A reserve study is a long-term
capital budget Capital budgeting in corporate finance is the planning process used to determine whether an organization's long term capital investments such as new machinery, replacement of machinery, new plants, new products, and research development project ...
planning tool which identifies the current status of the reserve fund and a stable and equitable funding plan to offset ongoing deterioration, resulting in sufficient funds when those anticipated major
common area A common area is, in real estate or real property law, the "area which is available for use by more than one person..." The common areas are those that are available for common use by all tenants, (or) groups of tenants and their invitees.
expenditures actually occur. The reserve study consists of two parts: the physical analysis and the financial analysis. This document is often prepared by an outside independent consultant for the benefit of administrators ( Board of Directors or Strata Council Members) of a property with multiple owners, such as a condominium association or homeowners' association (HOA), strata, containing an assessment of the state of the commonly owned property components as determined by the particular association's covenants, conditions, and restrictions (CC&Rs) and bylaws. Reserve studies however are not limited only to condominiums and can be created for any "common interest community" (CIC) properties such as resort ( shared vacation ownership) properties, community/neighborhood associations, coops, etc. Reserve studies are in essence planning tools designed to help the board anticipate, and prepare for, the property's major repair and replacement projects. For example, such projects would include: replacement of the
roof A roof ( : roofs or rooves) is the top covering of a building, including all materials and constructions necessary to support it on the walls of the building or on uprights, providing protection against rain, snow, sunlight, extremes of te ...
on the building(s), replacement of the
boiler A boiler is a closed vessel in which fluid (generally water) is heated. The fluid does not necessarily boil. The heated or vaporized fluid exits the boiler for use in various processes or heating applications, including water heating, centr ...
, retrofit of the
fire alarm A fire alarm system warns people when smoke, fire, carbon monoxide or other fire-related or general notification emergency, emergencies are detected. These alarms may be activated automatically from smoke detectors and heat detectors or may also ...
devices, and resurfacing of the
roadway A carriageway (British English) or roadway (North American English) consists of a width of road on which a vehicle is not restricted by any physical barriers or separation to move lateral movement, laterally. A carriageway generally consists of ...
s. In some jurisdictions across Canada, a reserve study is also sometimes referred to as a "reserve fund study", "contingency reserve fund study", or "replacement reserve study" and, in British Columbia, the legislation refers to this type of study as a "Depreciation Report".


Purpose

The purpose of a reserve study is to give those overseeing the maintenance of the property a better idea of what major expenses to expect and an educated estimate of when these expenses will occur. With this knowledge, the homeowners' association board or manager can create a budget so association members will make their fair share of reserve contributions, designed to offset the slow but steady ongoing reserve component deterioration of the association assets, and avoid being surprised by components that deteriorated often in plain sight and over a number of years. In addition, the reserve study provides important annual disclosures to association members (and prospective buyers) about the condition of common area components, and the level of preparedness (strength) of the reserve fund (typically measured in terms of Percent funded).
HOA reserve study
is a roadmap that allows decisions to be made which will be efficient and effective for the long term. The International Capital Budgeting Institute has established standards for calculating percent funded. There are three methods of making this calculation, and differences between reserve practitioners can, unfortunately, result in significant differences in the percent funded amount. (This reference returns the error "404 Page not found", but the methods used in cash-flow analyses don't give correct values anyway). († : Unfortunately, because inflation is incorrectly accounted for, anyone checking the fairness of assessments between years for a cash-low method study will find that recommended assessments cheat future owners to benefit current owners. A reserve study for CICs should: 1. Provide budgeting information that gives some theoretical assurance that when common element replacement projects are due, sufficient funds will have been assessed to pay for them without special assessments (preferably without significant over-funding). 2. Fairly distribute inflated costs for replacement projects among owners, in proportion to their percent ownership of common elements (as defined in their association documents) for the duration of that ownership, as measured either in any year's constant dollars or in hours to earn at any pay rate assuming owner pay inflates at the same rate as component replacement costs. 3. Give a theoretically accurate percent funded based on the component cost inflation rate(s) used in the study. If these three requirements are not met, the analysis is of little use to a condominium association; and current "cash-flow" methods cannot meet these requirements, because they cannot properly accounted for inflation.)


Results

There are three results from a reserve study: # A listing of the major components of the association to be funded through reserves, their expected useful life, remaining useful life, and current replacement cost (yielding the "scope and schedule" of the reserve projects). # An evaluation of the current strength of the reserve fund (commonly expressed as "percent funded"). (Unfortunately, because it incorrectly accounts for inflation, the commonly used method of calculating this based on a study year cost cash flow analysis, does not give accurate estimates of percent funded for a single component until the project year approaches, and cannot provide accurate estimates of percent funded for multiple component projects in different future years. This can be verified using any component and set of components using any assumed inflation rates for each component or for all components, and comparing the results — e.g., using Appendix H of the Virginia Department of Professional and Occupational Regulation's Guidelines for the Development of Reserves Studies for Capital Components, dated 9/5/2019 — to correctly inflated values; however, the mathematics in those guidelines are identical to those for an annuity, implying that replacement reserves is an annuity of which principle and investment returns are paid with assessments.) # A recommended multi-year reserve funding plan. (Conflict of interest WARNING: ICBI is closely associated with reservestudy.org, and Virginia and Nevada laws require that reserve studies include sections and calculations specified by the organization that claims to have written the book on reserve studies, trains reserve specialists, and is closely associated with reservestudy.org. It does not require that the recommendations meet the special requirements of CICs, which reserve specialists are not yet trained to do. Furthermore, when the inappropriate Appendix H calculations included in Virginia law were challenged, they were not changed because they were included on the advice of reserve specialists; and the FHA and Fannie Mae have been informed that incorrect reserve assessments can cause financial problems for owners, but they didn't seem concerned.)


Relevance

Reserve studies are required by the board or manager for due diligence, disclosure, and budget and planning purposes. An increasing number of
U.S. states In the United States, a state is a constituent political entity, of which there are 50. Bound together in a political union, each state holds governmental jurisdiction over a separate and defined geographic territory where it shares its sove ...
and Canadian provinces today require some form of reserve planning or disclosures. In addition to requiring a minimum 10% of the total budget be dedicated to reserve contributions,
Fannie Mae The Federal National Mortgage Association (FNMA), commonly known as Fannie Mae, is a United States government-sponsored enterprise (GSE) and, since 1968, a publicly traded company. Founded in 1938 during the Great Depression as part of the N ...
and the
Federal Housing Administration The Federal Housing Administration (FHA), also known as the Office of Housing within the Department of Housing and Urban Development (HUD), is a United States government agency founded by President Franklin Delano Roosevelt, created in part by ...
may ask for a current reserve studies (to demonstrate that the association has dedicated sufficient funds to caring for the ongoing needs of the property) to be approved for
FHA insured loan An FHA insured loan is a US Federal Housing Administration mortgage insurance backed mortgage loan that is provided by an FHA-approved lender. FHA mortgage insurance protects lenders against losses. They have historically allowed lower-income Ame ...
s and Fannie Mae lending products and services.


State reserve studies

In addition to being helpful planning tools, reserve studies for Community Associations are legally mandated in 30 states (such as California, Florida, Hawaii, Nevada, Virginia, Washington, etc.), either for budget preparation or homeowner (and prospective homeowner) disclosure purposes. In California, the relevant law is California Civil Code 5300. In California, the law requires an annual reserve study Update, with that update prepared on the basis of a "diligent visual site inspection" at least every third year. With the passing of SB 278 in 2010, the state of Utah also requires condominium and community associations to conduct and review reserve studies on a periodic basis. reserve contributions are often one of an association's largest budget line items (often 15-40% of the total budget), and the reserve fund is typically the association's largest financial asset. This means annual review of reserve contributions and annual disclosure of the status of the reserve fund are prudent. The State of Nevada has adopted specific statutes related to reserve studies, which are set forth in NRS 116. These statutes also require that reserve preparers in Nevada be registered and background checked by the State Department of Real Estate (advised by reservestudy.org?).


International Capital Budgeting Institute

Since Reserve Studies help associations make fiscally responsible decisions, navigating to a successful future, a consistent high quality of Reserve Studies is desired. While foundational Reserve Study industry standards have existed since 1998 (see and ), a small group has proposed a new set of standards. While intended as progress, as-of this writing, these 2015 standards have yet to be embraced or adopted by the industry as a whole. For more see The International Capital Budgeting Institute (ICBI).


US FHA

On June 30, 2011, the Department of Housing and Urban Development published Mortgagee Letter 2011-22, which made reserve studies mandatory for all new condominium conversions applying for
FHA insured loan An FHA insured loan is a US Federal Housing Administration mortgage insurance backed mortgage loan that is provided by an FHA-approved lender. FHA mortgage insurance protects lenders against losses. They have historically allowed lower-income Ame ...
s approval, including gut and non-gut rehabilitation conversions. This new guideline went into effect September 1, 2011. Condominiums must demonstrate that at least 10% of the yearly assessment income be dedicated towards reserve contributions. The FHA enforces the 10% budget line item requirement nationally by prohibiting lending in developments that are non-compliant with this requirement. Additionally, Mortgagee Letter 2011-22 stipulates all other condominiums requesting FHA project approval may be required to submit a current (completed within the last 24 months) reserve study at their discretion or whenever financial documents do not appear to meet sufficient funding requirements of the condominium association.


Fannie Mae

On December 1, 2010, Fannie Mae published Announcement SEL 2010-16. The new guidelines outlined in the announcement went into effect March 1, 2011. The guidelines made reserve studies mandatory for all newly converted, non-gut rehabilitation condominium developments to be eligible Fannie Mae project approval. All other types of condominiums have the option to submit a compliant reserve study or must add a budget line item for reserves equal to 10% of the yearly assessment income.


Canada

In Canada the legislation governing condominium and strata corporations is provincial. There are no national standards conducting reserve professionals with respect to conduct, reporting, methodology, calculation formula other than those of specific professional organizations. The absence of a national organization of reserve planner professionals has resulted in reserve study reports containing vital financial information being prepared using simplistic spread sheet applications and forecasts which are not compliant with financial reporting requirements of Financial Reporting & Assurance Standards Canada. A
Reserve fund study A reserve study is a long-term capital budget planning tool which identifies the current status of the reserve fund and a stable and equitable funding plan to offset ongoing deterioration, resulting in sufficient funds when those anticipated major ...
is a financial document which is likely to be reviewed by an
auditor An auditor is a person or a firm appointed by a company to execute an audit.Practical Auditing, Kul Narsingh Shrestha, 2012, Nabin Prakashan, Nepal To act as an auditor, a person should be certified by the regulatory authority of accounting and a ...
and must meet these standards. The reserve fund study also requires technical expertise with respect to building structure and systems. It is for this reason that these reports are primarily prepared by
engineer Engineers, as practitioners of engineering, are professionals who invent, design, analyze, build and test machines, complex systems, structures, gadgets and materials to fulfill functional objectives and requirements while considering the l ...
s,
architect An architect is a person who plans, designs and oversees the construction of buildings. To practice architecture means to provide services in connection with the design of buildings and the space within the site surrounding the buildings that h ...
s,
appraiser An appraiser (from Latin ''appretiare'', "to value"), is a person that develops an opinion of the market value or other value of a product, most notably real estate. The current definition of "appraiser" according to the Uniform Standards of Pro ...
s,
building inspector A building inspection is an inspection performed by a building inspector, a person who is employed by either a city, township or county and is usually certified in one or more disciplines qualifying them to make professional judgment about whether ...
s etc. The Capital Budgeting process with respect to reserve management planning has clarified in the
International Capital Budgeting Institute International is an adjective (also used as a noun) meaning "between nations". International may also refer to: Music Albums * ''International'' (Kevin Michael album), 2011 * ''International'' (New Order album), 2002 * ''International'' (The T ...
s (ICBI)
Generally Accepted Reserve Study Standards GeneRally is a freeware racing game developed by brothers Hannu and Jukka Räbinä from Finland. Although it features a 3D graphics engine, Gene Rally has a top-down perspective. It has a similar art design to games such as Super Sprint and Sli ...
published April 2015. The ICBI reserve study standards are very specific with respect to the information to be contained in the report and the calculation methods used in providing financial forecasts. The standards are also specific as to the software used to create the financial forecasts. A reserve professional providing reserve study/depreciation reports which comply with these standards must use the formulas provided by ICBI.
Associated Reserve Planners of Canada Associated may refer to: *Associated, former name of Avon, Contra Costa County, California * Associated Hebrew Schools of Toronto, a school in Canada *Associated Newspapers, former name of DMG Media, a British publishing company See also *Associat ...
Inc. (ARPC) is a national group of reserve study providers of various vocations and professional designations. ARPC members have adopted the ICBI standards and incorporated them into the reserve management planning process. All members use Reserve Fund Analysis software
RFA Pro RFA may refer to: Government and private organizations * Radio Free Asia, a private news broadcaster and publisher in East Asia, funded in part by the U.S. government * Renewable Fuels Agency, a former UK renewable fuel regulatory agency * Ren ...
as it has been independently audited by a national accounting firm and meets all the requirements of the ICBI Generally Accepted Reserve Study Standards. Report templates and all financial reports as required by the standards are included in the RFA Pro analysis system.


Funding methods and Goals

There are several reserve study funding methods and goals. These methods may be used to develop a funding strategy that corresponds with the risk tolerance of the community. In National Reserve Study Standards terminology, there are two basic ways to calculate contributions: "Cash Flow" or "Component" (also known as "Straight Line"). See a comparison between the tw
here
In the same National reserve study Standard terminology, there are four funding objectives: Full funding, Threshold funding, Baseline funding, and Statutory funding. Due to its greater computational flexibility and its ability to allow the user to focus on and achieve any of the four funding Objectives, the "Cash Flow" Method has seen significant growth in popularity. The four Funding Goals (excerpted fro
National Reserve Study Standards
or in
document
expounding on those standards, are as follows: * "Full Funding" is pursuing the goal where the Reserve Fund Balance will equal (or closely approximate) the value of Reserve component deterioration (the "Fully Funded Balance"). * "Baseline funding" describes the goal to have sufficient reserves on hand to never completely run out of money. This is sometimes described as a "cash-positive" plan. With less cash in reserves on-deposit, associations with a baseline funding objective have higher instances of special assessments and/or deferred maintenance. * "Threshold funding" describes a goal chosen by the board other than the 100% (Full funding) level or just staying cash-positive (Baseline funding). This may be a specific Percent Funded target or a cash balance target. Threshold funding is often a value chosen in between Full funding and Baseline funding. All funding goals are designed to meet exactly the same expenses outlined in the reserve component list. Thus the expenditures are identical, only the size of the reserve fund through the years is different. This means the size of reserve contributions between different reserve funding objectives is often relatively small (typically only 10–15%).


Qualifications & Levels of Service

Reserve studies can be created by volunteer board members, their professional managers, obtained through a variety of professionals specializing in the preparation of reserve studies, or large architectural or engineering firms who complete reserve studies as a small aspect of their larger business. Recently, certification criteria have been created to allow for a more ordered system of identifying those individuals who have been specifically trained in the creation of reserve studies. One such certification, that of Reserve Specialist (RS), is available through the
Community Associations Institute The Community Associations Institute (CAI) is an international trade association and special interest group headquartered in Falls Church, Virginia, with more than 60 chapters in the United States that asserts that it provides "education and r ...
(CAI). To obtain this certification, candidates must have prepared at least 30 reserve studies within the past 3 calendar years, hold a bachelor's degree in construction management, architecture, or engineering (or something equivalent based on experience and education), and complied with various other rules and codes of conducts. Another credential is the Professional Reserve Analyst (PRA), created and promoted by the reserve study industry's own trade organization, the Association of Professional Reserve Analysts (APRA). The PRA was the first accrediting body for Reserve Professionals. The PRA credential is similar in that it takes years, demonstrated experience, and compliance with standardized terminology to obtain although the experience levels are a bit higher than that required for the RS and their efforts include studies both inside and outside of the homeowner association industry. APRA also requires its PRAs to maintain proficiency with continuing education. In Canada there are several designations and training programs. The Real Estate Institute of Canada (REIC) offers the Certified Reserve Planner (CRP) program, which is the only nationally accepted specialty designation listed in provincial (some provinces) legislation as qualified. Members of the Appraisal Institute of Canada (AIC) must use the methodology and standards of the REIC program if they wish to complete the report. This includes preparing a Benchmark Analysis and rating the reserve fund as a percent funded. The Canadian National Association of Real Estate Appraisers(CNAREA)offers the Designated Reserve Planner (DRP) program to designated appraiser members since 2012. The DRP designation requires demonstrated experience and compliance with standardized terminology and methodology to obtain. All DRP designated planners are required to use the RFA Pro Reserve Fund Analysis software or provide a quality assurance report of their chosen calculation methods. Applied Science Technologists & Technicians of British Columbia (ASTTBC) offers the Registered Reserve Fund Analysts (RRFA) training program to Home inspectors, as home inspectors are restricted from completing Depreciation Reports / Reserve Studies in their bylaws. As of 2013, Sauder School of Business Real Estate Division is offering the first of 2 courses towards a certification called the Reserve Fund Planning Program (RFPP), but yet no trade group has recognized this designation. There are three types of reserve studies based on standards set by the Association of Professional Reserve Analysts and Community Associations Institute, differing in how exhaustively the Physical Analysis is conducted. These three types of reserve studies allow the association to select the "Level of Service" appropriate to their current budget preparation and disclosure needs. Listed beginning with the most exhaustive, they are: # "Full" reserve study (creation of the reserve study, involving creation of the component list, measuring/quantifying all reserve components, and development of the Useful Life, Remaining Useful Life, and Current Replacement Cost based on a diligent, visual on-site inspection). Note that for most associations, a "Full" reserve study only needs to be done once. After a "Full" reserve study has been done, in subsequent years the association can choose between the two reserve study update options shown below: # "Update With-Site-Visit" reserve study (an update of an existing reserve study involving a diligent visual on-site inspection, but presuming that all components have been properly identified and quantified). This type of update is often performed every two to five years. # "Update No-Site-Visit" reserve study (an update of an existing reserve study without a site inspection, done by client interviews and interviews with knowledgeable vendors and service providers). This type of update is typically performed in the years in-between With-Site-Visit updates. In addition to the above types of Reserve Studies, note that there are different levels of professional engagement. These typically fall into the categories of independently prepared reserve studies, an integrated Reserve management plan, or a Consulting engagement.


Typically Excluded Common Area Components

Some common area components may have been left out of your reserve study or been included in the component list as an “excluded item” and not been funded for. These components will typically fall into one or more of the categories listed below. ''Below Threshold Costs'' - Component repair and/or replacement costs that are deemed too small to be considered capital expenses and are typically included in the operational or maintenance budget of the association have not been funded for in this study. Minimal threshold costs are determined by the Association or by you Reserve Analysts based on the typical minimal threshold costs for similar sized associations. ''Operational Expenses'' - These occur at least annually and can be effectively budgeted for each year. They are characterized as being reasonably predictable both in terms of frequency and cost. Operational expenses include all minor expenses which would not otherwise adversely affect an operational budget from one year to the next. ''Very Long or Unpredictable Useful Life Expectancy'' - Components which, when properly maintained, have a very long useful life and which cannot be accurately predicted, have been excluded from this reserve report. These components may require maintenance and upkeep which is typically funded from the operational budget of the association. ''Unit Improvements'' - Improvements made to the property that fall within the Governing Documents’ unit description summary (owners responsibility), are not typically considered to be community owned or the responsibility of the association. ''Other Non-Association Owned'' - Improvements installed on the property but which are owned by other parties such as governmental agencies, utility companies, the US Postal Service, etc., are not included in this reserve study. The replacement and maintenance of these improvements are not typically the responsibility of the association. Additionally, budgeting is normally excluded for repairs or replacements of assets which are deemed to have an estimated useful life equal to or exceeding the estimated useful life of the facility, community as a whole, or exceeding the legal life of the community as defined in an association's governing documents. Examples include the complete replacement of the foundation, elevators, wiring and oftentimes plumbing. Also excluded are insignificant expenses which may be covered either by an operating or reserve contingency, or otherwise in a general maintenance fund. Costs which are caused by acts of God, accidents or other occurrences which are more properly insured for, rather than reserved for, are also excluded.Reserve Data Analysis: Excluded Components
Reserve Study
Guideline. Retrieved June 16th 2016.


References

{{Project cost estimation methods Property management Condominium Budgets Real estate terminology