HOME

TheInfoList



OR:

The Techren Solar Project is a 400 
megawatt The watt (symbol: W) is the unit of Power (physics), power or radiant flux in the International System of Units, International System of Units (SI), equal to 1 joule per second or 1 kg⋅m2⋅s−3. It is used to quantification (science), ...
(MW AC) solar
photovoltaic power plant A photovoltaic power station, also known as a solar park, solar farm, or solar power plant, is a large-scale grid-connected photovoltaic power system (PV system) designed for the supply of merchant power. They are different from most building ...
near
Boulder City, Nevada Boulder City is a city in Clark County, Nevada, United States. It is approximately southeast of Las Vegas. As of the 2020 United States Census, 2020 census, the population of Boulder City was 14,885. The city took its name from Boulder Canyon ( ...
. Electricity production began with completion of the two building phases in 2019–2020. The project is co-located with several other large
solar power Solar power is the conversion of energy from sunlight into electricity, either directly using photovoltaics (PV) or indirectly using concentrated solar power. Photovoltaic cells convert light into an electric current using the photovoltaic e ...
projects in the
Eldorado Valley Eldorado Valley, or El Dorado Valley, is a Great Basin valley in the Mojave Desert southeast of Las Vegas and southwest of Boulder City, Nevada. The valley is endorheic, containing the Eldorado Dry Lake. The Great Basin Divide, transects ridgelines ...
.


Project details

The project was originally founded and developed by SECP (Sustainable Energy Capital Partners) and further developed by 174 Power Global, the US subsidiary of the South Korean company,
Hanwha Group , former_name = Korea Explosives Group , type = Public , traded_as = , industry = Conglomorate , founded = , founder = Kim Chong-hee , hq_location_city = Seoul , hq_location_country = South Korea , area_served = Global , key_people = K ...
. The project was constructed in two phases: the 100 MW Techren 1 began in 2017 and the 200 MW Techren 2 began in 2018.Techren Solar
174 Power Global
Both units are built to a 1.5 kVdc maximum system voltage standard. This increase from the previous 1.0 kVdc standard enables the inverter to operate at higher efficiency and reliability, and is expected to reduce overall
balance of system The balance of system (BOS) encompasses all components of a photovoltaic system other than the photovoltaic panels. This includes wiring, switches, a mounting system, one or many solar inverters, a battery bank and battery charger. Other optiona ...
costs over the lifetime of the facility.
Swinerton Renewable Energy Swinerton is a commercial construction company that provides services in the United States for commercial office, retail, multi-family residential, hospitality, healthcare, education, energy, and the entertainment sectors. The company also provide ...
was the EPC contractor, and Clenera provided
asset management Asset management is a systematic approach to the governance and realization of value from the things that a group or entity is responsible for, over their whole life cycles. It may apply both to tangible assets (physical objects such as buildings ...
services. Project completion in September 2019 was as scheduled.
NV Energy NV Energy is a public utility which generates, transmits and distributes electric service in northern and southern Nevada, including the Las Vegas Valley, and provides natural gas service in the Reno–Sparks metropolitan area of northern Nevada ...
is purchasing the electricity from both facilities, which are eligible for further customer participation under th
NV GreenEnergy Rider opportunity
As with Boulder Solar and the Fort Churchill Solar Array,
Apple Inc. Apple Inc. is an American multinational technology company headquartered in Cupertino, California, United States. Apple is the largest technology company by revenue (totaling in 2021) and, as of June 2022, is the world's biggest company ...
helped to motivate the project through participation of its northern Nevada
data center A data center (American English) or data centre (British English)See spelling differences. is a building, a dedicated space within a building, or a group of buildings used to house computer systems and associated components, such as telecommunic ...
s in the program. An additional 100 MW was developed: the 25 MW Techren 3, the 25 MW Techren 4 which were completed in October 2020, and the 50 MW Techren 5 completed in December 2020.


See also

*
Nevada Solar One Nevada Solar One is a concentrated solar power plant, with a nominal capacity of 64 Watt, MW and maximum steam turbine power output up to 72 MW net (75 MW gross), spread over an area of . The projected Carbon dioxide, CO2 emissions ...
* Copper Mountain Solar *
List of photovoltaic power stations The following is a list of photovoltaic power stations that are larger than 300 megawatts (MW) in current net capacity.Note that nominal power may be AC or DC, depending on the plant, and therefore any totals quoted are hybrid. SeAC-DC conundru ...
*
List of power stations in Nevada This is a list of electricity-generating power stations in the U.S. state of Nevada, sorted by type and name. In 2019, Nevada had a total summer capacity of 11,938 MW through all of its power plants, and a net generation of 39,890 GWh. The cor ...
*
Solar power plants in the Mojave Desert There are several solar power plants in the Mojave Desert which supply power to the electricity grid. Insolation (solar radiation) in the Mojave Desert is among the best available in the United States, and some significant population centers ar ...
*
Solar power in Nevada Solar power in Nevada is growing due to a Renewable Portfolio Standard which requires 50% renewable energy by 2030. The state has abundant open land areas and some of the best solar potential in the country. Solar power plants The number and ...


References

Solar power in the Mojave Desert Buildings and structures in Boulder City, Nevada Solar power stations in Nevada Photovoltaic power stations in the United States {{renewable-power-plant-stub