Turoa (or Tūroa) is a skifield on the south western side of
Mount Ruapehu Mount Ruapehu (; ) is an active stratovolcano at the southern end of the Taupō Volcanic Zone and North Island volcanic plateau in New Zealand. It is northeast of Ohakune and southwest of the southern shore of Lake Taupō, within the Tongari ...
, the highest mountain in the North Island of
New Zealand New Zealand ( mi, Aotearoa ) is an island country in the southwestern Pacific Ocean. It consists of two main landmasses—the North Island () and the South Island ()—and over 700 smaller islands. It is the sixth-largest island count ...
, in
Tongariro National Park Tongariro National Park (; ) is the oldest national park in New Zealand,Department of Conservation"Tongariro National Park: Features", retrieved 21 April 2013 located in the central North Island. It has been acknowledged by UNESCO as a World H ...
. The area has been used for skiing since before the completion of the Mountain Road, but the first lifts opened in 1978. There are two beginner areas, and many intermediate and advanced trails. The upper field is a mix of natural pipes, steep drops, fast plains, and easier slopes, along with several terrain parks. The lower field contains the field's single narrow beginner trail, Clarry's Track, and a few other intermediate trails. They also serve as access to the base area from the upper mountain, and are often crowded. The field is and has a vertical drop. The skifield is reached via the Mountain Road from the town of
Ohakune Ohakune is a small town at the southern end of Tongariro National Park, close to the southwestern slopes of the active volcano Mount Ruapehu, in the North Island of New Zealand. A rural service town known as New Zealand's Carrot Capital, Ohak ...
. The Mountain Road was built by locals from Ohakune, mostly during weekends after they formed the Mountain Road Association in 1952. Their aim was to open Ruapehu's southern slopes for skiing, partly as a replacement industry for the decline in logging which had sustained the town for the previous decades. The now renamed Ministry of Works helped with the road on one occasion by 'misplacing' a culvert destined for another roading project. The 17 kilometre road was opened in 1963. It winds up through spectacular native forest before breaking out above the tree line and finishes at a complex of carparks below the bottom chairlift. Turoa has been owned by Ruapehu Alpine Lifts since 2000, which also owns the nearby Whakapapa skifield, also on Mt. Ruapehu. It is possible to traverse from one field to the other. The two are operated together, with a combined lift ticket for both fields. Together, they are considered to be the largest ski resort in New Zealand and possibly the southern hemisphere. On a good day it is possible to hike to the top of the mountain with skis or snowboard in hand, view the
Crater Lake Crater Lake ( Klamath: ''Giiwas'') is a volcanic crater lake in south-central Oregon in the western United States. It is the main feature of Crater Lake National Park and is famous for its deep blue color and water clarity. The lake partly fill ...
, and then ski back down to the field, or to Whakapapa. Also on a clear day
Mount Taranaki Mount Taranaki (), also known as Mount Egmont, is a dormant stratovolcano in the Taranaki region on the west coast of New Zealand's North Island. It is the second highest point in the North Island, after Mount Ruapehu. The mountain has a seco ...
can be seen. In 1995, skiers were evacuated from the skifield when a small volcanic eruption occurred at the crater lake, ejecting rocks, ash and steam. In 2007, a high speed six-seater
chairlift An elevated passenger ropeway, or chairlift, is a type of aerial lift, which consists of a continuously circulating steel wire rope loop strung between two end terminals and usually over intermediate towers, carrying a series of chairs. Th ...
, the High Noon Express was installed, replacing an existing
T-bar A surface lift is a type of cable transport for snow sports in which skiers and snowboarders remain on the ground as they are pulled uphill. While they were once prevalent, they have been overtaken in popularity by higher-capacity and higher-co ...
to the top of the mountain. The lift had several faults after being installed, such as cable derailments. In winter of 2010, two pylons on the lift collapsed, and the lift was redesigned with 15 new shorter pylons instead of 10 higher pylons in the original design and was open 2011 season. The redesign required relocating an older fixed grip quad chair which previously passed under the lift.


Voluntary administration

In 2022 following a poor snow season attributed largely to
climate change In common usage, climate change describes global warming—the ongoing increase in global average temperature—and its effects on Earth's climate system. Climate change in a broader sense also includes previous long-term changes to ...
, Ruapehu Alpine Lifts, the parent company of both Whakapapa and Turoa skifields, entered voluntary administration in an attempt to avoid bankruptcy. The company is a not-for-profit business that was established by members of ski clubs in 1953. In August 2022, Ruapehu Alpine Lifts laid off 130 workers and its total debt climbed to over NZ$30 million. The financial situation of Ruapehu Alpine Lifts deteriorated rapidly following disruptions from the
COVID-19 pandemic The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identi ...
. Efforts to secure additional funds from investors or the New Zealand government initially failed. However, in December 2022, the government provided a $6 million loan to Ruapehu Alpine Lifts, to help ensure that both Ruapehu skifields could operate in winter 2023. This was in addition to $15 million provided in 2018 from the Provincial Growth Fund.


Lifts

There are three proposed ski lifts at Turoa, which are due to be complete before 2030. A new Quad express set to be positioned west of the high noon express, to give better access to where the old Jumbo T-Bar used to operate near. The existing Giant fixed grip chairlift is set to be replaced by a new detachable quad express. A gondola is planned to be constructed on Turoa, replacing both the Parklane and Movenpick chairs, starting at the base area and terminating at the location of the top station of the Movenpick chair with a mid station allowing for access to the Wintergarden beginners area. The lifts are capable of taking up to 11,300 people per hour on a busy day, the second most of any ski area in New Zealand, behind Whakapapa. A new high speed six-seater
chairlift An elevated passenger ropeway, or chairlift, is a type of aerial lift, which consists of a continuously circulating steel wire rope loop strung between two end terminals and usually over intermediate towers, carrying a series of chairs. Th ...
was added for the winter of 2007, replacing an existing
t-bar A surface lift is a type of cable transport for snow sports in which skiers and snowboarders remain on the ground as they are pulled uphill. While they were once prevalent, they have been overtaken in popularity by higher-capacity and higher-co ...
to the top of the mountain.