emirates, the largest operator of both the 777 and the A380. The A380 seats between 489 and 615 passengers. The potential long 777-10X ( more) is competing against a hypothetical stretch of the A350-1000 for
Singapore Airlines Singapore Airlines ( abbreviation: SIA) is the flag carrier airline of the Republic of Singapore with its hub located at Singapore Changi Airport. The airline is notable for highlighting the Singapore Girl as its central figure in corporat ...
. Boeing confirmed that the stretch is feasible if there is interest. The A380 ended production in December 2021.


BBJ 777X

On December 10, 2018, Boeing launched Boeing Business Jet variants at the
Middle East Business Aviation Association Middle East Business Aviation Association or MEBAA, is a non-profit corporation based in Dubai, United Arab Emirates The United Arab Emirates (UAE; ar, اَلْإِمَارَات الْعَرَبِيَة الْمُتَحِدَة ), or simp ...
Show. The BBJ 777-8 offers a range of 11,645 nautical miles (21,570 km) and a 3,256 sq ft (302.5 sq m) cabin, while the BBJ 777-9 provides a 3,689 sq ft (342.7 sq m) cabin and a range of 11,000 nautical miles (20,370 km).


Freighter

In June 2019, Qatar Airways urged Boeing to develop a 777X-based freighter to replace its existing 777Fs which were first delivered in 2009. Boeing confirmed that discussions were under way to define a timeline for a freighter variant. The freighter is expected to be based on the 777-8 airframe. In July 2021, Boeing CEO David Calhoun viewed a freighter version as a logical next aircraft program to comply with emerging ICAO aircraft emission standards, though the airframer has not yet planned or launched the variant. On January 31, 2022, Boeing officially launched the 777X Freighter, with an order from
Qatar Airways Qatar Airways Company Q.C.S.C. ( ar, القطرية, ''al-Qaṭariya''), operating as Qatar Airways, is the state-owned flag carrier airline of Qatar. Headquartered in the Qatar Airways Tower in Doha, the airline operates a hub-and-spoke netwo ...
for 34 aircraft and 16 options with deliveries expected to begin in 2027.


Orders


Order history

On September 19, 2013, Lufthansa became the first airline to select the 777X when it placed an order for 34 777-9 airliners, but the order was later changed to 20 firm orders and 14 options. This was followed in May 2022 with an announcement for an order of seven 777-8 Freighters destined for
Lufthansa Cargo Lufthansa Cargo AG is a German cargo airline and a wholly owned subsidiary of Lufthansa. It operates worldwide air freight and logistics services and is headquartered at Frankfurt Airport, the main hub of Lufthansa. Besides operating dedicated ...
operations. In December 2013, Hong Kong-based Cathay Pacific ordered 21 777-9 airliners with deliveries expected from 2021, they will now not join Cathay's fleet before 2025. In July 2014, Emirates, the launch customer, finalized its order for 150 777X aircraft, consisting of 115 777-9s and 35 777-8s. On July 16, Qatar Airways finalized its order for 50 777-9 aircraft, with purchase rights for 50 more 777-9s. On July 31, Japan's
All Nippon Airways , also known as ANA (''Ē-enu-ē'') or is an airline in Japan. Its headquarters are located in Shiodome City Center in the Shiodome area of Minato ward of Tokyo. It operates services to both domestic and international destinations and had m ...
finalized an order for 20 Boeing 777-9s. In December 2016,
Iran Air The National Airline of Iran ( fa, هواپیمايی ملی ایران, Havâpeymâyi-ye Melli-ye Irân), branded as Iran Air, is the flag carrier of Iran, which is headquartered at Mehrabad Airport in Tehran. As of 2018, it operates schedule ...
signed an agreement with Boeing that includes 15 777-9 aircraft, but this agreement was effectively cancelled when the United States withdrew from the
Iran Nuclear Deal The Joint Comprehensive Plan of Action (JCPOA; fa, برنامه جامع اقدام مشترک , barnāmeye jāme'e eqdāme moshtarak (, ''BARJAM'')), commonly known as the Iran nuclear deal or Iran deal, is an agreement on the Iranian nuclear ...
in May 2018. In February 2017, Singapore Airlines signed a letter of intent with Boeing for 20 777-9 and 19 787-10 airliners; this was firmed in June 2017. In June 2017, the three
Persian Gulf The Persian Gulf ( fa, خلیج فارس, translit=xalij-e fârs, lit=Gulf of Fars, ), sometimes called the ( ar, اَلْخَلِيْجُ ٱلْعَرَبِيُّ, Al-Khalīj al-ˁArabī), is a mediterranean sea in Western Asia. The bod ...
carriers (Emirates, Etihad Airways and Qatar Airways) held 235 orders, % of the 340 commitments, which were less financially secure than previously. Etihad's widespread investing strategy had backfired as it reduced feed sources, making it harder to fill the orders for the 777X. Emirates' demand had been slowing and it was considering deferral of deliveries, having the smallest sovereign wealth fund backing of the Gulf carriers. Qatar Airways was facing economic concerns and was suffering from a diplomatic crisis with its neighbors. After a nearly $2 billion loss in 2016, Etihad had to cut routes and shrink its fleet and thus is considering canceling or deferring its orders, preferring to incur cancellations penalties rather than recurring losses from
overcapacity Capacity utilization or capacity utilisation is the extent to which a firm or nation employs its installed productive capacity. It is the relationship between output that ''is'' produced with the installed equipment, and the potential output whi ...
. On February 14, 2019, it was reported that Etihad would take only 6 of the 25 777X airliners it had originally ordered. On February 28, 2019,
British Airways British Airways (BA) is the flag carrier airline of the United Kingdom. It is headquartered in London, England, near its main hub at Heathrow Airport. The airline is the second largest UK-based carrier, based on fleet size and passengers ...
parent
International Airlines Group International Consolidated Airlines Group S.A., trading as International Airlines Group and usually shortened to IAG, is an Anglo-Spanish multinational airline holding company with its registered office in Madrid, Spain, and its global headq ...
ordered up to 42 777-9, 18 firm and 24 options, valued at up to $18.6 billion, to replace its 747-400s. On November 7, Lufthansa stated it had converted 14 orders into options, leaving 6 firm commitments, after having negotiated a change as part of its order for 20 787s. On November 20, Emirates reduced its order total to 115 in exchange for ordering 30 Boeing 787-9s, while remaining the largest 777X customer. In January 2021, Boeing reduced its sales expectation for the program from 400 to 350 aircraft. Boeing reclassified 118 orders from firm to uncertain under the ASC 606 accounting rule, for 191 orders down from 309 previously. On February 9, Singapore Airlines announced that they had converted an order for 14 Boeing 787-10 Dreamliners into 11 Boeing 777-9s; bringing its order for the 777-9 to 31. On January 31, 2022, Qatar Airways became the launch customer for the 777X Freighter program, with an order of up to 50 777-8 Freighters, expanding its commitment to the Boeing 777X family. In March 2022,
Ethiopian Airlines Ethiopian Airlines (commonly referred to as Ethiopian; am, የኢትዮጵያ አየር መንገድ, translit=Ye-Ītyōṗṗyā āyer menged), formerly ''Ethiopian Air Lines'' (EAL), is the flag carrier of Ethiopia, and is wholly owned by ...
signed a memorandum of understanding for five 777X Freighters.


Order summary

''Data ''


Specifications


See also


Notes


References


Further reading

* * * or * * * * * * * * * * * * * * *


External links

* {{Boeing 7x7 timeline
777X The Boeing 777X is the latest series of the long-range, wide-body, twin-engine jetliners in the Boeing 777 family from Boeing Commercial Airplanes. The 777X features new GE9X engines, new composite wings with folding wingtips, greater cabin w ...
Boeing 777 Twinjets Proposed aircraft of the United States Aircraft first flown in 2020