The Romaine-2 Generating Station (french: Centrale de la Romaine-2) is a 640 MW hydroelectric generating station on the
Romaine River The Romaine River is a river in the Côte-Nord region of the Canadian province of Quebec. It is long. It is not to be confused with the Olomane River that is to the east and had the same name for a long time. It flows south into the Gulf of Sain ...
in the
Côte-Nord Côte-Nord (, ; ; land area ) is the second-largest administrative region by land area in Quebec, Canada, after Nord-du-Québec. It covers much of the northern shore of the Saint Lawrence River estuary and the Gulf of Saint Lawrence past Tadous ...
region of the province of Quebec, Canada. It is owned and operated by
Hydro-Québec Hydro-Québec is a public utility that manages the generation, transmission and distribution of electricity in the Canadian province of Quebec, as well as the export of power to portions of the Northeast United States. It was established by the ...
.


Description

The Romaine-2 Dam is from the river mouth. It is in the unorganized territory of Lac-Jérôme in the Minganie Regional County Municipality. It is high, and has a holding capacity of . It is a concrete gravity dam on a foundation of treated rock. The reservoir area is . Drawdown from high to low water level is . The lower part of the Abbé Huard River now forms the northeast arm of the Romaine-2 reservoir. In addition to the main dam, which includes the spillway, the river is contained by dykes A2, B2 and C2 above the dam, and by dykes D2, E2 and F2 below the dam. Five of the dykes contain asphalt/concrete waterproof cores. The largest is high. The penstock leads from an intake structure just north of Dyke D2 in a southeast direction to the generating station. The water passes through a surge chamber, down conduits to the turbines and out through the tailrace to the river to the east of the station. Water flow is . The station has installed capacity of 640 MW, making it the most powerful of the Romaine complex. The plant provides 3.3 TWh annually, at a utilization factor of 0.58.


History

The dams and generating station are part of a huge hydroelectric complex with four dams that was launched in 2009 under the government of Jean Charest. The overall Romaine project was formally launched by Jean Charest in May 2009. A road was built to provide access to the four dams. The Murailles camp at from the start of the road was built to house up to 2,408 workers on the Romaine 2 and
Romaine 1 The Romaine-1 Generating Station (french: Centrale de la Romaine-1) is a 270 MW hydroelectric generating station on the Romaine River in the Côte-Nord region of the province of Quebec, Canada. It is owned and operated by Hydro-Québec. Loca ...
projects. Construction of Romaine-2 lasted from November 2009 to November 2014. The generating station came into service in 2014. In September 2017 Hydro-Québec had said it had no plans for more dams due to the present surplus of electricity. During the inauguration of
Romaine-3 The Romaine-3 Generating Station (french: Centrale de la Romaine-3) is a 395 MW hydroelectric generating station on the Romaine River in the Côte-Nord region of the province of Quebec, Canada. It is owned and operated by Hydro-Québec. Descr ...
in October 2017, Quebec premier Philippe Couillard confirmed that no more major projects were planned.


Controversies

The company had to negotiate several agreements with the local
Innu The Innu / Ilnu ("man", "person") or Innut / Innuat / Ilnuatsh ("people"), formerly called Montagnais from the French colonial period ( French for "mountain people", English pronunciation: ), are the Indigenous inhabitants of territory in the ...
communities, paying more than CDN$200 million over a 60-year period to compensate for the effects of the dams, roads and electric transmission lines. There were a number of controversies. In March 2012
Quebec Route 138 Route 138 is a major highway in the Canadian province of Quebec, following the entire north shore of the Saint Lawrence River past Montreal to the temporary eastern terminus in Kegashka on the Gulf of Saint Lawrence. The western terminus is in El ...
was blocked at Maliotenam by the Innu, who were demanding compensation for the power lines on their territory. In June 2015 Route 138 was blocked at
Pessamit Pessamit (formerly Betsiamites, or Bersimis), is a First Nations reserve and Innu community in the Canadian province of Quebec, located about southwest from Baie-Comeau along the north shore of the Saint Lawrence River at the mouth of the Betsiam ...
and Maliotenam, and the access road to the construction site was blocked, by construction workers demanding that more local workers be hired. In July 2015 the road to the site was blocked by the Innu of Natashquan who felt that Hydro-Quebec did not respect the agreement signed in 2008. In March 2016 a court rejected the demand by Innu families of Uashat mak Mani-utenam to stop the project. In November 2016 there was controversy over the waste of wood cut in the reservoirs.