HOME

TheInfoList



OR:

The Siemens S200 is a
high-floor High-floor describes the interior flooring of commuter vehicles primarily used in public transport such as trains, light rail cars and other rail vehicles, along with buses and trolleybuses. Interior floor height is generally measured above the ...
light rail vehicle (LRV) manufactured by
Siemens Mobility Siemens Mobility GmbH is a separately-managed company of Siemens, arising from a corporate restructuring effective 1 August 2018. With its global headquarters in Munich, Siemens Mobility has four core business units: Mobility Management, dedi ...
in Florin, California. The S200 succeeds the SD-100, SD-160, SD-400 and SD-460 as the high-floor light rail vehicle for the
North American North America is a continent in the Northern Hemisphere and almost entirely within the Western Hemisphere. It is bordered to the north by the Arctic Ocean, to the east by the Atlantic Ocean, to the southeast by South America and the ...
market and is being manufactured and marketed alongside the low-floor
Siemens S700 The Siemens S70, its successor the S700 and European variant, the Avanto, are a series of low-floor light-rail vehicles (LRV) and streetcars manufactured by Siemens Mobility, a division of German conglomerate Siemens AG. The S70 and S700 are ...
.


Operators


Calgary

In September 2013, 60 light rail vehicles were ordered, costing $200 million, for the
Calgary Calgary ( ) is the largest city in the western Canadian province of Alberta and the largest metro area of the three Prairie Provinces. As of 2021, the city proper had a population of 1,306,784 and a metropolitan population of 1,481,806, maki ...
CTrain CTrain (previously branded C-Train) is a light rail rapid transit system in Calgary, Alberta, Canada. Most of the network functions as a light metro, though in the free-fare zone that runs through the downtown core the Red and Blue lines oper ...
; the order was later slightly expanded to 63 LRVs at a cost of $201.6 million. The first car was delivered on January 6, 2016. Later, an additional 6 cars were ordered. The first of this order was delivered in May 2019 and was put into service on July 11, 2019. In February 2020, 15 more LRVs were ordered bringing the total fleet to 84 S200 LRVs. The new cars feature a host of new and upgraded technologies. Heated floors and triple-pane windows were added to combat Calgary's harsh winter climate, as well as sloped entryways to eliminate moving ramps found on older trains. A new speaker system adjusts the volume output depending on the amount of passengers in each car. Dynamic interior LED lights adjust to become brighter when its dark and dimmer when light is shining through the windows. The end doors were moved back to improve passenger flow and include LED lights to indicate if a door can be opened or if it is closing/locked. New infotainment systems were added alongside LED info signs to display next stop and line information. It is also capable of showing advertisements, although it has not been implemented yet. Some of these features (LCD information screens, security cameras, LED exterior signs) have been implemented on the refurbished Siemens SD-160 cars as part of mid-lifecycle refurbishment.


San Francisco

Siemens have designated the S200 light rail vehicles for San Francisco as S200 SF; internally, the
San Francisco Municipal Transportation Agency The San Francisco Municipal Transportation Agency (SFMTA or San Francisco MTA) is an agency created by consolidation of the San Francisco Municipal Railway (Muni), the Department of Parking and Traffic (DPT), and the Taxicab Commission. The age ...
have designated them LRV4, succeeding prior LRV designs from
Boeing-Vertol Boeing Rotorcraft Systems (formerly Boeing Helicopters and before that Boeing Vertol) is the former name of an American aircraft manufacturer, now known as Vertical Lift division of Boeing Defense, Space & Security. The headquarters and main r ...
( LRV1) and
AnsaldoBreda Hitachi Rail Italy S.p.A. is a multinational rolling stock manufacturer company based in Pistoia, Italy. Formerly AnsaldoBreda S.p.A., a subsidiary of state-owned Finmeccanica, the company was sold in 2015 to Hitachi Rail of Japan. After the ...
(LRV2 and LRV3). The initial contract ordered 175 LRVs, totalling $648 million, for
San Francisco San Francisco (; Spanish for " Saint Francis"), officially the City and County of San Francisco, is the commercial, financial, and cultural center of Northern California. The city proper is the fourth most populous in California and 17t ...
's
Muni Metro Muni Metro is a light rail system serving San Francisco, California, United States. Operated by the San Francisco Municipal Railway (Muni), a part of the San Francisco Municipal Transportation Agency (SFMTA), Muni Metro served an average of 15 ...
in September 2014. Option 1 for an additional 40 was exercised in June 2015 at an anticipated cost of $176 million. Four more LRVs were ordered in June 2017 for $16 million to handle an expected increase in traffic after the
Golden State Warriors The Golden State Warriors are an American professional basketball team based in San Francisco. The Warriors compete in the National Basketball Association (NBA), as a member of the league's Western Conference Pacific Division. Founded in 194 ...
move to the
Chase Center Chase Center is an indoor arena in the Mission Bay neighborhood of San Francisco, California. The building is the home venue for the Golden State Warriors of the National Basketball Association (NBA) and occasionally for the University of San ...
in 2019. Option 2 was partially exercised to order an additional 30 in August 2021 for $130 million.draft (PDF)
/ref> The remainder of Option 2 (which was for up to 45 additional) was forfeited. This makes the total firm orders 249 LRVs. The order is divided into a "replacement fleet" of 151 LRVs to replace Muni's existing fleet of Breda LRV2/3s, a "future fleet" of 68 to accommodate expanded ridership after the completion of the Central Subway and Chase Center, and a "second expansion fleet" of 30. Deliveries of the "future fleet" began in January 2017. The first Muni unit entered service on November 17, 2017. The "future fleet" deliveries completed in October 2019. Deliveries of LRVs for the "replacement fleet" are scheduled to begin in 2021.


Reliability

One of the primary concerns for the LRV4 fleet in San Francisco was improving the
mean distance between failures Failure rate is the frequency with which an engineered system or component fails, expressed in failures per unit of time. It is usually denoted by the Greek letter λ (lambda) and is often used in reliability engineering. The failure rate of a ...
(MDBF) compared to the existing Breda LRV2/3 fleet. The Breda fleet was able to achieve an MDBF of in fiscal years 2005 and 2006; the contract with Siemens called for a MDBF of . When they were initially placed in service, the Siemens LRV4 had a MDBF of , improving to by January 2020.


Seating

Ridership surveys and SFMTA staff recommendations resulted in an all-longitudinal seating configuration for the initial "future fleet" delivery of 68 LRVs, where seats are placed along the long sides of the car, rather than lateral seating, where seats face the front and back of the vehicle. The longitudinal seating creates wider aisles, is preferred by advocates for the disabled, provides more room for standing passengers, and may accommodate bicycles on board, as the bicycle policy only allows folding bikes on board. However, in "future fleet" of 68 LRV4s, the long benches were flat and lacked the individual seating pockets used in the Breda longitudinal benches. In a November 2019 report, Muni provided details for a retrofit of the already-delivered "future fleet": half the flat longitudinal benches will be replaced with single transverse seats, and the other half will be replaced with individual longitudinal seats. For the "replacement fleet" of 151 cars, 50 will be delivered with seating to match the retrofitted "future fleet" of 68; the remaining 101 will have double transverse seats instead of the single transverse seats. The seats also will be lowered, enabling riders shorter than to rest their feet on the floor.


Doors

In April 2019, funding for additional cars was suspended after two notable incidents were reported in local media. The ''San Francisco Examiner'' reported that on April 12, after a passenger's hand became trapped in the door, she was dragged along as the car departed the station platform; although she managed to pull herself free, she then lost her balance, fell from the platform, striking the train, and landed unconscious on the tracks. It was the fourth reported incident where passengers were trapped by doors on the LRV4; of those, two resulted in injuries. As a temporary measure, the rear doors on LRV4s were locked shut to prevent additional trapped passengers; the
San Francisco Board of Supervisors The San Francisco Board of Supervisors is the legislative body within the government of the City and County of San Francisco. Government and politics The City and County of San Francisco is a consolidated city-county, being simultaneously a c ...
voted to withhold $62 million for additional cars approximately one week after the door and shear pin issues. Muni began testing a fix to the single panel doors on May 16, car no. 2036 began testing the improved sensitive edges, with one operator driving and another monitoring the rear door. Muni announced the fixes to the doors had been implemented successfully and normal operation resumed in June 2019. In the original door sensor design, only one sensing strip was installed on the interior surface of the door edge to detect objects or hands; two more edge strips were added to fix the issue, both on the exterior surface of the door edge.


Couplers

In a separate incident which also occurred on April 12, a shear pin failed at the yard when a two-car train was being uncoupled after leaving service for the day. Each coupler is designed with two shear pins; the shear pin is designed to break to protect the coupling mechanism. An inspection found another shear pin had failed on another uncoupled car; Muni suspended coupled operation of the LRV4s as a result. The door and coupler issues prompted the
California Public Utilities Commission The California Public Utilities Commission (CPUC or PUC) is a regulatory agency that regulates privately owned public utilities in the state of California, including electric power, telecommunications, natural gas and water companies. In addition ...
to launch an investigation. More extensive inspections later showed that approximately of the couplers had some degree of damage or defect. The center of the coupler is maintained at a height of above top of rail, typically by shimming the truck relative to the carbody after truing the wheels, not by adjusting the coupler; the coupler adjustment screw is designed to change the inclination of the coupler, not the height. Unclear instructions led to adjustment of the coupler height via the inclination screw; this in turn pushed the coupler lateral stop bracket out of position, enabling excessive lateral travel, which caused the shear pins to break. Maintenance instructions were updated, the lateral stop bracket assembly was redesigned, and the travel of the coupler adjustment screw was limited to fix the issue. The redesigned couplers went into service in June 2019. In December 2019, Muni announced it would run uncoupled cars again because the new shear pins became unreliable after three months' use; a redesign was being studied. The issue was discovered after a shear pin failed in fatigue; although the two cars remained coupled, the operator "felt like her train was being continually rear ended". Siemens reported the issue affects all 68 cars in the "future fleet". Siemens and the manufacturer of the couplers,
Voith The Voith Group is a German manufacturer of machines for the pulp and paper industry, technical equipment for hydropower plants and drive and braking systems. The family-owned company, which operates worldwide and has its headquarters in Heid ...
, identified potential causes for the fatigue failure of the shear pins. The existing design is sufficient to allow coupled operation of the cars for at least 90 days, and new shear pins were being provided as a warranty item until the issue has been resolved. The shear pins were failing due to the sudden change in gradient at intersections.


Brakes

At the Board of Supervisors meeting in April 2019, Muni officials also reported the wheels on the LRV4s required resurfacing before their expected end-of-life because of the use of emergency brakes, which are engaged once a week, on average. At any given time, only half (or fewer) of the LRV4s were available for service because of wheels with flat spots caused by emergency braking. In typical operation, the LRV is both accelerated and braked using a "T" handle controller at the operator's left hand; an emergency stop can be commanded using either the red 'mushroom button' on the forward control panel, or by the "T" handle. For the Breda LRV2/3, the "T" handle is pulled out and twisted 90 degrees for the emergency stop; for the Siemens LRV4, the "T" handle is only pulled out. This difference meant that for the Breda LRVs, it was usually quicker to use the 'mushroom button' to command an emergency stop; there was essentially no difference for the Siemens LRVs. Because the 'stick' brakes on the prior Breda LRV2/3 cars were prone to failure, operators were trained to use the 'mushroom button' when encountering obstacles on the tracks. However, using the 'mushroom button' on the LRV4s, as operators were trained, locked-up the wheelsThe Siemens LRV4 lock up the wheels during an emergency stop using the 'mushroom', but do not lock up the wheels when using the "T" handle for an emergency stop. The Breda LRV2/3 do not lock up the wheels in an emergency stop when using either the "T" handle or the 'mushroom'. and flattened the wheel surface. A plan was announced in November 2019 to add
track brake A magnetic track brake (Mg brake) is a brake for rail vehicles. It consists of brake magnets, pole shoes, a suspension, a power transmission and, in the case of mainline railroads, a track rod. When current flows through the magnet coil, the ma ...
s to the powered end trucks; the design for the track brakes was submitted to the CPUC for approval. Track brakes were already equipped on the center (unpowered) truck, but the combination of the wheel brakes and the existing single-truck track brake led to flat-spotting the wheels each time an emergency stop was commanded. Testing of an LRV4 retrofitted with additional track brakes showed the rate of flat-spotting wheels during emergency stops fell from nearly 100% to just 0.4%.


References


External links

{{commons category-inline Light rail vehicles Siemens tram vehicles Electric multiple units of the United States Articulated passenger trains 600 V DC multiple units CTrain Muni Metro Train-related introductions in 2015 Electric multiple units of Canada Siemens multiple units