Total Core Recovery
   HOME

TheInfoList



OR:

Core recovery parameters describe the quality of core recovered from a
borehole A borehole is a narrow shaft bored in the ground, either vertically or horizontally. A borehole may be constructed for many different purposes, including the extraction of water ( drilled water well and tube well), other liquids (such as petro ...
.


Total core recovery

Total core recovery (TCR) is the borehole core recovery
percentage In mathematics, a percentage (from la, per centum, "by a hundred") is a number or ratio expressed as a fraction of 100. It is often denoted using the percent sign, "%", although the abbreviations "pct.", "pct" and sometimes "pc" are also us ...
. TCR is defined as the quotient: :TCR = \left(\frac\right)\times 100 % :l_\mathrm = Sum of length of core pieces :l_\mathrm = Total length of core run


Solid core recovery

Solid core recovery (SCR) is the borehole core recovery percentage of solid, cylindrical, pieces of rock core. SCR is defined as the quotient: :SCR = \left(\frac\right)\times 100 % :l_ = Sum of length of solid, cylindrical, core pieces :l_ = Total length of core run


Rock quality designation

Rock-quality designation (RQD) is a rough measure of the degree of jointing or fracture in a rock mass, measured as a percentage of the drill core in lengths of 10 cm or more. High-quality rock has an RQD of more than 75%, low quality of less than 50%. Rock quality designation (RQD) has several definitions. The most widely used definition was developed in 1964 by D. U. Deere. It is the borehole core recovery percentage incorporating only pieces of solid core that are longer than 100 mm in length measured along the centerline of the core. In this respect pieces of core that are not hard and sound should not be counted though they are 100 mm in length. RQD was originally introduced for use with core diameters of 54.7 mm (NX-size core). RQD has considerable value in estimating support of rock tunnels. RQD forms a basic element in some of the most used rock mass classification systems:
Rock Mass Rating system Core recovery parameters describe the quality of core recovered from a borehole. Total core recovery Total core recovery (TCR) is the borehole core recovery percentage. TCR is defined as the quotient: :TCR = \left(\frac\right)\times 100 % :l_\m ...
(RMR) and Q-system. RQD is defined as the quotient: :RQD = \left(\frac\right)\times 100 % :l_ = Sum of length of core pieces that are > 100 mm (4 inches) measured along the centerline :l_ = Total length of core run


Classification table

From the RQD index the rock mass can be classified as follows:


Rock mass classification

Many
rock mass classification Rock mass classification systems are used for various engineering design and stability analysis. These are based on empirical relations between rock mass parameters and engineering applications, such as tunnels, slopes, foundations, and excavatabili ...
systems use core recovery parameters as input parameter, such as
Rock Mass Rating The rock mass rating (RMR) is a geomechanics, geomechanical classification system for Rock (geology), rocks, developed by Z. T. Bieniawski between 1972 and 1973. Since then it has undergone multiple modifications out of which, RMR89 is commonly us ...
and Q-system.


References

* Deere, D U (1964). "Technical description of rock cores", ''Rock Mechanics Engineering Geology'', 1 (16-22). * Deere, D U (1989). "Rock quality designation (RQD) after twenty years", ''U.S. Army Corps of Engineers Contract Report GL-89-1'', Waterways Experiment Station, Vicksburg, MS (67). * Deere, D U & Deere, D W (1988), "The RQD index in practice", ''Proc. Symp. Rock Class. Engineering Purposes, ASTM Special Technical Publications 984'', Philadelphia, (91-101). * Deere, D U, Hendron, A J, Patton, F D & Cording, E J (1967). "Design of surface and near surface constructions in rock", ''Proc. 8th U.S. Symp. Rock Mechanics'', ed. Fairhurst, publ. AIME, New York, (237-302).


Further reading

* * * {{DEFAULTSORT:Core Recovery Parameters Rock mass classification Tunnel construction ko:Q시스템