Rapid bridge replacement or accelerated bridge construction (ABC) is a technique that allows bridges to be replaced with minimum disruption to traffic. The replacement bridge is constructed on a site near the bridge to be replaced. When it is completed, the old bridge is cut away and removed using
self-propelled modular transporter Self-propelled may refer to * Human-powered transport, humans moving themselves (and their cargo) via their own muscle energy * Machines that power their own movement: ** Automobile (from ''auto-'' + ''mobile'', "self-moving") ** Locomotive (from ...
s (SPMTs). Then the SPMTs lift the new bridge, transfer it to the work site and put it in place. Often the highway or railroad carried by the bridge is closed for just one weekend. Conventional techniques typically replace half a bridge at a time, with all highway traffic redirected under the other bridge half, often for a year or more, while construction progresses.
Accelerated bridge construction Rapid bridge replacement or accelerated bridge construction (ABC) is a technique that allows bridges to be replaced with minimum disruption to traffic. The replacement bridge is constructed on a site near the bridge to be replaced. When it is comp ...
(ABC) alternatives consist of ABC components and ABC techniques. Components can be categorized into prefabricated bridge elements (e.g. beams, bridge decks, footings, columns, pier caps, abutments etc.) or prefabricated bridge systems (e.g. bridge modules with superstructures and/or substructures). ABC involves fabrication of these elements or systems off-site in a regulated environment, and transporting those to site for installation. Related processes such as lifting, placement, transportation, embankment construction are termed as ABC techniques. Notable rapid bridge replacement projects include
Interstate 93 in Massachusetts Interstate 93 (I-93) is an Interstate Highway in the New England states of Massachusetts, New Hampshire, and Vermont in the United States. Spanning approximately along a north–south axis, it is one of three primary Interstate Highways ...
, where 14 bridges were replaced over 10 weekends in 2011.


Standards


NEXT Beam

The development of Northeast Extreme Tee Beam or NEXT Beam was started in 2006 by the Precast/Prestressed Concrete Institute (PCI) North East to update regional standard on accelerated bridge construction for northeastern states of the United States. The NEXT Beam design was inspired by
double-tee A double tee or double-T beam is a load-bearing structure that resembles two T-beams connected to each other side by side. The strong bond of the flange (horizontal section) and the two webs (vertical members, also known as stems) creates a struc ...
designs that have been used to build railroad platform slabs. The use of double tees with wide flanges allows the use of fewer beams, which stay in place to form the deck, resulting in a shorter construction time. The first design was introduced in 2008, called "NEXT F" with flange thickness requiring a topping. This was used for the construction of the Maine State Route 103 bridge that crosses the York River. The seven-span long bridge was completed in 2010 as the first NEXT beam bridge. The second design was introduced in 2010 for Sibley Pond Bridge at the border of
Canaan Canaan (; Phoenician: 𐤊𐤍𐤏𐤍 – ; he, כְּנַעַן – , in pausa – ; grc-bib, Χανααν – ;The current scholarly edition of the Greek Old Testament spells the word without any accents, cf. Septuaginta : id est Vetus T ...
and
Pittsfield, Maine Pittsfield is a town in Somerset County, Maine, United States. The population was 3,908 at the 2020 census. Pittsfield is home to the Maine Central Institute, a semi-private boarding school, and the annual Central Maine Egg Festival. History ...
. The design was called "NEXT D" with an flange thickness that does not require deck topping, allowing the wearing surface to be applied directly onto the beams. The combination of F and D, called "NEXT E", was introduced in 2016. As of 2018, thirteen US states have accepted the NEXT beam standard: Connecticut, Delaware, Georgia, Maine, Massachusetts, New Hampshire, New Jersey, New York, Pennsylvania, Rhode Island, South Carolina, Vermont, and Virginia. New Brunswick, Canada also accepts the standard.


Incidents

On March 15, 2018, a partially completed bridge at Florida International University collapsed five days after it was placed using this method. FIU is home to the Accelerated Bridge Construction University Transportation Center, a federally-funded center. FIU planned an independent investigation into the cause of the collapse.Bridge Collapse Saps Spirits and Research Efforts at Florida International University
By PATRICIA MAZZEI and STEPHANIE SAUL, New York Times, MARCH 17, 2018