The Toluca–Mexico City commuter rail ( Spanish: ''Tren Interurbano de Pasajeros Toluca-Valle de México'') project is a
commuter rail Commuter rail, or suburban rail, is a passenger rail transport service that primarily operates within a metropolitan area, connecting commuters to a central city from adjacent suburbs or commuter towns. Generally commuter rail systems are con ...
line currently under construction. Also known as Interurban Train Mexico City–Toluca, the passenger railway line will connect the cities of
Toluca Toluca , officially Toluca de Lerdo , is the state capital of the State of Mexico as well as the seat of the Municipality of Toluca. With a population of 910,608 as of the 2020 census, Toluca is the fifth most populous city in Mexico. The city ...
and
Mexico City Mexico City ( es, link=no, Ciudad de México, ; abbr.: CDMX; Nahuatl: ''Altepetl Mexico'') is the capital and largest city of Mexico, and the most populous city in North America. One of the world's alpha cities, it is located in the Valley o ...
. The project was announced by
President President most commonly refers to: *President (corporate title) * President (education), a leader of a college or university * President (government title) President may also refer to: Automobiles * Nissan President, a 1966–2010 Japanese ...
Enrique Peña Nieto Enrique Peña Nieto (; born 20 July 1966), commonly referred to by his initials EPN, is a Mexican politician who served as the 64th president of Mexico from 1 December 2012 to 30 November 2018. A member of the Institutional Revolutionary Party ...
on 1 December 2012. Construction began in July 2014. As of October 2020, it was estimated to open in 2023.


Background

As a part of Enrique Peña Nieto's Presidency to offer public transport from Toluca to Mexico City, a
cost–benefit analysis Cost–benefit analysis (CBA), sometimes also called benefit–cost analysis, is a systematic approach to estimating the strengths and weaknesses of alternatives. It is used to determine options which provide the best approach to achieving benefits ...
report was drafted and published in November 2013. The report proposed several routes. The three routes were concentrated to the metro terminals of Cuatro Caminos,
Tacubaya Tacubaya is a working-class area of west-central Mexico City, in the borough of Miguel Hidalgo, consisting of the '' colonia'' Tacubaya proper and adjacent areas in other colonias, with San Miguel Chapultepec sección II, Observatorio, Daniel G ...
, and Observatorio. Ultimately, the third route along Avenida Las Torres to Observatorio was chosen in order to avert future sprawl, avoid deforestation in the Sierra de las Cruces, and prevent pollution of aquifers that supply water to residents. A section of the chosen route was altered by in October 2015 to no longer run above Avenida Vasco de Quiroga in Cuajimalpa. The railway line will be electrified and elevated with a tunnel portion between the State of Mexico and Mexico City. There are six stations planned. Four stations will be located in the State of Mexico and the remaining two will be located in Mexico City. The line is designed to complement the Mexico City Metro by terminating at Observatorio station of Line 1 and provide heavy railway service to the Santa Fe business district. A shuttle will provide connection to Toluca International Airport at the Tecnológico station. The commuter line will run parallel to Avenida Las Torres and
Mexican Federal Highway 15 Federal Highway 15 ( es, Carretera Federal 15, Fed. 15 ) is Mexico 15 International Highway or Mexico- Nogales Highway, is a primary north-south highway, and is a free part of the federal highways corridors ( es, los corredores carreteros fe ...
/ Mexican Federal Highway 15D. The total cost of the project was estimated at $38.6 billion
MXN The Mexican peso (Currency symbol, symbol: $; ISO 4217, code: MXN) is the currency of Mexico. Modern peso and dollar currencies have a common origin in the 16th–19th century Spanish dollar, most continuing to use dollar sign, its sign, "$". ...
in 2014.


Construction

The Secretariat of Communications and Transportation (SCT) divided the project into three sections for contractors to bid on: :Section 1 covers the western terminal in Zinacantepec to the eastern tunnel entrance at Sierra de las Cruces. This encompasses of the project. The contracts were awarded to La Peninsular Compañía Constructora and Constructora de Proyectos Viales de México. :Section 2 is the tunnel portion underneath Sierra de las Cruces. was awarded the contract. :Section 3 involves the Mexico City portion from the western tunnel entrance at Sierra de las Cruces to the Metro Observatorio Station. The contract was awarded to a consortium. For its rolling stock, Spanish manufacturing company CAF was awarded a contract in 2014 to construct 30 EMUs for $11.6 billion MXN (€690 million). Each EMU will have five cars, have a capacity of 700 passengers, and operate at a maximum speed of . Deliveries for the trainsets began in January 2017. The
train depot A train station, railway station, railroad station or depot is a railway facility where trains stop to load or unload passengers, freight or both. It generally consists of at least one platform, one track and a station building providing su ...
will be located west of Zinacantepec station at a cost of MXN942 million. The contract was awarded to a consortium in March 2016. In July 2014, a formal ceremony was carried out by the head of SCT, Gerardo Ruiz Esparza, to mark the start of construction. There have been several construction accidents during the project. On 4 May 2016, the temporary support structures gave way, causing the concrete decking to collapse near the intersection of Avenida Las Torres and Avenida Colón in Toluca. On 2 June 2016, bad weather caused concrete-reinforced rebar to fold onto traffic near the intersection of Avenida Las Torres and Avenida Díaz Mirón in Toluca. On 7 July 2016, a work site caved in killing one worker and injuring two. On 16 July 2016, a construction worker was killed when a truck lost control and struck the worker on a construction site in Metepec. In July 2019, the SCT determined the project's completion would be delayed to the end of 2022.
Javier Jiménez Espriú Javier Jiménez Espriú (born 31 July 1937) is a Mexican academic and former Secretary of Communications and Transportation of Mexico. He is the former head of the engineering school at the National Autonomous University of Mexico. He was Und ...
, head of the SCT, announced the project was 87% complete, however, there have been cost overruns from $42.72 billion MXN in 2015 to $73.72 billion MXN in 2019.


See also

* Suburban Railway of the Valley of Mexico Metropolitan Area


References


External links


Tren InterUrbano

SCT — Tren Interurbano México-Toluca
{{DEFAULTSORT:Tren Interurbano de Pasajeros Toluca-Valle de México Railway companies of Mexico Proposed rail infrastructure in Mexico Rail transportation in Mexico City Standard gauge railways in Mexico Electric railways in Mexico 2023 in rail transport