HOME
*



picture info

Thameslink
Thameslink is a 24-hour main-line route in the British railway system, running from , , , and via central London to Sutton, , , Rainham, , , , and . The network opened as a through service in 1988, with severe overcrowding by 1998, carrying more than 28,000 passengers in the morning peak. All the services are currently operated by Govia Thameslink Railway. The Thameslink Programme was a major £5.5billion scheme to increase capacity on the central London section by accommodating more frequent and longer trains, and providing additional routes and destinations. The new services began operating in 2018. In 2016, new Class 700 trains started operating on the route and replaced the Class 319, Class 377 and Class 387 trains which were withdrawn and transferred elsewhere. Route Much of the original route is over the Brighton Main Line (via London Bridge) and the southern part of the Midland Main Line, plus a suburban true loop (circuit) serving Sutton. A branch via the Ca ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Thameslink Programme
The Thameslink Programme, originally Thameslink 2000, was a £6billion project in south-east England to upgrade and expand the Thameslink rail network to provide new and longer trains between a wider range of stations to the north and to the south of London. The development facilitated new cross-London journeys, which means that passengers no longer have to change trains in London. Work included platform lengthening, station remodelling, new railway infrastructure, and new rolling stock. The project was originally proposed in 1991 following the successful introduction of the initial Thameslink service in 1988. After many delays, planning permission was granted in 2006 and funding was approved in October 2007. Work started in 2009 and was completed on 18 September 2020, although trains over the new routes began running in 2018. Planning Background The original Thameslink rail network was created by joining the electrified network south of the Thames with the then recent ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Thameslink
Thameslink is a 24-hour main-line route in the British railway system, running from , , , and via central London to Sutton, , , Rainham, , , , and . The network opened as a through service in 1988, with severe overcrowding by 1998, carrying more than 28,000 passengers in the morning peak. All the services are currently operated by Govia Thameslink Railway. The Thameslink Programme was a major £5.5billion scheme to increase capacity on the central London section by accommodating more frequent and longer trains, and providing additional routes and destinations. The new services began operating in 2018. In 2016, new Class 700 trains started operating on the route and replaced the Class 319, Class 377 and Class 387 trains which were withdrawn and transferred elsewhere. Route Much of the original route is over the Brighton Main Line (via London Bridge) and the southern part of the Midland Main Line, plus a suburban true loop (circuit) serving Sutton. A branch via the Ca ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

British Rail Class 700
The British Rail Class 700 '' Desiro City'' is an electric multiple unit passenger train capable of operating on from overhead wires or 750 V DC from third rail. 115 trainsets were built between 2014 and 2018, for use on the Thameslink network, as part of the Thameslink Programme in the United Kingdom. , they are operated by Govia Thameslink Railway. In 2011, the consortium Cross London Trains (XLT) consisting of Siemens Project Ventures, 3i Infrastructure, and Innisfree was announced as preferred bidder with Siemens Mobility to manufacture the trains. The decision was politically controversial as the trains were to be built in Germany, while the competing consortium led by Bombardier Transportation had a UK train factory. Both the procurement process and final close of contract were significantly delayed, resulting in the expected first delivery date moving from 2012 to 2016. The £1.6 billion contract to manufacture and provide service depots for the trains w ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Govia Thameslink Railway
Govia Thameslink Railway (GTR) is a train operating company that operates the Thameslink, Southern and Great Northern (TSGN) rail franchise in England. Within the franchise, GTR runs the Thameslink, Great Northern, Southern and Gatwick Express services. GTR is a subsidiary of Govia, which is itself a joint venture between the British Go-Ahead Group (65%) and French company Keolis (35%). The franchise was awarded, after repeated delays, to Govia Thameslink Railway on 23 May 2014. On 14 September 2014, GTR took over operations for the prior franchisee First Capital Connect; during July 2015, both Southern and Gatwick Express operations were integrated into GTR. This change made it the largest rail franchise in terms of passengers, staff and fleet in the UK. The franchise has an unusual structure involving a management contract that sees all fare revenues going straight to the Department for Transport (DfT), which in turn pays GTR fixed amounts that add up to £8.9 billion a ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

First Capital Connect
First Capital Connect (FCC) was a British train operating company, owned by FirstGroup, that operated the Thameslink and Great Northern sectors from April 2006 to September 2014 which later became the Thameslink, Southern and Great Northern (TSGN) franchise. First Capital Connect was a major provider of commuter and regional services in London and the south east of England. It operated passenger rail services from Luton and Bedford via the Thameslink to Sutton, Wimbledon and Brighton via Central London. It also operated commuter, suburban and regional services out of London King's Cross and London Moorgate to Hertfordshire, Cambridgeshire and Norfolk. Major destinations served included Cambridge, King's Lynn and Peterborough. First Capital Connect ceased operations at 02:00 on 14 September 2014, when the franchise was taken over by Govia Thameslink Railway, and became part of the larger Thameslink, Southern and Great Northern franchise. History On 8 April 2005, the Strateg ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

British Rail Class 319
The British Rail Class 319 is an electric multiple unit passenger train built by British Rail Engineering Limited's Holgate Road carriage works for use on north–south cross-London services. These dual-voltage trains are capable of operating on from AC overhead wires or 750V DC from a third rail. Built in two batches in 1987–88 and 1990, the units were primarily used on the then-new Thameslink service from Bedford to Brighton and various other destinations south of London. The majority of the fleet remained in use on the Thameslink route after its reshaping and privatisation in 1997. Some of the fleet was also used by Connex South Central and latterly Southern on various services operating out of London Victoria, including flagship expresses to Brighton. Since delivery of new rolling stock for Thameslink services began in 2015, the Class 319 units have been redeployed for use on electrified lines in North West England but by 2023 will be replaced by units cascaded f ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Thameslink (train Operating Company 1997–2006)
Thameslink was a train operating company in the United Kingdom owned by Govia that operated the Thameslink franchise from March 1997 until March 2006. The franchise was due to end on 31 March 2004, but on 13 February 2004 the Strategic Rail Authority awarded Govia a two-year extension. Services Thameslink operated passenger services from Bedford via the Thameslink route to London Moorgate, Sutton, Wimbledon and Brighton. Rolling stock Thameslink inherited a fleet of 66 Class 319s from Network SouthEast. During 2002, Thameslink hired two Class 317s from West Anglia Great Northern for services to Moorgate. Thameslink received some extra Class 319s from Southern in 2004. From September 2004 until May 2005, Class 317s were hired from West Anglia Great Northern to operate Bedford to St Pancras services while the Thameslink line was severed for six months for the new St Pancras station to be built. Depots Thameslink's fleet was originally maintained at Selhurst De ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Midland Main Line
The Midland Main Line is a major railway line in England from London to Nottingham and Sheffield in the Midlands. It comprises the lines from London's St Pancras station via Leicester, Derby/Nottingham and Chesterfield in the East Midlands. Express passenger services on the line are operated by East Midlands Railway. The line is electrified between St Pancras and Corby and the section south of Bedford forms the northern half of the Thameslink network, with a semi-fast service to Brighton and other suburban services. A northern part of the route, between Derby and Chesterfield, also forms part of the Cross Country Route operated by CrossCountry. Tracks from Nottingham to Leeds via Barnsley and Sheffield are shared with Northern. East Midlands Railway also operates regional and local services using parts of the line. The Midland Main Line is to receive a major upgrade of new digital signalling and full line electrification from London to Sheffield. HS2 is to branch onto th ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

British Rail Class 387
The British Rail Class 387 is a type of electric multiple unit passenger train built by Bombardier Transportation as part of the Electrostar family. A total of 107 units were built, with the first train entering service with Thameslink in December 2014. The trains are currently in service with Great Western Railway, Govia Thameslink Railway, and Heathrow Express. The Class 387 is a variation of the '' Bombardier Electrostar'', albeit with dual-voltage capability (which allows units to run on 750VDC third rail as well as use 25kVAC OLE). The class were the final rolling stock orders based on the Bombardier Electrostar family with 2,805 vehicles built over 18 years between 1999 and 2017. Description Class 387/1 The first Class 387/1s were ordered for the Thameslink route, which enabled the existing units to be transferred to Northern Rail for use on the newly electrified Manchester Victoria to Liverpool via Newton-le-Willows route. On behalf of the Department for Transport, ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

British Rail Class 377
The British Rail Class 377 ''Electrostar'' is a British dual-voltage electric multiple unit passenger train (EMU) built by Bombardier Transportation on its Electrostar platform at Derby Litchurch Lane Works from 2001 to 2014. Description The trains work suburban services in South London, and main-line commuter services to Sussex, Surrey, Kent and the South Coast, on which they replaced 4Cig and 4Vep slam-door stock that was more than 40 years old and did not meet modern health and safety requirements. Built in the early 2000s, the units had a troubled introduction. Being fully air-conditioned, their higher power consumption compared to the trains they replaced led to major upgrades being required to the 750 V DC third-rail power supply used in the former Southern region. The collapse of Railtrack following the Hatfield accident further delayed this upgrade work, and the new stock did not enter squadron service until 2003. Class 377s are fitted with externa ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

East Coast Main Line
The East Coast Main Line (ECML) is a electrified railway between London and Edinburgh via Peterborough, Doncaster, York, Darlington, Durham and Newcastle. The line is a key transport artery on the eastern side of Great Britain running broadly parallel to the A1 road. The line was built during the 1840s by three railway companies, the North British Railway, the North Eastern Railway, and the Great Northern Railway. In 1923, the Railway Act of 1921 led to their amalgamation to form the London and North Eastern Railway (LNER) and the line became its primary route. The LNER competed with the London, Midland and Scottish Railway (LMS) for long-distance passenger traffic between London and Scotland. The LNER's chief engineer Sir Nigel Gresley designed iconic Pacific steam locomotives, including '' Flying Scotsman'' and '' Mallard'' which achieved a world record speed for a steam locomotive, on the Grantham-to-Peterborough section. In 1948, the railways were nationali ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Rainham Railway Station (Kent)
Rainham railway station is on the Chatham Main Line in South East England, serving the town of Rainham, Kent. It is down the line from and is situated between Gillingham and . The station and most trains that call are operated by Southeastern. Following a timetable change on Sunday 20 May 2018, some trains are operated by Govia Thameslink. The station has three platforms. Platform 0 is an "up" bay platform, used mainly by Thameslink Services. Platform 1 is an "up" through providing services towards London, and Platform 2 is a "down" through for services towards Ramsgate and Dover Priory. It is sometimes shown as Rainham (Kent) in order to distinguish it from the station of the same name in East London. There are accessible entrances without stairs on both platforms, with step-free access via Platform 1 for services towards London (via main station entrance). Step-free access via Platform 2 for services away from London (via side entrance, short ramp from Granary Clo ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]