The TransWest Express Transmission Line Project (TWE) is a planned bipolar HVDC transmission line between Rawlins, Wyoming and
Marketplace substation The Marketplace substation is a major electric power interconnection point in the western United States outside of Boulder City, Nevada. The station is in the Eldorado Valley. Interconnects * 500 kV McCullough substation * 500 kV AC Adelanto s ...
near Las Vegas.


Description

The TWE is designed as a bipolar 600kV overhead power line long, and can transfer a maximum power of 3,000 megawatts at ±600 kV. HVDC lines such as Path 27 and the Pacific DC Intertie can be distinguished by having two transmission wires, rather than the three necessary for transmission of three phase AC power. The TWE is one of 7 projects tracked by the federal Rapid Response Team for Transmission. Gateway West and Hemingway are two other projects intended to transmit power between Wyoming and the Pacific West Coast. Although the line ends in Nevada, there is around 10 GW transmission capacity between Las Vegas and San Diego/ Los Angeles in
Path 46 Path 46, also called West of Colorado River, Arizona-California West-of-the-River Path (WOR), is a set of fourteen high voltage (500 kV & 230 kV) alternating-current transmission lines that are located in southeast California and Nevada up to ...
, enabling power to continue to the west coast.


History

TWE started in 2005 when the
Arizona Public Service Company Arizona Public Service (APS) is the largest electric utility in Arizona, United States. Since 1985, it has been the principal subsidiary of publicly traded S&P 500 member Pinnacle West Capital Corporation, known as AZP Group until 1987. Pinnacl ...
investigated ways of transferring power from the Rocky Mountains to the west. In 2008 The Anschutz Corporation acquired the project, and Western Area Power Administration became a partner in 2010. Anschutz also owns the
Chokecherry and Sierra Madre Wind Energy Project The Chokecherry and Sierra Madre Wind Energy Project is large-scale wind farm located near Rawlins, Wyoming, currently under construction. If completed as scheduled in 2026, it is expected to become the largest wind farm in the United States and ...
(CCSM) near the Wyoming terminal; an area which has a wind capacity factor around 46%. The
Bureau of Land Management The Bureau of Land Management (BLM) is an agency within the United States Department of the Interior responsible for administering federal lands. Headquartered in Washington DC, and with oversight over , it governs one eighth of the country's la ...
(BLM) issued environmental approval in December 2016, and WAPA did so in January 2017. The Zephyr Power Transmission Project is a similar project of bringing Wyoming wind power to California, with an optional storage facility in Utah. The Gateway West Transmission Line between Glenrock, Wyoming and Idaho also received approval. TWE, CCSM and the Plains&Eastern powerline are being considered by the US Administration.


Economy

The line is expected to cost $3 billion. Due to California's RPS requirement of 33% by 2020, NREL analysts estimate that the line saves $500 million to around $1 billion per year for Californian consumers, compared to Californian alternatives. NREL calculates that TWE has a benefit-cost ratio (BCA) between 1.62 and 3.62 if delivering 12 TWh/year with a transmission cost of $29 per MWh.D. Corbus, D. Hurlbut, P. Schwabe, E. Ibanez, M. Milligan, G. Brinkman, A. Paduru, V. Diakov, and M. Hand.
California-Wyoming Grid Integration Study
, page vi-xii. '' National Renewable Energy Laboratory'', March 2014. NREL/TP-6A20-61192
If transmission utilities use a BCA-threshold, they must set it at 1.25 or lower to find out if projects are feasible. The power from Wyoming is eligible for Californian subsidy because TWE delivers it to the Californian grid, "at the doorstep" of California, near Las Vegas. Californian power prices are usually around $45 to $65/MWh.


Route

The northern terminal and substation converting from alternating current to direct current is expected to be south of Rawlins in Wyoming, near the Chokecherry wind farm. The line then runs south of the Uinta Mountains through Colorado and Utah. The Colorado section has been criticized as disturbing for
sage-grouse Sage-grouse are grouse belonging to the bird genus ''Centrocercus.'' The genus includes two species: the Gunnison grouse (''Centrocercus minimus'') and the greater sage-grouse (''Centrocercus urophasianus''). These birds are distributed through ...
. The DC line has only two connection points, one at each end. Utah attempted to legislate a requirement to reserve 25% capacity for power from Utah, but lobbying by TWE kept full capacity to TWE. The part of the line that travels between Delta in Utah and Las Vegas shares its route with Path 27 (Intermountain line). Delta may become a connection point in the future. The southern terminal and substation to convert back from DC to AC is at the Marketplace substation south of Las Vegas and
Boulder, Nevada Boulder City is a city in Clark County, Nevada, United States. It is approximately southeast of Las Vegas. As of the 2020 United States Census, 2020 census, the population of Boulder City was 14,885. The city took its name from Boulder Canyon ( ...
.


See also

* High-voltage direct current * List of HVDC projects * WECC Intertie Paths


References


External links

*
How new transmission will bring Wyoming wind to California
{{Energy resource facilities in Nevada Western Interconnection HVDC transmission lines