The Subansiri Lower Dam, officially named Subansiri Lower Hydroelectric Project (SLHEP), is an under construction
gravity dam A gravity dam is a dam constructed from concrete or stone masonry and designed to hold back water by using only the weight of the material and its resistance against the foundation to oppose the horizontal pressure of water pushing against it. ...
on the
Subansiri River The Subansiri River; is a trans- Himalayan river and a tributary of the Brahmaputra River that flows through Tibet's Lhünzê County, Shannan Prefecture and the Indian states of Arunachal Pradesh and Assam. The Subansiri is long, with a draina ...
in North Eastern India. It is located upstream of Subansiri River on
Arunachal Pradesh Arunachal Pradesh (, ) is a state in Northeastern India. It was formed from the erstwhile North-East Frontier Agency (NEFA) region, and became a state on 20 February 1987. It borders the states of Assam and Nagaland to the south. It shares int ...
. Described as a run-of-the-river project by
NHPC Limited NHPC Limited (erstwhile National Hydroelectric Power Corporation ) is an Indian government hydropower board under the ownership of Ministry of Power, Government of India that was incorporated in the year 1975 with an authorised capital ...
, the Project is expected to supply 2,000 MW of power when completed. The project has experienced several problems during construction to include landslides, re-design and opposition. It was expected to be complete in 2018. It is notable that, if completed as planned, it will be the largest hydroelectric project in India. As of early 2019, work was not progressing on either of the two major dam projects in the Assam region, the
Dibang Dibang (Hindi: दिबांग) is a senior news anchor former host of daily prime-time show 'Jan Man' and weekly show 'Press Conference' on the Hindi news channel ABP News. A member of debate panels of the channel, he is rated among the ...
and the Lower Subansiri. After clearance of ‘Subansiri Lower Project’ by Hon’ble NGT vide its Order dated: 31.07.2019, Main works of the Dam has been resumed on 15.10.2019.


Design

The concrete
gravity dam A gravity dam is a dam constructed from concrete or stone masonry and designed to hold back water by using only the weight of the material and its resistance against the foundation to oppose the horizontal pressure of water pushing against it. ...
is designed to be tall, measured from the river bed and from the deepest foundation. Its length will be and the dam will have a structural volume of . The reservoir created by the dam will have a gross storage capacity of , of which can be used for power generation or irrigation. At normal level, the reservoir's surface will cover . The surface powerhouse, located on the right bank, will contain eight 250 MW
Francis turbine The Francis turbine is a type of water turbine. It is an inward-flow reaction turbine that combines radial and axial flow concepts. Francis turbines are the most common water turbine in use today, and can achieve over 95% efficiency. The proces ...
generators using 86 m design head out of 91 m gross head available. There will be eight horse shoe shaped
head race A head race is a time-trial competition in the sport of rowing. Head races are typically held in the fall, winter and spring seasons. These events draw many athletes as well as observers. In this form of racing, rowers race against the clock wh ...
tunnels, each being in diameter and having a length from . There will be eight horse Shoe shaped surge tunnels, each being in diameter and having length from . There will be eight horse shoe/circular shaped penstocks with varying diameters of and lengths of. The tail race channel, which will transfer water discharged by the turbines back to the river, is wide and long.


Construction

Construction of Subansiri Lower Project involves many challenges. These include land not being available when construction was scheduled to commence, a limited annual construction time because of monsoons (from mid-April to mid-October), the need to handle high flood flows and poor rock conditions. The design of the dam has undergone drastic and repeated revisions that have affected the schedule and planning of the construction work. In December 2003 the contract to build the dam and its associated structures was awarded to a consortium of Boguchandgesstroy, Soyuzgidrosptsstry and Soma Enterprise Ltd. Due to difficulties acquiring land around the site, construction could not begin in earnest until 13 months after the contract was awarded. Unexpected geological conditions at the dam site led to landslides and slower tunnel excavation. By November 2007, the river was successfully diverted and in April of the next year, the foundation was clear for construction. Before the foundation was fully prepared it was discovered that bedrock was reached sooner than expected. This led to an alteration in the dam's design for stability. While the dam was being re-designed, concrete was placed over the foundation to protect it from the upcoming monsoon floods as the
cofferdam A cofferdam is an enclosure built within a body of water to allow the enclosed area to be pumped out. This pumping creates a dry working environment so that the work can be carried out safely. Cofferdams are commonly used for construction or re ...
s stood a good chance of not protecting the foundation from the strong floods. The re-design was completed in October 2008 and soon after the foundation was once again cleared. In May 2009, work was suspended because of the monsoon season and re-commenced in November of that year. As of November 2011, the dam reached an elevation of , just below the spillway elevation of . On 16 December 2011, construction equipment was halted by protests. The construction cost has gone up by about 1,200 crore owing to forced suspension of work since December 2011. NHPC has already spent about 6,600 crore, according to a status report prepared by the company. Officially expected to be competed in January 2023, the hydroelectric generators will begin generating 500 MW of electricity, gradually increasing to 2000 MW.


Environmental impact

Some
environmental impacts Environmental issues are effects of human activity on the biophysical environment, most often of which are harmful effects that cause environmental degradation. Environmental protection is the practice of protecting the natural environment on t ...
unique to very large dams will result from completion of the Subansiri Project, both upstream and downstream of the dam site. These impacts will include ecosystem damage and loss of land. The reservoir of the Subansiri Project will submerge a length of the Subansiri river and occupy which includes Himalayan subtropical pine forests, Himalayan subtropical broadleaf forests, part of the Tale Valley Wildlife Sanctuary, an elephant corridor and some
subsistence agriculture Subsistence agriculture occurs when farmers grow food crops to meet the needs of themselves and their families on smallholdings. Subsistence agriculturalists target farm output for survival and for mostly local requirements, with little or no su ...
fields. Thirty eight families will be displaced if the dam is completed, according to official data. ;Downstream Water flow downstream will be regulated by the dam which is expected to result in low releases (6 m3/s) during winter and very high releases (2,560 m3/s) when energy is being generated. The project has met stiff resistance from several groups including All Assam Students’ Union and the
Krishak Mukti Sangram Samiti Krishak Mukti Sangram Samiti (KMSS) is a peasant organisation based in Assam. Formed by the RTI activist Akhil Gogoi in 2005, the organisation works on a diverse range of issues from Public Distribution System (PDS) thefts, non-implementation of Nat ...
, who are apprehensive about safety and the project’s downstream impact.


References

{{Power Plants of North-east India Dams in Arunachal Pradesh Dams in Assam Dams under construction Dams in the Brahmaputra River Basin Proposed infrastructure in Arunachal Pradesh