The Victorian Big Battery is a grid-connected battery electricity storage facility adjacent to the
Moorabool Moorabool is a bounded rural locality of the City of Greater Geelong local government area in Victoria, Australia. History Moorabool Post Office opened on 1 October 1861 and closed in 1960. In 2021, the Victorian Big Battery began operati ...
Terminal Station ( substation) near Geelong in
Victoria, Australia Victoria is a state in southeastern Australia. It is the second-smallest state with a land area of , the second most populated state (after New South Wales) with a population of over 6.5 million, and the most densely populated state in ...
. The battery provides 450 MWh of storage and can discharge at 300 MW. It surpasses the 250 MWh
Gateway Energy Storage Gateway Energy Storage is a large-scale lithium-ion battery, operated by grid infrastructure developer LS Power. It has a storage capacity of 250 MWh, and it is located in Otay Mesa, California, on the outskirts of San Diego. It uses cells from ...
in
California California is a state in the Western United States, located along the Pacific Coast. With nearly 39.2million residents across a total area of approximately , it is the most populous U.S. state and the 3rd largest by area. It is also the m ...
, United States. As of December 2021, the project is the largest lithium-ion battery in the Southern Hemisphere. The Victorian Big Battery is owned and operated by French renewable energy producer
Neoen Neoen is a French producer of exclusively renewable energy headquartered in Paris, France. Founded in 2008, it develops, finances, builds and operates solar power plants, wind farms and energy storage solutions. As at 31 December 2021, the com ...
. Funding of $160 million was provided by the Clean Energy Finance Corporation, the Australian government's
green bank A green bank (sometimes referred to as green investment bank, clean energy finance authority, or clean energy finance corporation) is a financial institution, typically public or quasi-public, that uses innovative financing techniques and market ...
. Construction started at the beginning of 2021. It commenced operations on 8 December 2021. It uses
Tesla Megapack The Tesla Megapack is large-scale rechargeable lithium-ion battery stationary energy storage product, intended for use at battery storage power stations, manufactured by Tesla Energy, the clean energy subsidiary of Tesla, Inc. Launched in 2019, ...
storage units, an electric accumulator designed specifically for large-scale projects. The battery aims to prevent blackouts during periods of network instability by providing grid support services, capturing and storing excess energy from sources such as wind farms, and feeding it into the grid during peak periods or outages to support Victoria's electricity supply. The battery will store enough energy to power more than one million Victorian homes for half an hour.


Construction

Construction began in January 2021. The battery was scheduled to be commissioned in the Australian summer period 2021-2022 and has been in operation since December 8, 2021. For Neoen's battery, the EPC (Engineering, Procurement and Construction) contractor is Tesla, using UGL as the prime contractor. The connection assets are being provided by AusNet Services, with Downer as the prime contractor. The storage unit uses 212 Tesla Megapacks, each with a capacity of 3 MWh. This will be the first time Megapacks have been used in a facility of this scale in Australia. The battery is being built within AusNet's Moorabool Power Terminal in close proximity to the 500 KV high voltage line so that power can be sent quickly to where it is needed. Construction of the battery was supported by a $160 million loan from the Clean Energy Finance Corporation, an agency owned by the Australian federal government.


Services

Following a tender issued by the Victorian Government in 2020, Neoen was awarded a contract by the Australian Energy Market Operator to reserve approximately 80% of its capacity during the summer months to provide 250 MW of System Integrity Protection Scheme (SIPS) services. This will increase the transfer capacity on the Victorian/New South Wales interconnector during peak consumption periods and reduce the risk of unplanned power outages. The remaining 50 MW of the battery can be commercially deployed in the market by the operator. Outside the summer period, the battery, with a total capacity of 300 MW, will be operated commercially.


Fire

During the initial testing of the energy storage system on 30 July 2021, a fire broke out in one of the
Tesla Megapack The Tesla Megapack is large-scale rechargeable lithium-ion battery stationary energy storage product, intended for use at battery storage power stations, manufactured by Tesla Energy, the clean energy subsidiary of Tesla, Inc. Launched in 2019, ...
modules and destroyed two battery units while the fire was left to burn itself out, as recommended. No injuries were reported. The battery pack had been placed into offline mode before the fire, and this had also isolated the monitoring and management systems. The site was disconnected from the grid, with no impact on the power supply. The system was isolated, and energisation testing was not permitted to resume until 29 September 2021. The cause of the fire was determined to have been a leak of cooling fluid that short-circuited cells to thermal runaway. Subsequent configuration changes mean that the monitoring remains active on offline battery packs.


References

{{Energy in Victoria Energy storage projects Buildings and structures in Geelong Electric power infrastructure in Victoria (Australia) Energy infrastructure completed in 2021 2021 establishments in Australia