Southwold Railway
   HOME

TheInfoList



OR:

The Southwold Railway was a narrow gauge railway line between
Halesworth Halesworth is a market town, civil parish and electoral ward in north-eastern Suffolk, England. The population stood at 4,726 in the 2011 Census. It lies south-west of Lowestoft, on a tributary of the River Blyth, upstream from Southwold. T ...
and
Southwold Southwold is a seaside town and civil parish on the English North Sea coast in the East Suffolk district of Suffolk. It lies at the mouth of the River Blyth within the Suffolk Coast and Heaths Area of Outstanding Natural Beauty. The town is ...
in the
English English usually refers to: * English language * English people English may also refer to: Peoples, culture, and language * ''English'', an adjective for something of, from, or related to England ** English national ide ...
county of Suffolk. long, it was
narrow gauge A narrow-gauge railway (narrow-gauge railroad in the US) is a railway with a track gauge narrower than standard . Most narrow-gauge railways are between and . Since narrow-gauge railways are usually built with tighter curves, smaller structu ...
. It opened in 1879 and closed in 1929. Intermediate stations were at
Wenhaston Wenhaston is a village situated to the south of the River Blyth in northeastern Suffolk, England. In 2018 it had an estimated population of 563. History Roman coins, pottery and building materials unearthed in local fields indicate the existen ...
,
Blythburgh Blythburgh is a village and civil parish in the East Suffolk district of the English county of Suffolk. It is west of Southwold and south-east of Halesworth and lies on the River Blyth. The A12 road runs through the village which is split ...
and
Walberswick Walberswick is a village and civil parish on the Suffolk coast in England. It is at the mouth of the River Blyth on the south side of the river. The town of Southwold lies to the north of the river and is the nearest town to Walberswick, around ...
.


Route

The route closely followed the River Blyth, with Halesworth and Southwold both on the north side, but the longest section, including the intermediate stations, was on the south side. Although the line closed in 1929, its track was still marked and identified on a 1933
Ordnance Survey Ordnance Survey (OS) is the national mapping agency for Great Britain. The agency's name indicates its original military purpose (see ordnance and surveying), which was to map Scotland in the wake of the Jacobite rising of 1745. There was a ...
map. The line was lifted and the equipment was scrapped in 1941 to help with war efforts. Some track can still be found on the harbour branch and a surviving van is at the
East Anglia Transport Museum The East Anglia Transport Museum is an open-air transport museum, with numerous historic public transport vehicles (including many in full working order). It is located in Carlton Colville a suburb of Lowestoft, Suffolk. It is the only museu ...
. There is also a surviving (but derelict) coal shed at Blythburgh. Parts of the route from Southwold to
Blythburgh Blythburgh is a village and civil parish in the East Suffolk district of the English county of Suffolk. It is west of Southwold and south-east of Halesworth and lies on the River Blyth. The A12 road runs through the village which is split ...
are walkable, particularly through woodland known as the Heronry on the south shore of the Blyth estuary. The original bridge at Southwold was blown up during the war but its pillars now support a
footbridge A footbridge (also a pedestrian bridge, pedestrian overpass, or pedestrian overcrossing) is a bridge designed solely for pedestrians.''Oxford English Dictionary'' While the primary meaning for a bridge is a structure which links "two points at a ...
.


History

Southwold has had a harbour since at least Saxon times, but its importance as a port began to decline during the 19th century. In an attempt to reverse the declining fortunes of the town, the Corporation promoted it as a holiday resort, where bathing in private was available on the wide beaches. They expected the East Suffolk Railway from to to pass through the town, but it was built further inland, due in part to the underlying geology of the area. Although there was a horse bus service which ran to station once a day, this was not ideal, and a request was made to the railway company for a branch line to Southwold from Halesworth in 1855. The East Suffolk Railway were not prepared to build one, and several similar schemes were proposed over the next 20 years. The Southwold and Halesworth Tramway obtained an
Act of Parliament Acts of Parliament, sometimes referred to as primary legislation, are texts of law passed by the Legislature, legislative body of a jurisdiction (often a parliament or council). In most countries with a parliamentary system of government, acts of ...
in 1872, with the intention of building a steam tramway between the two towns, using the provisions of the Tramways Act 1870, but they failed to raise sufficient funds, and the project foundered. Still there were calls for a railway, and in October 1875 two public meetings were held. Mr Charles Easton of
Easton Hall Easton is a village in the South Kesteven district of Lincolnshire, England, almost north of Colsterworth, and east of the A1 road. It belongs to the civil parish of Stoke Rochford. History The village has no church, but forms part of the ...
chaired one in Halesworth, and the Earl of Stradbroke, who lived at
Henham Hall Henham Park is an historic estate in the parish of Wangford with Henham, situated north of the village of Blythburgh in the English county of Suffolk. The park is bordered to the east by the A12 road and to the west by the A145, the two roa ...
, chaired the other in Southwold. Both were local landowners, and they invited a civil engineer called Arthur C. Pain to speak, together with Richard C. Rapier, who was part of the engineering firm of
Ransomes & Rapier Ransomes & Rapier was a major British manufacturer of railway equipment and later cranes, from 1869 to 1987. Originally an offshoot of the major engineering company Ransome's it was based at Waterside Works in Ipswich, Suffolk. Ransome's split ...
. Both speakers suggested that a gauge railway would be considerably cheaper to build than a standard gauge one, and the meetings resulted in the formation of the Southwold Railway Company. Colonel Heneage Bagot-Chester was appointed as chairman, the two speakers became engineers, and the secretary was a local solicitor called H R Allen. The company obtained an Act of Parliament on 24 July 1876, to allow the line to be constructed. The main line was long, running from Southwold to Halesworth, and two branches were also authorised. A branch at Halesworth linked up with the Blyth Navigation, and there was a link to Blackshore Quay, between Southwold and
Walberswick Walberswick is a village and civil parish on the Suffolk coast in England. It is at the mouth of the River Blyth on the south side of the river. The town of Southwold lies to the north of the river and is the nearest town to Walberswick, around ...
, which was to be long. The company could raise £40,000 in working capital by issuing £10 shares, and also had powers to borrow a further £13,000 by issuing
debenture In corporate finance, a debenture is a medium- to long-term debt instrument used by large companies to borrow money, at a fixed rate of interest. The legal term "debenture" originally referred to a document that either creates a debt or acknowle ...
s. The gauge of the railway had to be at least , and because the line was covered by the
Regulation of Railways Act 1868 The Regulation of Railways Act 1868 is an Act of the Parliament of the United Kingdom. It is one of the Railway Regulation Acts 1840 to 1893. It was enacted following the first murder on the railways, that of Thomas Briggs by Franz Muller nea ...
, it could use a simple signalling system and light earthworks, providing loads were limited and speeds did not exceed . In practice, this meant that journey times between the two termini would be about 30 minutes, and trains were limited to 100 passengers. Following a report by C J Wall, a former manager of the Bristol and Exeter Railway, the gauge of was chosen. This would make the line somewhat more expensive to build, but it was thought that the increased carrying capacity would offset this. A prospectus was published on 3 November 1877, which mentioned that the company had agreed provisional contracts with Charles Chambers of Westminster, who would build the line and stations for £30,000, and with the Bristol Wagon & Carriage Works Co, who would supply the locomotives and rolling stock for £4,000. The company suffered upheaval around this time, as Allen, the secretary, resigned due to a conflict of interest, when he found himself representing local landowners in their negotiations with the railway. He was replaced by T H Jellicoe, who was joined on the board by the Mayor of Southwold and R C Rapier. Raising finance proved difficult, and when Chambers declined to enter into a proper contract until they were sure that purchase of the land was certain, most of the board resigned on 5 November 1877. Only Rapier and Bagot-Chester remained, to be joined by a new board, who were not local men, whereas all of the previous board except one had been residents of Halesworth. Board meetings moved to Rapier's London office, and he became chairman on 20 December 1877. Bagot-Chester resigned from the company on 29 January 1879, leaving a board that had no real commitment to the service of the community. Rapier worked energetically on the project, and £5,000 borrowed from the English & Foreign Credit Co enabled purchase of the land to begin. Contracts were re-negotiated, and construction work began on 3 May 1878. Sleepers were bought from Norway, and arrived by ship at Southwold harbour. The rails came from the Tredegar Iron Co, and also arrived at the harbour. Ransomes & Rapier supplied the signalling and switchgear, and a local blacksmith called Charlie List was responsible for much of the ironwork. The completed works were inspected by the Board of Trade on 19 September 1879, and a celebration lunch was held at the Swan Hotel on 23 September. Torrential rain that night caused significant flooding in Suffolk, and the line near Wenhaston Mill was submerged, but the official opening took place on 24 September, and the first train completed a return journey despite the water. Subsequent trains ran between Southwold and Wenhaston, as the flooding worsened. The intermediate stations at Walberswick and Blythburgh were not completed until later.


Operation

The railway was supplied with three locomotives for the opening, built by
Sharp, Stewart and Company Sharp, Stewart and Company was a steam locomotive manufacturer, initially located in Manchester, England. The company was formed in 1843 upon the demise of Sharp, Roberts & Co.. It moved to Glasgow, Scotland, in 1888, eventually amalgamating wit ...
. They had a
2-4-0 Under the Whyte notation for the classification of steam locomotives, represents the wheel arrangement of two leading wheels on one axle, four powered and coupled driving wheels on two axles and no trailing wheels. The notation 2-4-0T indi ...
wheel arrangement, and the design was similar to others that the company had supplied for light passenger work. Sharp Stewart also supplied rolling stock, and accepted debentures in part payment, only receiving one-third of the total cost in cash. Construction of the railway had cost £90,000, (), and the company applied to the Board of Trade for authority to raise more capital in 1880. Income from the operation of the trains did not produce enough surplus to keep paying the debenture interest, and in 1883 Sharp Stewart cancelled their arrangement, repossessing locomotive No. 1. The other two locomotives and the rest of the stock were then hired at £150 per year. In 1888, the company was authorised to raise another £10,000 in debentures, which was used to pay the arrears in interest on the existing debentures, and in 1890 enabled them to purchase the stock outright. In the first month of operation, the company applied to the Board of Trade for permission to run the line as a
light railway A light railway is a railway built at lower costs and to lower standards than typical "heavy rail": it uses lighter-weight track, and may have more steep gradients and tight curves to reduce civil engineering costs. These lighter standards allow ...
and this was granted on 11 March 1880. A maximum speed of was specified, and it was to be worked by
one engine in steam In railway signalling, a token is a physical object which a train driver is required to have or see before entering onto a particular section of single track. The token is clearly endorsed with the names of the section it belongs to. A token sys ...
. Operation of the swing bridge was achieved using an Annett's key, which was attached to the staff, which the working engine was required to carry. Passenger traffic for the first ten years was fairly static, at around 76,000 journeys per year, but goods traffic doubled to reach . The next ten years saw a steady increase, with passenger journeys rising to 100,000 by 1900, while of minerals and of parcels were carried. In order to cope with the increase, another locomotive was ordered from Sharp Stewart in 1893. It was of a similar design to the originals, but slightly longer, and with a 2-4-2 wheel arrangement. It carried the name "Southwold" and the number 1, as its predecessor had done. Neither of the two branches specified by the original Act were built, due to a lack of funds, and the powers were allowed to lapse. At Halesworth, the single platform had a shelter for the passengers, and was connected to the Great Eastern station by a footbridge. There was a raised timber platform between one of the sidings and a siding, where goods were
tranship Transshipment, trans-shipment or transhipment is the shipment of goods or containers to an intermediate destination, then to another destination. One possible reason for transshipment is to change the means of transport during the journey (e.g ...
ped. In 1908, a passing loop was added at Blythburgh, and train control was managed by having a staff for each section. Many of the trains were mixed goods and passenger workings, with the shunting at intermediate stations adding to the journey time for the passengers. The stock did not have a continuous brake, and although the Board of Trade raised the issue at regular intervals, the railway was always able to point to its clean record for transporting passengers, and somehow managed to avoid having to fit one. In 1906 it was announced that the line would be widened from its present narrow gauge to allow carriages and wagons to come direct through from Halesworth. This was not carried out, and the proposal was resurrected again in 1920.


Closure

The railway closed on 11 April 1929 and the LNER instituted a bus service between Halesworth and Southwold as a replacement. In 1940 Southwold Council recommended to the Minister of Supply that the railway's assets should be confiscated for conversion into munitions. The town clerk was receiver for the Southwold Railway Company, but was unable to sell the property without consent of the High Court and an Act of Parliament.


Proposed re-establishment of the line

The Southwold Railway Society was formed in 1994 to: #further the memory of the Southwold Railway and to foster wider interest therein #research, collate and add to the information about the Southwold Railway and to augment the existing collection of artifacts and memorabilia relating to the railway #Publish and otherwise disseminate information, display at exhibitions and promote public events #Investigate the possibility of re-establishing part of the line and to promote this if re-establishment was shown to be possible #Initiate and promote other such activities as are determined The Southwold Railway Trust was established in 2006 with the objective of promoting awareness of the heritage of the Southwold Railway, preserving any remaining artefacts and instigating re-instatement of the railway as a local community and public amenity connecting Southwold to the main line railway at Halesworth. The trust submitted a planning application in June 2012 with a view to recreating a new station close to the original station site in Wenhaston. Plans include a new station building based on the design of the original, plus a workshop and visitor centre building. The proposals include the reopening of a section of the original railway towards Blythburgh. Lineside walks and picnic facilities, and the conservation and appreciation of local wildlife are also central to the plans. The trust hopes to conserve a little piece of this historic and unique railway for current and future generations. To haul trains on the reopened line a replica Sharp Stewart steam locomotive, based on the designs of the locomotives that served the railway, is being built by North Bay Railway Engineering Services. The locomotive will be named "Blyth" and is expected to be completed in 2021.


Locomotives


Gallery

File:Southwold Railway Trackbed (and rail) - geograph.org.uk - 1776587.jpg, Track bed and another rail at Blythburgh File:Southwold Railway Track.jpg, Track at Birds Folly, near Halesworth File:Remaining Rail from the Southwold Railway - geograph.org.uk - 1758863.jpg, More rails can be seen sinking in the mud File:Remains of the Southwold Harbour Branch - geograph.org.uk - 1758861.jpg, Site of old bridge. Rails can be seen sinking in the mud


See also

*
British narrow gauge railways There were more than a thousand British narrow-gauge railways ranging from large, historically significant common carriers to small, short-lived industrial railways. Many notable events in British railway history happened on narrow-gauge railwa ...


Bibliography

* * * *


References


External links


Southwold Railway Trust

A Short History of the Southwold Railway

Southwold Railway Map

"Last train from Southwold" on Youtube.

East Anglian Film Archive Gaumont Mirror: A Railway That is a Real Joke
{{Authority control Heritage railways in Suffolk Closed railway lines in the East of England Railway lines opened in 1879 3 ft gauge railways in England Railway lines closed in 1929