Barbara and Jack Davis Hall
   HOME

TheInfoList



OR:

Officially opened on May 10, 2012, as a part of University at Buffalo's 2020 Strategic Plan, construction of Barbara and Jack Davis Hall, known as Davis Hall, started in 2009 with ground-breaking and finished in late 2011 with a construction cost of $75 million including nearly $49.6 million from
New York State New York, officially the State of New York, is a state in the Northeastern United States. It is often called New York State to distinguish it from its largest city, New York City. With a total area of , New York is the 27th-largest U.S. sta ...
funding and the rest from corporate and individual endowments. Besides UB Engineering, Davis Hall is the new host to both Computer Science and Electrical Engineering departments featuring several new laboratories and research centers. The building is constructed by Turner Construction and its exterior design is a reminiscent to printed circuit board representing interaction among faculties and students and is designed by
Perkins and Will Perkins&Will is a global design practice founded in 1935. Since 1986, the group has been a subsidiary of Lebanon-based Dar Al-Handasah (Arabic: دار الهندسة). Phil Harrison has been the firm's CEO since 2006. History The firm was establ ...
firm. The building is constructed in accordance with
LEED Leadership in Energy and Environmental Design (LEED) is a green building certification program used worldwide. Developed by the non-profit U.S. Green Building Council (USGBC), it includes a set of rating systems for the design, construction ...
's Gold certificate standards.


Naming

The building is named after industrialist-turned-political candidate Jack Davis and his wife Barbara, who made the largest endowment ($5 million) among individuals to fund the project. The couple made their first donation of $1.5 million to fund the project in 2008. Jack, a UB Engineering graduate in 1955, and his wife donated an additional $3.5 million to the project making themselves the people who have made the largest endowment in university's history with $5 million endowment.


Tenants


Departments

The building is the new home to Computer Science and Electrical Engineering departments. However, the building supports five other departments such as Mechanical and Aerospace Engineering, Biomedical Engineering, Civil, Structural and Environmental Engineering, Industrial and Systems Engineering and Chemical and Biological Engineering.


Labs


Notable features


Facilities and research centers

* of Cleanroom space * Two 3D Electrical Engineering Labs * A smart room * A surgery lab * A multimedia lab * A security lab * Two visualization labs * Eleven flexible, multi-purpose labs * Center of Excellence for Document Analysis and Recognition (CEDAR) * Center for Unified Biometrics and Sensors (CUBS)Center for Unified Biometrics and Sensors (CUBS)
/ref>


LEED gold certificate

On April 4, 2012 it was announced that the building has been certified "Gold" by
LEED Leadership in Energy and Environmental Design (LEED) is a green building certification program used worldwide. Developed by the non-profit U.S. Green Building Council (USGBC), it includes a set of rating systems for the design, construction ...
. The building exceeds the state's energy efficiency code by 34 percent. Some of its features, making the building green, are as follow: * An outdoor plaza that includes water-efficient landscaping and methods to capture stormwater * A small green roof * Waterless urinals * Bicycle racks * Constructed with recycled building materials * Energy-efficient heating, cooling and ventilation systems


References

{{University at Buffalo, The State University of New York University at Buffalo University and college buildings completed in 2011 University and college academic buildings in the United States Leadership in Energy and Environmental Design gold certified buildings 2011 establishments in New York (state)