Upper Tamakoshi Hydroelectric Project
   HOME

TheInfoList



OR:

The Upper Tamakoshi Hydroelectric Project is a 456 MW peaking
run-of-the-river Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amou ...
hydroelectric Hydroelectricity, or hydroelectric power, is electricity generated from hydropower (water power). Hydropower supplies one sixth of the world's electricity, almost 4500 TWh in 2020, which is more than all other renewable sources combined and ...
project in
Nepal Nepal (; ne, नेपाल ), formerly the Federal Democratic Republic of Nepal ( ne, सङ्घीय लोकतान्त्रिक गणतन्त्र नेपाल ), is a landlocked country in South Asia. It is mai ...
. It is the largest hydroelectric project in Nepal, operating since July 2021. It is sited on the
Tamakoshi River The Tamakoshi River ( ne, तामाकोशी) is part of the Koshi or Sapta Koshi river system in Nepalese Himalayas. It originates from (or Rongshar Tsangpo) and Lapchi Gang rivers close to the Nepal-Tibet border. It flows in southern d ...
(also spelled Tama Koshi), a tributary of the
Sapt Koshi The Kosi or Koshi ( ne, कोशी, , hi, कोसी, ) is a transboundary river which flows through China, Nepal and India. It drains the northern slopes of the Himalayas in Tibet and the southern slopes in Nepal. From a major confluence ...
river (also spelled Saptakoshi), near the Nepal–Tibet border. The Upper Tamakoshi Hydroelectric Project was a Nepal national priority project. When it is operated at full capacity, it is the largest hydroelectric plant in Nepal, with a power output equivalent to two-thirds of Nepal's current power generation. The project was entirely financed from domestic financial institutions and companies.


Financing and organization

Nepal Electricity Authority Nepal Electricity Authority (NEA), founded on 16 August 1985, is the parent generator and distributor of electric power under the supervision of the government of Nepal Nepal (; ne, नेपाल ), formerly the Federal Democratic Repu ...
(NEA) has established an autonomous company named Upper Tamakoshi Hydropower Limited (UTKHPL) in March 2007 (2063/11/25
B.S. A Bachelor of Science (BS, BSc, SB, or ScB; from the Latin ') is a bachelor's degree awarded for programs that generally last three to five years. The first university to admit a student to the degree of Bachelor of Science was the University ...
) as an executing agency for the implementation of the Project. There are six full-time and two invitee members in the Board of Directors (BoD) at present. Out of six full-time members, four members from NEA, one from Employees Provident Fund (EPF) and one from Nepal Telecom (NTC) are representing in the BoD. Similarly, representatives of Citizen Investment Trust (CIT) and Rastriya Beema Sansthan (RBS) are also in the BoD as invitee members. The majority share (51%) of the Company is held by four public entities, namely, Nepal Electricity Authority (NEA), Nepal Telecom (NTC), Citizen Investment Trust (CIT) and Rastriya Beema Sansthan (RBS). NEA has 41% stake, NTC has 6% and CIT & RBS each has 2% stake in the Company. Similarly, general public and residents of Dolakha District will have 15% and 10% share respectively. The remaining 24% share will be taken over by contributors in Employees Provident Fund (EPF), NEA & Companys staffs and staffs of financial institutions providing loans.


Construction

Construction began in February 2011, and the project was originally slated for completion in July 2018, later pushed back to December 2018, and again pushed back to November 2019. Works suffered new delays in 2019, and the most recently announced completion date of February 2020 is likely to be missed too.
Sinohydro Sinohydro (Chinese: 中国水电; long form: 中国水利水电建设集团公司) is a Chinese state-owned hydropower engineering and construction company. In the 2012 Engineering News-Record Top 225 Global Contractors, a ranking by annual reve ...
is the contractor for civil construction, Andritz Hydro GhmH of Austria is the contractor supplying electro-mechanical equipment, and KEC International of India is the contractor for 220 kV transmission line and sub-station. The consultant for detailed design and construction supervision is Joint Venture Norconsult-Lahmeyer in association with the local sub-consultant Total Management Services. Norconsult is Norway’s largest and one of the leading multidisciplinary consultancy firms in the Nordic region. Lahmeyer is a German engineering consultant that in 2019 was re-branded to Tractebel Engineering GmbH The same consultant, JV Norconsult-Lahmeyer was responsible for tender design for the project. The Nepalese Army was mobilized to provide security to the site in 2012, after it was reportedly threatened by vandalism and threats to construction staff and foreign workers. Work was disrupted by the
April 2015 Nepal earthquake The April 2015 Nepal earthquake (also known as the Gorkha earthquake) killed 8,964 people and injured 21,952 more. It occurred at on Saturday, 25 April 2015, with a magnitude of 7.8 Mw or 8.1 Ms and a maximum Mercalli Intensity of X (''Extreme ...
, after which over 200 Chinese workers were evacuated. Work was disrupted throughout the construction project by labor strikes. The earthquake also caused damage to roads and bridges and buried the troop barracks at the site. In May, 2018, it was reported that the planned July completion date could be jeopardized by late assembly of the turbomachinery that had been delivered to the site. Later in May, the country's finance minister said that the project was expected to contribute to robust national economic growth in 2018. Installation of
penstock A penstock is a sluice or gate or intake structure that controls water flow, or an enclosed pipe that delivers water to hydro turbines and sewerage systems. The term is inherited from the earlier technology of mill ponds and watermills. H ...
s began in February 2019 by a European contractor after the original Indian contractor failed to perform the work. A new date of November 2019 was set for initial energy production. The project was put on hold prior to completion of its testing and commissioning phase in 2020, when skilled foreign workers became unavailable in Nepal due to the global
COVID-19 epidemic The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identifie ...
. On 5 July 2021, the project was inaugurated by prime minister KP Sharma Oli.


Infrastructure

Infrastructure for the plant includes a 142 m long, 25 m high underground powerhouse hall near Gongar Khola, with six
Pelton wheel The Pelton wheel or Pelton Turbine is an impulse-type water turbine invented by American inventor Lester Allan Pelton in the 1870s. The Pelton wheel extracts energy from the impulse of moving water, as opposed to water's dead weight like the trad ...
s; a 22 m high × 60 m wide dam at
Lamabagar Lamabagar is a village development committee in Dolakha District in the Janakpur Zone of north-eastern Nepal. At the time of the 1991 Nepal census The 1991 Nepal census was a widespread national census conducted by the Nepal Central Bureau of ...
; a 360 m high surge shaft; and a total of 16 km of headrace and tailrace tunnels. The gross head will be 822 m. Near the dam are two 246 m × 26 m
settling basin A settling basin, settling pond or decant pond is an earthen or concrete structure using sedimentation to remove settleable matter and turbidity from wastewater. The basins are used to control water pollution in diverse industries such as agricult ...
s to remove particles greater than 0.15 mm. In January 2019 it was reported that the project did not have approval to clear forest land for new double 220 kVA
electrical transmission line Electric power transmission is the bulk movement of electrical energy from a generating site, such as a power plant, to an electrical substation. The interconnected lines that facilitate this movement form a ''transmission network''. This is d ...
s to replace existing 132 kVA lines. After its completion, the first unit started production from 5 July 2021.


References


Sources

*


Further reading

*


External links

* *{{Commons category inline Run-of-the-river power stations Hydroelectric power stations in Nepal Buildings and structures in Dolakha District Dams in Nepal Dams under construction National Pride Projects 2021 establishments in Nepal