The Ust-Ilimsk Hydroelectric Power Station (Ust-Ilimsk HPS) is a concrete gravity
dam
A dam is a barrier that stops or restricts the flow of surface water or underground streams. Reservoirs created by dams not only suppress floods but also provide water for activities such as irrigation, human consumption, industrial use ...
on the
Angara River
The Angara ( Buryat and mn, Ангар, ''Angar'', "Cleft"; russian: Ангара́, ''Angará'') is a major river in Siberia, which traces a course through Russia's Irkutsk Oblast and Krasnoyarsk Krai. It drains out of Lake Baikal and is ...
and adjacent
hydroelectric
Hydroelectricity, or hydroelectric power, is electricity generated from hydropower (water power). Hydropower supplies one sixth of the world's electricity, almost 4500 TWh in 2020, which is more than all other renewable sources combined and ...
power station
A power station, also referred to as a power plant and sometimes generating station or generating plant, is an industrial facility for the generation of electric power. Power stations are generally connected to an electrical grid.
Many p ...
. It is located near
Ust-Ilimsk
Ust-Ilimsk ( rus, Усть-Илимск, p=usʲtʲ ɪˈlʲimsk) is a town in Irkutsk Oblast, Russia, located on the Angara River. Population: 53,000 (1977).
History
An '' ostrog'' (fortress) was built on the present site of the town in the ...
,
Irkutsk Oblast
Irkutsk Oblast (russian: Ирку́тская о́бласть, Irkutskaya oblast; bua, Эрхүү можо, Erkhüü mojo) is a federal subject of Russia (an oblast), located in southeastern Siberia in the basins of the Angara, Lena, and Nizh ...
in
Russia
Russia (, , ), or the Russian Federation, is a List of transcontinental countries, transcontinental country spanning Eastern Europe and North Asia, Northern Asia. It is the List of countries and dependencies by area, largest country in the ...
and is the third dam on the Angara cascades. Construction on the dam began in 1963, its reservoir began filling in 1974 and its power plant was commissioned in 1980.
History
Background
Between 1951 and 1955, construction of the Ust-Ilimsk HPS was designated as a priority and in September 1960, the State Commission determined the most suitable spot for the dam. It would be constructed on the Angara River, below the mouth of the
Ilim River. Gidroproekt All-Union Design and Exploratory Institute produced the design of the HPS and on June 8, 1962, the
Central Committee of the CPSU
The Central Committee of the Communist Party of the Soviet Union, – TsK KPSS was the executive leadership of the Communist Party of the Soviet Union, acting between sessions of Congress. According to party statutes, the committee direct ...
and Ministerial Council of the
USSR
The Soviet Union,. officially the Union of Soviet Socialist Republics. (USSR),. was a transcontinental country that spanned much of Eurasia from 1922 to 1991. A flagship communist state, it was nominally a federal union of fifteen nationa ...
determined the schedule of construction and the project's scope.
Construction
Construction on Stage I of the HPS began in 1963. This included preparing the dam's foundation, various construction facilities and 220 kV power lines. In addition, the village of
Ust-Ilimsk
Ust-Ilimsk ( rus, Усть-Илимск, p=usʲtʲ ɪˈlʲimsk) is a town in Irkutsk Oblast, Russia, located on the Angara River. Population: 53,000 (1977).
History
An '' ostrog'' (fortress) was built on the present site of the town in the ...
was created as well to support workers on the project. By 1966, the Bratsk-Ust-Ilimsk motorway was opened to traffic and in March of that year, construction began on the actual power plant. On April 22, 1968, the first concrete was poured into the dam's foundation and by October 3, 1974, the dam began to inundate the Angara River, creating its reservoir. The dam was accepted for industrial operation in 1980.
Generation
By 1981, the HPS had generated its first 100 billion kWh which had doubled by 1986 and doubled again by 1995 with 400 billion kWh. By October 1, 2005, it had produced 600 billion kWh of electricity.
For comparison, in 2008, U.S. residential and commercial sectors consumed about 517 billion kWh for lighting. On average, the station produces 21.7 billion kWh annually and utilizes its installed capacity for 5,050 hours out of 8,760 a year.
Specifications
The main dam is long and high with a
spillway
A spillway is a structure used to provide the controlled release of water downstream from a dam or levee, typically into the riverbed of the dammed river itself. In the United Kingdom, they may be known as overflow channels. Spillways ensure tha ...
of in length. It is flanked by two earth-fill auxiliary dams, the one on its left (west) bank that is long and high. On the right (east) bank, the auxiliary dam is long and high. The power station is located on the right (east) bank and is long and houses 16 turbines with an installed capacity of 3,840 MW. The power station is designed to support another two turbines which, if installed, would bring its capacity up to 4,320 MW.
See also
*
List of power stations in Russia
The following page lists the power stations in Russia.
Renewable
Geothermal
Hydroelectric
Pumped-storage hydroelectric
Solar photovoltaic
The following is a list of photovoltaic power stations in Russia:).
In addition there ar ...
References
{{Angara River dams
Hydroelectric power stations built in the Soviet Union
Hydroelectric power stations in Russia
Dams in Russia
Buildings and structures in Irkutsk Oblast
Dams completed in 1974
Dams on the Angara River