The Xuzhou Metro () is a
rapid transit Rapid transit or mass rapid transit (MRT), also known as heavy rail or metro, is a type of high-capacity public transport generally found in urban areas. A rapid transit system that primarily or traditionally runs below the surface may be ...
system in Xuzhou, Jiangsu Province, China. Construction began in February 2014, and Line 1 was opened on September 28, 2019, Line 2 was opened on November 28, 2020, and Line 3 was opened on June 28, 2021. By 2020, the network is scheduled to comprise three lines with a total length of about . The total investment is expected to be 44.3 billion
renminbi The renminbi (; symbol: ¥; ISO code: CNY; abbreviation: RMB) is the official currency of the People's Republic of China and one of the world's most traded currencies, ranking as the fifth most traded currency in the world as of April 202 ...
. The system is planned to comprise 11 lines and of track when fully built out. In its first year of operation the ridership was 7.5 million (2019).


Lines in operation


Line 1

Line 1 began construction in February 2014. The first phase is in length, and has 18 stations (17 underground and one elevated). It runs from Luwo in the west to Xuzhoudong Railway Station in the east. In June 2018, the
civil engineering Civil engineering is a professional engineering discipline that deals with the design, construction, and maintenance of the physical and naturally built environment, including public works such as roads, bridges, canals, dams, airports, sewa ...
construction work was reported to be 95% complete, leaving mostly track laying, decorations, and electromechanical installations to be completed. On August 30, 2018, railway work was declared complete, and electromechanical installations and decorations declared as "under intense progress". It was opened on September 28, 2019. Line 1 runs in east–west, starting from Luwo Station in Tongshan District in the west, and ending at Xuzhoudong Railway Station in Jiawang District in the east. It passes through Quanshan District, Gulou District, and Yunlong District, covering the east–west passenger flow corridor of Xuzhou City. Important nodes in Xuzhou city downtown, Bashan Area, and Chengdong New District connect to commercial centers such as People's Square, Pengcheng Square, Huaihai Square and Wanda Plaza, and quickly connect with the two major comprehensive passenger transport hubs, Xuzhou Railway Station and Xuzhoudong Railway Station. Line 1 opened on September 28, 2019. This was the first metro line in Xuzhou city. As of November 2020, Line 1 has a total length of , of which the line is elevated for , underground for , and at-grade for . There are a total of 18 stations, including one elevated station and 17 underground stations. Rolling stock for line 1 is six-section B-type trains. As of November 2020, the average daily ridership of Line 1 is 56,500, and the single-day ridership record is 150,000, set on October 2, 2019. Yearly ridership for 2020 on line 1 was 19 million.


Line 2

Line 2, opened on November 28, 2020, is long with 20 underground stations. The line is fully underground Xuzhou Metro Line 2 was the second metro line in Xuzhou city to open. It is a north–south to east–west backbone line that runs through the old city and Xuzhou New District, covering the north and southeast passenger flow corridors of the city, connecting the Jiulishan area, the old city and the new city.


Line 3

Line 3 opened on June 28, 2021, and is long in its first phase with 16 underground stations, two of which are transfer stations. It runs between Xiadian and Gaoxinqunan, connecting the North Zone, Central Zone, and South Zone of Xuzhou city. Line 3 is colored “Technological Blue”, selected in a poll.


Lines under construction


Line 3 (Phase 2)

The phase 2 of Line 3 will extend to Houpantaocun to north and to Mailou to south. It will add in total by 2025.


Line 6

Line 6 is planned to be long in its first phase with 16 stations. It will run between Huangshanlu Station and Xuzhoudong Railway Station. It is planned to open in September 2025. Line 6 will use fully automated trains operating in GoA4 mode.


Future development


Second phase

Construction is planned begin on the second phase of the Xuzhou Metro, including Line 4, Line 5, Line 6, and the second phase of Line 3. Construction is expected to be completed in 2024. The second phase will add to the system. Line 4 is planned to be long with 19 underground stations. It will run between Tuolanshan and Qiaoshangcun. Line 5 is planned to be long with 20 underground stations. It will run between Olympic Sports Center South and Xukuangcheng. Line 6 is planned to be long with 15 underground stations. It will run between Huangshanlu and
Xuzhou East Railway Station Xuzhou East railway station (; or Xuzhoudong railway station) is a station dedicated for high-speed railways in Xuzhou, Jiangsu, People's Republic of China. It is served by the Beijing–Shanghai high-speed railway and Xuzhou-Lanzhou high-speed r ...
. The second phase of Line 3 is planned to be long with 5 underground stations, running from Xiadian to Houpantaocun. These lines was approved by the
National Development and Reform Commission The National Development and Reform Commission of the People's Republic of China (NDRC), formerly State Planning Commission and State Development Planning Commission, is a macroeconomic management agency under the State Council, which has b ...
on January 20, 2020.


Third phase

The third phase of metro lines, still in planning, will complete the Xuzhou Metro's complete plan of 7 urban metro lines and 4 suburban lines. This phase will include the second phases of Line 1 and Line 2 and the entirety of Line 7, as well as the suburban lines S1, S2, S3, and S4.


Network map


References

{{Urban rail transit in China Rapid transit in China Rail transport in Jiangsu Transport infrastructure under construction in China 2019 establishments in China Railway lines opened in 2019 Automated guideway transit