The Rio Olympic Velodrome, officially the Velódromo Municipal do Rio (''Rio Municipal Velodrome''), is a
velodrome A velodrome is an arena for track cycling. Modern velodromes feature steeply banked oval tracks, consisting of two 180-degree circular bends connected by two straights. The straights transition to the circular turn through a moderate Track tran ...
located in the
Barra Olympic Park The Barra Olympic Park (Brazilian Portuguese: ''Parque Olímpico da Barra''), originally the City of Sports Complex, is a cluster of nine sporting venues in Barra da Tijuca, in the west zone of Rio de Janeiro, Brazil. The park, which served as th ...
sports complex in
Rio de Janeiro Rio de Janeiro ( , , ; literally 'River of January'), or simply Rio, is the capital of the state of the same name, Brazil's third-most populous state, and the second-most populous city in Brazil, after São Paulo. Listed by the GaWC as a b ...
,
Brazil Brazil ( pt, Brasil; ), officially the Federative Republic of Brazil (Portuguese: ), is the largest country in both South America and Latin America. At and with over 217 million people, Brazil is the world's fifth-largest country by area ...
. Built as a replacement for the former Barra Velodrome, the venue hosted
track cycling Track cycling is a bicycle racing sport usually held on specially built banked tracks or velodromes using purpose-designed track bicycles. History Track cycling has been around since at least 1870. When track cycling was in its infancy, it wa ...
events during the
2016 Summer Olympics The 2016 Summer Olympics ( pt, Jogos Olímpicos de Verão de 2016), officially the Games of the XXXI Olympiad ( pt, Jogos da XXXI Olimpíada) and also known as Rio 2016, was an international multi-sport event held from 5 to 21 August 20 ...
, and is scheduled to host
track cycling Track cycling is a bicycle racing sport usually held on specially built banked tracks or velodromes using purpose-designed track bicycles. History Track cycling has been around since at least 1870. When track cycling was in its infancy, it wa ...
events during the
2016 Summer Paralympics ) , nations = 159 , athletes = 4,342 , opening = 7 September , closing = 18 September , opened_by = President Michel Temer , cauldron = Clodoaldo Silva , events = 528 in 22 sports , stadium = Maracanã , sum ...
. After the conclusion of the games, the velodrome will form part of the
Olympic Training Center The United States Olympic & Paralympic Training Centers (OPTCs) are two campuses created by the United States Olympic & Paralympic Committee (USOPC) as training facilities for its Olympic and Paralympic athletes. They are located in Colorado Spri ...
.


Design

The Rio Olympic Velodrome was designed by
Schuermann Schuermann Architects of Münster, Germany, is a dynasty of architects specialising in the design of velodromes, cycle tracks and indoor athletics tracks since 1925. The Schuermann dynasty was founded by Clemens Schuermann (1888–1956), professi ...
Architects, a German design group led by Ralph Schuermann. The group had previously designed the
Laoshan Velodrome The Laoshan Velodrome () is a velodrome that is located in Laoshan, Shijingshan District, Beijing, China. It was built for the 2008 Summer Olympics. The venue was tested during the UCI Track World Cup in December 2007. The velodrome hosted Cyclin ...
for the
2008 Summer Olympics The 2008 Summer Olympics (), officially the Games of the XXIX Olympiad () and also known as Beijing 2008 (), were an international multisport event held from 8 to 24 August 2008, in Beijing, China. A total of 10,942 athletes from 204 Na ...
in
Beijing } Beijing ( ; ; ), alternatively romanized as Peking ( ), is the capital of the People's Republic of China. It is the center of power and development of the country. Beijing is the world's most populous national capital city, with over 21 ...
, along with six other Olympic cycling venues and twenty World Championship venues. The wooden track is made from timber sourced from the
Siberian pine ''Pinus sibirica'', or Siberian pine, in the family Pinaceae is a species of pine tree that occurs in Siberia from 58°E in the Ural Mountains east to 126°E in the Stanovoy Range in southern Sakha Republic, and from Igarka at 68°N in the lower ...
, considered to be the fastest surface for track cycling.


History


Demolition of Barra Velodrome

The Barra Velodrome, one of three venues built as part of the
City of Sports Complex The Barra Olympic Park (Brazilian Portuguese: ''Parque Olímpico da Barra''), originally the City of Sports Complex, is a cluster of nine sporting venues in Barra da Tijuca, in the west zone of Rio de Janeiro, Brazil. The park, which served as th ...
in
Barra da Tijuca Barra da Tijuca () (usually known as Barra) is an upper-class neighborhood or bairro in the Rio de Janeiro#West Zone, West Zone of Rio de Janeiro, Brazil, located in the western portion of the city on the Atlantic Ocean. Barra is well known for it ...
for the
2007 Pan American Games The 2007 Pan American Games, officially known as the XV Pan American Games, were a major continental multi-sport event that took place in Rio de Janeiro, Brazil, from July 13 to 29, 2007. A total of 5,633 athletes from 42 National Olympic Com ...
, was originally planned to host cycling events for the
2016 Summer Olympics The 2016 Summer Olympics ( pt, Jogos Olímpicos de Verão de 2016), officially the Games of the XXXI Olympiad ( pt, Jogos da XXXI Olimpíada) and also known as Rio 2016, was an international multi-sport event held from 5 to 21 August 20 ...
and Paralympics. In early 2013, the
International Cycling Union The ''Union Cycliste Internationale'' (UCI; ; en, International Cycling Union) is the world governing body for sports cycling and oversees international competitive cycling events. The UCI is based in Aigle, Switzerland. The UCI issues racing ...
(UCI), the governing body of sports cycling, deemed the velodrome as unsuitable for hosting Olympic events, citing pillars obscuring the view of spectators and judges, and cyclists' inability to reach significant speeds on the track. The cost of upgrading the venue to UCI standards was seen as equally as expensive as building a completely new venue, and thus it was decided that the Barra Velodrome was to be demolished in favour of building a new one at a different site in the park. After the Barra Velodrome was demolished, work on the Rio Olympic Velodrome began, with British firm 3D Reid, who designed the
Commonwealth Arena and Sir Chris Hoy Velodrome The Commonwealth Arena and Sir Chris Hoy Velodrome, known for sponsorship reasons as the Emirates Arena, is an indoor arena and velodrome in Dalmarnock, Glasgow, Scotland. Built for the 2014 Commonwealth Games, these venues hosted the badminto ...
for the
2014 Commonwealth Games The 2014 Commonwealth Games ( gd, Geamannan a' Cho-fhlaitheis 2014), officially known as the XX Commonwealth Games and commonly known as Glasgow 2014, ( sco, Glesca 2014 or Glesga 2014; gd, Glaschu 2014), was an international multi-sport ev ...
, was chosen alongside Rio de Janeiro-based firm BLAC Architects to help advise design development of the Velodrome. Tenders to construct and operate the venue were opened in October 2013 and won by Brazilian engineering firm Tecnosolo S.A, at a budget of R$136.9 million. The cost did not include the budget for track installation, which was to be the responsibility of the Olympic Organizing Committee.


Construction, setbacks and progress

Construction of the velodrome was marred by many issues and controversies, which included numerous delays, poor working conditions and financial difficulties. As with every track cycling venue purpose-built for the Olympics since the 1960 games, the Rio Olympic Velodrome faced cost overruns by its final year of construction. Olympic Games Executive Director Gilbert Felli warned as early as November 2014 that the velodrome had become a concern for the
International Olympic Committee The International Olympic Committee (IOC; french: link=no, Comité international olympique, ''CIO'') is a non-governmental sports organisation based in Lausanne, Switzerland. It is constituted in the form of an association under the Swiss ...
(IOC) – the venue was originally planned to be complete by the end of 2015, but delays had organizers worried that it would not open until early 2016 instead, despite the UCI pressing that this would not be the case.
Mayor of Rio de Janeiro This is a list of mayors of Rio de Janeiro. History The city of Rio de Janeiro was founded in 1565. It was the seat of the Crown captaincy of Rio de Janeiro, a district of colonial Brazil under Portuguese rule. In 1763 Rio de Janeiro city becam ...
Eduardo Paes Eduardo da Costa Paes (, born 14 November 1969) is a Brazilian politician who was the mayor of the city of Rio de Janeiro from 2009 to 2012, re-elected for a second term from 2013 to 2016 and returning elected again in 2021. He is currently t ...
admitted in December 2014 that work on the velodrome was three weeks behind schedule, and evaluations by the IOC in February 2015 found that substantial work still remained in order for the venue to be complete by scheduled test events prior to the Olympics, describing "very aggressive timelines that will need to be met over the coming months." Despite these troubles, Mário Andrada, a spokesperson for the Rio Organizing Committee, stated, "the delays they cited concern the test events and not to the Games... the velodrome, even though a little late, will not impact the test event. We are counting on it." In April 2015, construction was temporarily suspended by Brazil's Ministry of Labor and Employment, claiming a "grave and imminent danger to the physical safety of workers." The ministry cited their concerns for "the absence of collective protection", and risk of workers falling, in addition to lack of security, no technical report on the stability of slopes at the site, and what was described as a potentially hazardous "accumulation of material". The temporary suspension added even more stress on the construction's timetable, with works being sped up significantly afterwards, with the Organising Committee stressing that "work was back on track." Unfortunately, delays proved to be a valid concern, when cycling test events originally scheduled to take place at the Velodrome on 18 – 20 March 2016 were rescheduled to 29 April – 1 May, due to a delay in the installation of the velodrome's track. Blame was put on poor conditions for the installation of the
Siberia Siberia ( ; rus, Сибирь, r=Sibir', p=sʲɪˈbʲirʲ, a=Ru-Сибирь.ogg) is an extensive geographical region, constituting all of North Asia, from the Ural Mountains in the west to the Pacific Ocean in the east. It has been a part of ...
n-sourced timber, which could potentially lead to the wood warping and bending. It was by then that President of the UCI
Brian Cookson Michael Brian Cookson OBE (born 22 June 1951) is the former president of the Union Cycliste Internationale (UCI), having been elected to the post in September 2013 at the 2013 UCI Road World Championships. Cookson previously served as presiden ...
made public his concerns about the completion of the venue, bluntly stating to the media, in a press conference after the
2016 UCI Track Cycling World Championships The 2016 UCI Track Cycling World Championships were the World Championships for track cycling in 2016. They took place in London in the Lee Valley VeloPark from 2–6 March 2016. As the last major track cycling event prior to the 2016 Summer Ol ...
, that completing the venue in time for test events in late April was "a challenge", and that "if the velodrome is not ready in time, there is no plan B." By late March 2016, however, the track was still not installed, and the planned test event that was delayed to late April was completely cancelled, leaving the venue untested through competition until the Olympics themselves in August. The Organising Committee cited "logistical problems" with the import of raw materials from Serbia; the wood arrived late into Rio's summer, and the city's high humidity meant that the sensitive surface could not be laid as quickly as expected. Comments by Mayor Paes that the velodrome was only 85 percent complete, contradicting earlier comments that opportunities for Olympic cyclists to train at the venue would be held on 25 – 27 June. Troubles further escalated when Tecnosolo, the venue's construction and operation contractor, filed for
bankruptcy Bankruptcy is a legal process through which people or other entities who cannot repay debts to creditors may seek relief from some or all of their debts. In most jurisdictions, bankruptcy is imposed by a court order, often initiated by the debtor ...
in late May. The municipal government of Rio de Janeiro cancelled the contract with Tecnosolo shortly afterwards, saying in a statement that the company "did not have the conditions to continue being technically responsible for the construction of the velodrome". Brazilian real estate firm Engetécnica, who were previously hired as a subcontractor for the venue in February, were hired to replace Tecnosolo and finish construction of the velodrome. By the end of May, the track had finally been installed, with the venue estimated to be 88 percent complete, and training days in the venue for cyclists still penned for late June. On 26 June 2016, a month before the start of the 2016 Summer Olympics, the Rio Olympic Organizing Committee finally took possession of the velodrome, marking the end of construction. The very first training events held at the venue took place the previous day. The venue's opening was not without controversy, however, when state prosecutors inquired about the selection of Engetécnica and subcontractor company Zadar for construction and operation contracts, without a proper bidding process. The municipal government of Rio de Janeiro stated that "the city could not stop the works to comply with time requirements", affirming that there was no time for a public bidding process under the velodrome's tight construction schedule, and that Zadar and Engetécnica were hired under emergency contracts. Additional works on the velodrome were completed on 10 July, and Olympic cyclists were allowed access on 24 July, two weeks prior to the start of the games.


Track records

;Men ;Women


See also

*
Venues of the 2016 Summer Olympics and Paralympics The 2016 Summer Olympics, officially known as the "Games of the XXXI Olympiad", was an international multi-sport event held in Rio de Janeiro, Brazil, from August 5 to August 21, 2016. Events took place at eighteen existing venues (ei ...
*
List of Olympic venues in cycling For the Summer Olympics, there are 76 venues that have been or will be used for cycling. References {{Cycling at the Summer Olympics Venues Cycling Cycling, also, when on a two-wheeled bicycle, called bicycling or biking, is ...


References


External links


Olympic Games - Facilities - Barra Region
(brasil2016.gov.br)
Rio de Janeiro Olympic venues map
(rio2016.com) {{Olympic venues cycling Velodromes in Brazil Sports venues in Rio de Janeiro (city) Venues of the 2016 Summer Olympics Cycle racing in Brazil Olympic cycling venues Barra Olympic Park Sports venues completed in 2016