A value breakdown structure (VBS) is a
project management Project management is the process of leading the work of a team to achieve all project goals within the given constraints. This information is usually described in project documentation, created at the beginning of the development process. Th ...
technique introduced by Stephen Devaux as part of the
total project control Total project control (TPC) is a project management method that emphasizes continuous tracking and optimization of return on investment (ROI). It was developed by Stephen Devaux. It builds upon earlier techniques such as earned value managemen ...
(TPC) approach to project and program value analysis. The concept has similarities with the deliverable-oriented work breakdown structure (WBS) decomposition which is used in project management and
systems engineering Systems engineering is an interdisciplinary field of engineering and engineering management that focuses on how to design, integrate, and manage complex systems over their enterprise life cycle, life cycles. At its core, systems engineering util ...
to break down a project into smaller components in a
tree structure A tree structure, tree diagram, or tree model is a way of representing the hierarchical nature of a structure in a graphical form. It is named a "tree structure" because the classic representation resembles a tree, although the chart is gener ...
that represents how the work of the project will create the components of the final product. Resources and cost are typically inserted into the activities in a WBS, and summed to create a budget both for summary levels (often called "work packages") and for the whole project or program. Similarly, a value breakdown structure will provide the expected value-added of each activity and/or component of the project (or projects within a program).


Mandatory and optional activities

In most projects (and programs), there are some components and activities (and projects) that are mandatory and others that are optional. * Mandatory activities are required, and have the full value of the project investment, as the project cannot be completed without them. * Optional activities, in contrast, have only the value that they are adding to the project, i.e., their value is equal to the delta between the project/program value if they are included and the value if they are omitted. For example, in creating an automobile, an engine, a driveshaft and wheels may all be considered mandatory, whereas cupholders are optional. If any of the mandatory activities are excluded, the project's value approaches zero. But the value of the cupholders is only the difference between the value of the car with and without cupholders.


Value contributions may not necessarily be summarized

Values cannot be summed in a value breakdown structure similarly to how costs can be summed up from the branches of a work breakdown structure to provide an overall budget. For example, if the value of an automobile is $25,000, there are many components and activities that are mandatory in generating that value – leave any of them out, and the value of the project approaches zero. Therefore, the fact that the engine, driveshaft and wheels are all mandatory, and each therefore has a value-added of $25,000 does NOT make the value of the automobile $75,000.


Purpose

The main purpose of the value breakdown structure is to prioritize components and work by the value they are expected to add, and to ensure that the value of the project investment is not reduced by the inclusion of work which has a value-added that is less than its true cost, which is the sum of its resource costs and its
drag cost Drag cost is a project management metric developed by Stephen Devaux as part of the Total Project Control (TPC) approach to project schedule and cost analysis. It is the amount by which a project’s expected return on investment (ROI) is reduced du ...
. This can often happen if the project's critical path changes so that different activities suddenly acquire
critical path drag Critical path drag is a project management metric developed by Stephen Devaux as part of the Total Project Control (TPC) approach to schedule analysis and compression in the critical path method of scheduling. Critical path drag is the amount of t ...
and drag cost: an optional activity that adds $10,000 to the expected value of the project and has a budget of $5,000 may make sense when it can be performed off the critical path but should probably be jettisoned if on the critical path if they now have a negative value-added due to a drag cost of more than $5,000.


Use in index of project performance

The value from the value breakdown structure should also be used as the basis for tracking project value through
Devaux's Index of Project Performance Devaux's Index of Project Performance (usually known as the DIPP) is a project management performance metric formulated by Stephen Devaux as part of the total project control (TPC) approach to project and program value analysis. It is an index that ...
(DIPP). If scope is changed during execution, that change should be input into the value breakdown structure, the numerator in computing the Actual DIPP adjusted, and the DIPP Progress Index thus updated.


References


Further reading

*{{cite book , first = Stephen A. , last = Devaux , year = 2015 , title = Total Project Control (2nd Edition): A Practitioner's Guide to Managing Projects as Investments , publisher = CRC Press , isbn=978-1498706773 * Joris Van Ostaeyen et al., “Quantifying the Economic Potential of a PSS: Methodology and Case Study,” The Philosopher's Stone for Sustainability: Proceedings of the 4th CIRP International Conference on Industrial Prouct-Service Systems, Tokyo, Japan, November 8–9, 2012, ed. by Y. Shimomura and K. Kimita, pp. 523 – 528. * Gideon Koch (2013)
Value Breakdown Structure VBS
* Kjetil Strand (June 3, 2014), “ACE Introduces the Value Breakdown Structure!

* Stephen A. Devaux (June 16, 2014), “The Value Breakdown Structure: Features and Benefits”