AVE 103
   HOME

TheInfoList



OR:

The Renfe Class 103 is a
high-speed train High-speed rail (HSR) is a type of rail system that runs significantly faster than traditional rail, using an integrated system of specialised rolling stock and dedicated tracks. While there is no single standard that applies worldwide, lines ...
used for the AVE service and operated in
Spain , image_flag = Bandera de España.svg , image_coat = Escudo de España (mazonado).svg , national_motto = ''Plus ultra'' (Latin)(English: "Further Beyond") , national_anthem = (English: "Royal March") , i ...
by the state-run railway company RENFE. The trainset is also known as S103 or S/103. The trains were constructed by
Siemens Siemens AG ( ) is a German multinational conglomerate corporation and the largest industrial manufacturing company in Europe headquartered in Munich with branch offices abroad. The principal divisions of the corporation are ''Industry'', '' ...
, as the second member of the company's Velaro family.


History

On 24 March 2001,
Siemens Siemens AG ( ) is a German multinational conglomerate corporation and the largest industrial manufacturing company in Europe headquartered in Munich with branch offices abroad. The principal divisions of the corporation are ''Industry'', '' ...
won one half of RENFE's tender to supply 32 high-speed trains for the Madrid-Barcelona high-speed rail line, offering a modified version of the ICE 3 high-speed train used by German Railways (
Deutsche Bahn The (; abbreviated as DB or DB AG) is the national railway company of Germany. Headquartered in the Bahntower in Berlin, it is a joint-stock company ( AG). The Federal Republic of Germany is its single shareholder. describes itself as the se ...
) for its
InterCityExpress The Intercity Express (commonly known as ICE ()) is a system of high-speed trains predominantly running in Germany. It also serves some destinations in Austria, Denmark (ceased in 2017 but planned to resume in 2022), France, Belgium, Switzerla ...
service. Changes involved an up-rate to higher power () for higher acceleration and top speed to cover the between
Barcelona Barcelona ( , , ) is a city on the coast of northeastern Spain. It is the capital and largest city of the autonomous community of Catalonia, as well as the second most populous municipality of Spain. With a population of 1.6 million within ci ...
and Madrid in 2h30m, the ability to operate in a high range of temperatures, and a different interior. The ICE 3 trains were a joint production with other Germany-based train manufacturers, who refused to supply parts or sell licenses to Siemens for the AVE Class 103. This caused a delay (for which Siemens eventually paid €21 million), during which Siemens had to re-develop the missing components. However, at the end of this development, Siemens had a complete high-speed train platform, which it named Velaro. The AVE Class 103 was intended as only the second member of a whole family after ICE 3, therefore, it was named by Siemens as the Velaro E. The AVE Class 103 has been certified to run at . During testing between Madrid and Zaragoza, on 16 July 2006, train 005 reached . This is both the current national rail speed record for Spain, and also the current speed record for a normal series train in standard configuration. On 23 December 2005, RENFE ordered a further 10 identical trains (Siemens designation Velaro E2). Currently, all 26 trains from both orders have been delivered and are in service.


Specifications

The certified top speed of the AVE Class 103 is , currently the highest for any train in the world, although the
Alstom Alstom SA is a French multinational rolling stock manufacturer operating worldwide in rail transport markets, active in the fields of passenger transportation, signalling, and locomotives, with products including the AGV, TGV, Eurostar, Avelia ...
AGV, currently conducting extensive tests, aims for certification at . The class has
distributed traction In rail transport, distributed power (DP) is a generic term referring to the physical distribution—at intermediate points throughout the length of a train—of separate motive power groups. Such "groups" may be single units or multiple consist ...
, traction equipment was moved underfloor, with powered bogies distributed in alternate carriages along the length of the train. This removes the need for driving units at either end, which AVE Class 100 and 102 have, allowing a better use of space, better energy efficiency, better acceleration at lower speeds, and better ability to climb grades. For the AVE Class 103, four of the eight cars were fitted with two powered bogies each. Electronically, the train is actually two identical half-trains of four coaches each, each with an independent power system, apart from the active pantograph (only a single pantograph is raised on AC-fed rail lines) and a high voltage line along the entire length of the 8-car train. The train's capacity of 404 passengers is split between three classes; with two coupled 8-car trains total capacity is therefore 808 passengers. In the end coaches (driving trailers), glass screens separate the driver and passengers, and allow passengers the same views as the driver, just as in the ICE 3 and other Velaros. The driver can turn these
opaque Opacity or opaque may refer to: * Impediments to (especially, visible) light: ** Opacities, absorption coefficients ** Opacity (optics), property or degree of blocking the transmission of light * Metaphors derived from literal optics: ** In lingui ...
if necessary or preferred.


In service

The AVE Class 103 entered commercial service on 22 June 2007, between Madrid and the temporary end of the line to Barcelona near Tarragona. While the trains and the tracks were commissioned for a regular top speed of , the train control and signalling system necessary for such operation, ETCS Level 2, was not ready for service. Thus commercial top speed is limited to the maximum Spanish authorities approve for the line with
ETCS Level 1 The European Train Control System (ETCS) is the signalling and control component of the European Rail Traffic Management System (ERTMS). It is a replacement for legacy train protection systems and designed to replace the many incompatible sa ...
since 2011, . ERTMS is technically capable of supporting speeds of up to , but the signal spacing on the Madrid-Barcelona line was initially, from 7 May 2007, only sufficient to support speeds of . In October 2011 the speed was raised to on parts of the railway.Madrid - Barcelona at 310 km/h with ETCS Level 2
/ref> From the opening of the Córdoba–Málaga high-speed rail line on 24 December 2007, the AVE Class 103 were also used from Madrid to Málaga. On 20 February 2008, the final section of the Madrid–Barcelona high-speed rail line into Barcelona was opened. From that day, the AVE Class 103 were used for the faster services between Madrid and Barcelona, achieving the shortest travel time of 2h30m on the non-stop runs.


See also

* List of high speed trains * Siemens Velaro
Stamps with AVE Class 103
* AVE Class 102


References


External links


Velaro E specification sheet; download, archived


Renfe page
Interactive 360° panoramas of the interior of a train AVE S103 - Siemens Velaro E
{{DEFAULTSORT:Renfe Class 103
103 103 may refer to: *103 (number), the number *AD 103, a year in the 2nd century AD *103 BC, a year in the 2nd century BC * 103 (Tyne Electrical Engineers) Field Squadron, a territorial regiment * 103 (Newcastle) Field Squadron, Royal Engineers *103 ( ...
Passenger trains running at least at 300 km/h in commercial operations Electric multiple units of Spain Siemens Velaro 25 kV AC multiple units