Auckland Airport Line
   HOME

TheInfoList



OR:

The Auckland Airport Line was a proposed heavy rail line in Auckland, New Zealand, that would have linked
Auckland Airport Auckland Airport is the largest and busiest airport in New Zealand, with over 21 million passengers in the year ended March 2019. The airport is located near Māngere, a residential suburb, and Airport Oaks, a service hub suburb south of th ...
with the Auckland central business district via central isthmus suburbs. As of 2022, the plan is to implement the connection via a new light rail line.


History

The main barrier to a rail link was the crossing of the
Manukau Harbour The Manukau Harbour is the second largest natural harbour in New Zealand by area. It is located to the southwest of the Auckland isthmus, and opens out into the Tasman Sea. Geography The harbour mouth is between the northern head ("Burne ...
between
Onehunga Onehunga is a suburb of Auckland in New Zealand and the location of the Port of Onehunga, the city's small port on the Manukau Harbour. It is south of the city centre, close to the volcanic cone of Maungakiekie / One Tree Hill. Onehunga is a ...
and the suburb Māngere Bridge.
Transit New Zealand Transit New Zealand (Māori: Ararau Aotearoa), which existed from 1989 to 2008, was the New Zealand Crown entity responsible for operating and planning the New Zealand state highway network (10,894 km, about 12% of New Zealand's roads). It ...
announced in 2007 that a new motorway bridge duplicating, and alongside, the existing 1983 Māngere Bridge would be designed to accommodate a rail link. In September 2007, Auckland Regional Transport Authority announced that it was willing to pay Transit $2.5 million to "future-proof" the duplication of the bridge in order "to accommodate a passenger rail connection". The duplication of the bridge was completed in 2010. The new bridge can technically accommodate a rail link, however this is a curved, single-track alignment with a design speed of 20 km/h. The successor to Transit New Zealand,
NZ Transport Agency Waka Kotahi NZ Transport Agency (commonly known as Waka Kotahi, and abbreviated as NZTA) is a New Zealand Crown entity tasked with promoting safe and functional transport by land, including the responsibility for driver and vehicle licensing, an ...
, provided for a rail corridor near the motorway as far as Walmsley Road. The proposed heavy rail line was the most popular with the public of the three Auckland rail proposals of Mayor
Len Brown Leonard Charles Brown (born 1 October 1956)) is a former mayor of Auckland, New Zealand, and former head of the Auckland Council. He won the 2010 Auckland mayoral election on 9 October 2010 and was sworn in as Mayor of Auckland on 1 Novembe ...
, although the number of trains would be limited without the City Rail Link to
Britomart Transport Centre Britomart Transport Centre, also known as Britomart railway station, is the public transport hub in the central business district of Auckland and the northern terminus of the North Island Main Trunk railway line. It combines a railway station ...
. Brown had promised a rail link to the Airport during his 2010 election campaign as part of a package of measures to double public transport patronage within 15 years. The official name for the airport link in the Long-term Plan 2012–2022 is the ''South Western Airport Multi Modal Corridor Project''. The Airport rail link planning study commenced in 2010. The Auckland Airport company asked for a decision by mid-2016 whether a rail or bus station would be needed at the airport, as it was planning a new domestic terminal, with construction to start in 2021. Escalating costs (estimated at $1.63b) for the heavy rail line to the Airport prompted some to raise the possibility of the route being served by light rail between Onehunga and the airport as an alternative to heavy rail. This option would make use of existing infrastructure where possible to reduce expenses and would involve an interchange with the existing heavy rail services at Onehunga. The line was initially conceived as an extension of the
Onehunga Branch The Onehunga Branch railway line is a section of the Onehunga Line in Auckland, New Zealand. It was constructed by the Auckland Provincial Government and opened from Penrose to Onehunga on 24 December 1873, and extended to Onehunga Wharf ...
line over the Māngere Bridge and via the suburbs of Māngere Bridge and
Māngere Māngere () or Mangere is one of the largest suburbs in Auckland, in northern New Zealand. It is located on mainly flat land on the northeastern shore of the Manukau Harbour, to the northwest of Manukau City Centre and 15 kilometres south of ...
. However the 2016 study identified this as an expensive option: *the need to double-track the branch line for high train frequencies *the high cost of grade-separating and closing level crossings on the branch line versus the less expensive but much less safe option of no grade-separation with barriers and pedestrian gates *the extent of viaducts and tunnelling required for an underground terminus under the airport terminal, with a decision needing to be made in time for the airport to begin construction of a new domestic terminal These made an extension of Auckland's heavy rail network an expensive option. This heavy rail option would add three new stations (at Māngere Bridge, Māngere and the airport terminal) and require airport trains to run via the already-congested tracks and junctions of the inner Southern Line. The heavy rail option would result in a journey time of 39 minutes from the airport to
Britomart Transport Centre Britomart Transport Centre, also known as Britomart railway station, is the public transport hub in the central business district of Auckland and the northern terminus of the North Island Main Trunk railway line. It combines a railway station ...
in
Auckland CBD The Auckland Central Business District (CBD), or Auckland city centre, is the geographical and economic heart of the Auckland metropolitan area. It is the area in which Auckland was established in 1840, by William Hobson. It is New Zealand's l ...
, at an estimated cost of NZ$2.2 billion.


Light rail

The choice of mode and alignment for the Airport Line remained contentious. In the 2017 general election campaign, promises of light rail to the airport were made by the Labour Party, which established the Sixth Labour Government with a coalition agreement. One coalition partner, the Green Party, also favoured light rail although the other partner, New Zealand First, favoured the earlier heavy rail scheme. The previous ( National Party) government said that light rail would be eventually required, but would not happen for thirty years. On 28 January 2022, Transport Minister Michael Wood announced that the New Zealand Government has approved a NZ$14.6 billion project to establish a partially tunnelled light rail network between Auckland Airport and the
Wynyard Quarter The Wynyard Quarter (historically also known as the Western Reclamation, Wynyard Point, Wynyard Wharf or Tank Farm) is a reclaimed piece of land on the Waitematā Harbour at the western edge of the Auckland waterfront, New Zealand. It is lo ...
via the Auckland CBD. While the Green Party's Ricardo Menéndez welcomed the planned rail link, the ACT Party's transport spokesperson Simon Court claimed the project would be wasteful in terms of tax revenue.


References

{{Public transport in Auckland Proposed railway lines in New Zealand Public transport in Auckland Rail transport in Auckland Cancelled airport rail links