UC-123B Ranch Hand Spraying 1962
   HOME

TheInfoList



OR:

SM ''UC-1'' was a German Type UC I
minelayer A minelayer is any warship, submarine or military aircraft deploying explosive mines. Since World War I the term "minelayer" refers specifically to a naval ship used for deploying naval mines. "Mine planting" was the term for installing controll ...
submarine A submarine (or sub) is a watercraft capable of independent operation underwater. It differs from a submersible, which has more limited underwater capability. The term is also sometimes used historically or colloquially to refer to remotely op ...
or
U-boat U-boats were naval submarines operated by Germany, particularly in the First and Second World Wars. Although at times they were efficient fleet weapons against enemy naval warships, they were most effectively used in an economic warfare role ...
in the
German Imperial Navy The Imperial German Navy or the Imperial Navy () was the navy of the German Empire, which existed between 1871 and 1919. It grew out of the small Prussian Navy (from 1867 the North German Federal Navy), which was mainly for coast defence. Kaiser ...
(german: Kaiserliche Marine) during
World War I World War I (28 July 1914 11 November 1918), often abbreviated as WWI, was one of the deadliest global conflicts in history. Belligerents included much of Europe, the Russian Empire, the United States, and the Ottoman Empire, with fightin ...
. The U-boat had been ordered by November 1914 and was launched on 26 April 1915. She was commissioned into the German Imperial Navy on 5 July 1915 as SM ''UC-1''."SM" stands for "Seiner Majestät" ( en, His Majesty's) and combined with the ''U'' for ''Unterseeboot'' would be translated as ''His Majesty's Submarine''. Mines laid by ''UC-1'' in her 80 patrols were credited with sinking 41 ships. ''UC-1'' disappeared after 18 July 1917.UC-1 was sunk on 24 July 1917 by F2B Felixstowe flying boat. Standard practice was to fly along the U boat and drop 2 250lb bombs astride it, hoping to cause leaks and give time for a destroyer to collect the submariners and sink it. On this occasion, by fluke, one bomb went through the conning tower and blew the base out of UC1. MFG Mill was awarded the DFC for this but he refused to wear it because of the total loss of life


Design

A
German Type UC I submarine The Type UC I coastal submarines were a class of small minelaying U-boats built in Germany during the early part of World War I. They were the first operational minelaying submarines in the world (although the Russian submarine ''Krab'' was laid ...
, ''UC-1'' had a displacement of when at the surface and while submerged. She had a
length overall __NOTOC__ Length overall (LOA, o/a, o.a. or oa) is the maximum length of a vessel's hull measured parallel to the waterline. This length is important while docking the ship. It is the most commonly used way of expressing the size of a ship, an ...
of , a
beam Beam may refer to: Streams of particles or energy *Light beam, or beam of light, a directional projection of light energy **Laser beam *Particle beam, a stream of charged or neutral particles **Charged particle beam, a spatially localized grou ...
of , and a draught of . The submarine was powered by one
Daimler-Motoren-Gesellschaft Daimler-Motoren-Gesellschaft (abbreviated as DMG, also known as ''Daimler Motors Corporation'') was a German engineering company and later automobile manufacturer, in operation from 1890 until 1926. Founded by Gottlieb Daimler (1834–1900) and ...
six-cylinder, four-stroke diesel engine producing , an electric motor producing , and one
propeller shaft A drive shaft, driveshaft, driving shaft, tailshaft (Australian English), propeller shaft (prop shaft), or Cardan shaft (after Girolamo Cardano) is a component for transmitting mechanical power and torque and rotation, usually used to connect ...
. She was capable of operating at a depth of . The submarine had a maximum surface speed of and a maximum submerged speed of . When submerged, she could operate for at ; when surfaced, she could travel at . ''UC-1'' was fitted with six mine tubes, twelve UC 120 mines, and one machine gun. She was built by
AG Vulcan Stettin Aktien-Gesellschaft Vulcan Stettin (short AG Vulcan Stettin) was a German shipbuilding and locomotive building company. Founded in 1851, it was located near the former eastern German city of Stettin, today Polish Szczecin. Because of the limited ...
and her
complement A complement is something that completes something else. Complement may refer specifically to: The arts * Complement (music), an interval that, when added to another, spans an octave ** Aggregate complementation, the separation of pitch-class ...
was fourteen crew members.


Summary of raiding history


References


Notes


Citations


Bibliography

* * * * {{DEFAULTSORT:Uc001 German Type UC I submarines U-boats commissioned in 1915 World War I submarines of Germany Maritime incidents in 1917 U-boats sunk in 1917 1915 ships World War I minelayers of Germany Ships built in Hamburg Missing U-boats of World War I