Texas Central or Texas Central Partners, LLC, is a private railroad company that is proposing a high-speed rail line between Dallas/Fort Worth and
Houston Houston (; ) is the most populous city in Texas, the most populous city in the Southern United States, the fourth-most populous city in the United States, and the sixth-most populous city in North America, with a population of 2,304,580 i ...
. It plans to use technology based on that used by the Central Japan Railway Company and trains based on the
N700S Series Shinkansen The is a Japanese Shinkansen high-speed train with tilting capability operated by JR Central and JR West on the Tokaido and San'yō Shinkansen lines since 2020, and JR Kyushu on the Nishi Kyushu Shinkansen line since 2022. History In June 20 ...
. The company has indicated that the journey time would be less than 90 minutes, with service beginning as early as 2026.


Company

Lone Star High-Speed Rail LLC was founded in 2009, changing its name to Texas Central Railway in 2012. Texas Central Partners, LLC (TCP), was founded on September 24, 2013, as the company to build and operate the service, with the rail line itself owned by the separate Texas Central Railway (TCR). Texas Central Partners is working with the Federal Railroad Administration (FRA) and TxDOT to develop the Environmental Impact Statement required by
NEPA The National Environmental Policy Act (NEPA) is a United States environmental law that promotes the enhancement of the environment and established the President's Council on Environmental Quality (CEQ). The law was enacted on January 1, 1970.Un ...
. In July 2015 the company announced that it had secured $75 million of private funding to allow the project to move forward from feasibility studies to development planning. On June 11, 2022, CEO Carlos Aguilar stepped down after leading Texas Central since December 2016. As of Aguilar's resignation, the company lacks any top management.


Route

On August 10, 2015, the
U.S. Department of Transportation The United States Department of Transportation (USDOT or DOT) is one of the executive departments of the U.S. federal government. It is headed by the secretary of transportation, who reports directly to the President of the United States and ...
and Federal Railroad Administration (FRA) issued a report that supported the so-called utility corridor for the line. In December 2017, the FRA further released their draft environment impact statement for the High-Speed Rail that proposed the preferred route. From the station in
Dallas Dallas () is the List of municipalities in Texas, third largest city in Texas and the largest city in the Dallas–Fort Worth metroplex, the List of metropolitan statistical areas, fourth-largest metropolitan area in the United States at 7.5 ...
, located on the west side of The Cedars with pedestrian walkways connecting to
Kay Bailey Hutchison Convention Center The Kay Bailey Hutchison Convention Center (KBHCCD) (formerly Dallas Convention Center) is a convention center in the Convention Center District of downtown Dallas, Texas. The "Dallas Memorial Auditorium" was a standalone multipurpose arena, de ...
, the route runs on elevated tracks parallel to a BNSF Railway line leaving the Dallas-Fort Worth Metroplex. The line then proceeds through Ellis, Navarro, Freestone,
Limestone Limestone ( calcium carbonate ) is a type of carbonate sedimentary rock which is the main source of the material lime. It is composed mostly of the minerals calcite and aragonite, which are different crystal forms of . Limestone forms whe ...
, Leon, and Madison counties. One intermediate station is planned for unincorporated Grimes County in order to serve the cities of Bryan-College Station and
Huntsville, Texas Huntsville is a city in and the county seat of Walker County, Texas. The population was 45,941 as of the 2020 census. It is the center of the Huntsville micropolitan area. Huntsville is in the East Texas Piney Woods on Interstate 45 and home ...
, which includes more than 100,000 students at
Texas A&M University Texas A&M University (Texas A&M, A&M, or TAMU) is a public, land-grant, research university in College Station, Texas. It was founded in 1876 and became the flagship institution of the Texas A&M University System in 1948. As of late 2021, T ...
(the state's largest),
Blinn College Blinn College is a public junior college in Brenham, Texas, with additional campuses in Bryan, Schulenburg, and Sealy. Brenham is Blinn's main campus, with dormitories and apartments. History Blinn was established as Mission Institute in 188 ...
, and Sam Houston State University, combined. The line then passes through Waller County before entering Harris County and the Houston area. The train line would run parallel to U.S. 290, Hempstead Highway and another
Union Pacific Railroad The Union Pacific Railroad , legally Union Pacific Railroad Company and often called simply Union Pacific, is a freight-hauling railroad that operates 8,300 locomotives over routes in 23 U.S. states west of Chicago and New Orleans. Union Paci ...
freight line before ending at the Houston station, site of the former Northwest Mall.


Rolling stock

The line was expected to use a variation of the
N700 Series Shinkansen The is a Japanese Shinkansen high-speed train with tilting capability developed jointly by JR Central and JR West for use on the Tokaido and San'yō Shinkansen lines since 2007, and also operated by JR Kyushu on the Kyushu Shinkansen line. ...
modified for export, referred to as the N700-I. However, following the launch of the N700S in Japan, focus has shifted onto this newer model. Its modular buildup makes it easier to change the train length from the 16 cars used in Japan and it is tested for higher top speeds, removing the need to perform expensive modifications. Trains in the US will consist of eight cars and are expected to have a top speed of . Their tested speed in Japan is , but they are only allowed to operate at due to strict noise regulations, as trains pass through many urban residential areas.


Signalling

The signaling of the line is likely to be a replica of the digital ATC system used on
Tokaido Shinkansen The is a Japanese high-speed rail line that is part of the nationwide Shinkansen network. Along with the Sanyo Shinkansen, it forms a continuous high-speed railway through the Taiheiyō Belt, also known as the Tokaido corridor. Opened in 196 ...
.


Construction plans and contractors

In January 2017, President
Donald Trump Donald John Trump (born June 14, 1946) is an American politician, media personality, and businessman who served as the 45th president of the United States from 2017 to 2021. Trump graduated from the Wharton School of the University of P ...
's administration listed the project as a national transportation infrastructure priority. In June 2017, it was stated that construction would begin in 2019 and would support 10,000 jobs during each year of the construction process and 1,500 permanent jobs once operations begin. In May 2018, Texas Central announced that global engineering firm Bechtel will work with bullet train developer Texas Central on project management. On September 13, 2018, the company earned a $300 million loan for permitting, design and engineering. The company selected Salini Impregilo and its U.S. subsidiary Lane Construction Company to lead the civil construction consortium that will build the Texas passenger line, to the top of the rails, including viaducts, embankments and drainage. In January 2018, plans for the station in Dallas were released as the preferred location identified by the Federal Railroad Administration in their Draft Environmental Impact Statement. In October 2018, Texas Central named Spanish railway company Renfe Operadora as the train's operating partner. The operator will run the trains; maintain system components, such as the engines, signals and other equipment; oversee ticketing, passenger loyalty programs and other services. In September 2019, Texas Central signed a further design-build contract with the joint venture Salini-Lane to lead the effort to supply the civil infrastructure scope of design, construction and installation as well as the design and construction of the viaduct and embankment sections along the entire route, the installation of the track system and the alignment and construction of all buildings and services along the route that will house maintenance and other rail system equipment. Construction is slated to begin as early as 2021 and end in 2026. In February 2019, Texas Central announced that it had contracted Resource Environmental Solutions (RES) for ecological mitigation services to help protect and enhance natural ecosystems and the environmental throughout construction and operations. Also that month, Texas Central named Citi and MUFG as its financial advisers to spearhead its capital-raising efforts. The Federal permitting the Record of Decision was due by March 27, 2020, and a $5.9 billion design and operation contract was awarded to Renfe in February 2020. FRA regulatory approvals came in September 2020, with construction expected to commence relatively shortly thereafter. In June 2021, the $16 billion design and construction contract for the line itself was awarded to Webuild, with construction expected to begin in late 2021 or early 2022. In September 2021, the CEO of Texas Central, Carlos Aguilar, stated in an interview that there was a 50/50 chance that construction would commence within 6 months, and that much depended on a major infrastructure bill passing the US Congress.


Legal issues

The
right-of-way Right of way is the legal right, established by grant from a landowner or long usage (i.e. by prescription), to pass along a specific route through property belonging to another. A similar ''right of access'' also exists on land held by a gov ...
to be acquired from private property owners is a significant factor for the project. Ranchers living along the proposed route have challenged the company's attempts to survey and construct the line, questioning their right to
eminent domain Eminent domain (United States, Philippines), land acquisition (India, Malaysia, Singapore), compulsory purchase/acquisition (Australia, New Zealand, Ireland, United Kingdom), resumption (Hong Kong, Uganda), resumption/compulsory acquisition (Austr ...
. Grimes County has opposed the project. Texas Central Railroad filed a lawsuit against a landowner that refused to allow survey crews onto his land. The railroad filed for
summary judgment In law, a summary judgment (also judgment as a matter of law or summary disposition) is a judgment entered by a court for one party and against another party summarily, i.e., without a full trial. Summary judgments may be issued on the merits of ...
in the case, ''Texas Central Railroad and Infrastructure vs Calvin House'', arguing that it was entitled to require private landowners to allow land surveys for possible future eminent domain purchases under Texas state law. However, in a December 2016 ruling, a Harris County court denied the railroad's petition for summary judgment. In February 2019, a Leon County District Judge ruled that Texas Central is not a railroad company and therefore does not have the right to conduct surveys on private land. In July 2019, Texas's 14th
Court of Appeals A court of appeals, also called a court of appeal, appellate court, appeal court, court of second instance or second instance court, is any court of law that is empowered to hear an appeal of a trial court or other lower tribunal. In much of ...
reversed a previous decision by a lower court which granted summary judgment and issued a permanent injunction in Grimes County's public-nuisance suit against Texas Central and Pacheco Koch Consulting Engineers, Inc. In May 2020, Texas's 13th Court of Appeals ruled that Texas Central Railroad and Infrastructure, Inc. and Integrated Texas Logistics, Inc.) are both railroad companies and interurban electric railways. The case ''James Fredrick Miles v. Texas Central Railroad and Integrated Texas Logistics, Inc.'' was appealed to the Supreme Court of Texas. The Ellis County
commissioners' court Commissioners' court, or in Arkansas a quorum court, is the governing body of county government in three US states: Arkansas, Texas and Missouri. It is similar in function to a board of county commissioners. A similar system was in place in the ...
, and other counties along the proposed route which oppose high-speed rail, filed an
amicus brief An ''amicus curiae'' (; ) is an individual or organization who is not a party to a legal case, but who is permitted to assist a court by offering information, expertise, or insight that has a bearing on the issues in the case. The decision on ...
in support of the challenge to the project. On June 18, 2021, the state supreme court denied review without comment, thereby letting stand the lower appellate court's ruling. A motion for rehearing was filed by the landowner on July 29, 2021, which was followed by numerous amicus curiae letters weighing in on the merits of the project. On October 15, 2021, the Texas Supreme Court withdrew its denial, reinstated the petition, and set the case for oral argument on January 11, 2022. The key legal issue is whether Texas Central qualifies as a "railroad company" or an "interurban electric railway," and whether an entity must show reasonable probability of project completion to invoke eminent domain authority under ''Texas Rice Land Partners, LTD. v. Denbury Green Pipeline-Texas, LLC'', 363 S.W.3d 192 (Tex. 2012). On July 16, 2020, the federal Surface Transportation Board ruled that Texas Central Railroad is part of the interstate rail network based on its through-ticketing with
Amtrak The National Railroad Passenger Corporation, doing business as Amtrak () , is the national passenger railroad company of the United States. It operates inter-city rail service in 46 of the 48 contiguous U.S. States and nine cities in Canada ...
, and therefore subject to the STB's jurisdiction. In June 2022, the Supreme Court of Texas ruled 5–3 that Texas Central has eminent domain authority on land that is needed to build the rail line.


See also

* High-speed rail in Texas * South Central Corridor * Brightline West *
California High-Speed Rail California High-Speed Rail (also known as CAHSR or CHSR) is a publicly funded high-speed rail system currently under construction in California in the United States. Planning for the project began in 1996, when the California Legislature and Gover ...


References


External links

*
Dallas to Houston High-Speed Rail – Passenger Service from Houston to Dallas
– Federal Railroad Administration {{Portal bar, Trains, Transport 2026 in rail transport High-speed railway lines in the United States Proposed railway lines in Texas Texas Central Railway Railway electrification in the United States Projects established in 2009 High-speed rail in the United States