HOME

TheInfoList



OR:

The Sam Rayburn Tollway (formerly the State Highway 121 Tollway) is a tollway operated by the
North Texas Tollway Authority The North Texas Tollway Authority (NTTA) is an organization that maintains and operates toll roads, bridges, and tunnels in the North Texas area. Functioning as a political subdivision of the State of Texas under Chapter 366 of the Transp ...
that runs from Grapevine to McKinney. Its frontage road are signed State Highway 121. The original portion of the toll road from Business 121 near Coppell to FM 2281 opened in May 2006, and toll collection started December 1 of that year. The tolled portion extended to Hillcrest Road in Plano/Frisco on August 31, 2008. The tollway was extended to Custer Road on September 1, 2009, and again to Hardin Boulevard in McKinney on October 1, 2009. The tollway (formerly named 121 Tollway) was renamed in honor of
Sam Rayburn Samuel Taliaferro Rayburn (January 6, 1882 – November 16, 1961) was an American politician who served as the 43rd speaker of the United States House of Representatives. He was a three-time House speaker, former House majority leader, two-time ...
at a North Texas Tollway Authority meeting on March 16, 2009. The tollway also currently features two five-level stack interchanges, at Dallas North Tollway and Interstate 35E /US 77.


History

The Sam Rayburn Tollway project was divided into five segments, all of which have been completed. * Segment 1, from Denton Tap Road to Old Denton Road, opened to traffic in July 2006. * Segment 2, which runs from Old Denton Road to Hillcrest Road, officially opened to traffic on September 1, 2008, when NTTA took full responsibility for Segments 1 and 2 as well as the operation, maintenance and construction of the remaining segments of the SRT. * NTTA contractors began work on Segment 3 of the SRT in March 2008. On September 1, 2009, the NTTA opened the main lanes from Hillcrest Road to just east of Custer Road. On September 29, 2009, the NTTA opened the main lanes from just east of Custer Road to west of Hardin Boulevard. * Segment 4 encompasses the Sam Rayburn Tollway/U.S. 75 interchange, from west of Hardin Boulevard to just east of U.S. 75. Construction on this portion of the corridor began in December 2008. Four major direct-connecting ramps were open to traffic in December 2010. The last two ramps were opened in March 2011. * The Sam Rayburn Tollway/Dallas North Tollway interchange is referred to as Segment 5. The NTTA began construction on Segment 5 in February 2010. It was completed in 2012.


Exit list

Almost all exits include access to SH 121, which follows the
frontage road A frontage road (also known as an access road, outer road, service road, feeder road, or parallel road) is a local road running parallel to a higher-speed, limited-access road. A frontage road is often used to provide access to private drive ...
s. Due to the nearly continuous frontage road, most exits on the Tollway serve more than one roadway.


References


External links


A YouTube video
sponsored by the NTTA as the official tour (from Grapevine to McKinney) {{Toll Roads in Texas Toll roads in Texas Transportation in Denton County, Texas Transportation in Dallas County, Texas Transportation in Collin County, Texas