The R179 is a class of 318
New Technology Train
New Technology Train (NTT) is the collective term for the modern passenger fleet of the New York City Subway that has entered service since the turn of the 21st century. This includes the current R142, R142A, R143, R160, R179, and R188 mod ...
subway cars built by
Bombardier Transportation
Bombardier Transportation was a Canadian-German rolling stock and rail transport manufacturer, headquartered in Berlin, Germany.
It was one of the world's largest companies in the rail vehicle and equipment manufacturing and servicing industry ...
for the
New York City Subway
The New York City Subway is a rapid transit system owned by the government of New York City and leased to the New York City Transit Authority, an affiliate agency of the state-run Metropolitan Transportation Authority (MTA). Opened on October 2 ...
's
B Division B Division, Division B, or variant may refer to:
* ''B Division'' (New York City Subway)
* ''B Division'' (Irish League), association football
* ''Division B'' (Scottish Football League)
* ''Divizia B'' (Romanian Football League)
* Moldovan "B ...
. Entering service between 2017 and 2020, the cars replaced all remaining
R32s and
R42s.
The R179 order originally contained 208 cars that were each long. In the 2010–2014 Capital Program, the order was changed to 290 cars that were long – similar to the car lengths of the
R143 and
R160 cars – with options for up to 130 more cars. The majority of the R179s were supposed to be in five-car sets because the R179s would be replacing the 75-foot-long
R44s, which were arranged in 300-foot-long four-car sets. A minority of the R179s were to be arranged in four-car sets. In 2011, the order was reduced to 300 60-foot-long cars with no additional option orders. Because of the R44s' earlier than planned retirement and the R32s and R42s assigned to services utilizing eight-car trains at the time, the setup was reversed, with the majority of the R179s being arranged in four-car sets.
The $599 million contract for the R179s' construction was awarded to Bombardier in 2012. At the time, the first R179 train was set to be delivered in December 2014 and the last train would be delivered in July 2017. Because of manufacturing defects during the construction process, the timeline for delivery was pushed back two years, and the cost of the contract rose to $735 million. The first R179 cars were delivered in September 2016, and the first test train of eight cars was placed in service in November 2017. The test train passed its 30-day in-service test in December 2017, which allowed the remaining R179s to be gradually placed in service. All cars were expected to be delivered by early 2019. However, starting in December 2018, several cars had to be withdrawn from service due to defects, and in January 2019, deliveries were temporarily halted while these defects were being fixed. The fleet was temporarily removed from service in January and June 2020 following separate incidents during these months.
In January 2018, sixteen more cars were added to the order as part of a settlement so that there would be 24 five-car sets instead of the 8 originally projected and 49 four-car sets instead of the original 65. In January 2019, two more cars were added to the order as a part of a settlement for further damages. All cars were delivered by December 2019, and had entered service by March 2020.
Description and features
The R179s are numbered 3010–3327. Cars numbered 3010–3049 and 3238–3327 are configured into five-car sets, comprising 130 cars, which are assigned to the
A and
Rockaway Park Shuttle
The Rockaway Park Shuttle is a New York City Subway shuttle train that operates in Queens. It connects with the train at Broad Channel station and is the latest iteration of the Rockaway Shuttle services that have been running on the Rockaway ...
and are based out of
Pitkin Yard
The New York City Transit Authority operates a total of 24 rail yards for the New York City Subway system, and one for the Staten Island Railway. There are 10 active A Division yards and 11 active B Division yards, two of which are shared betwe ...
. Cars numbered 3050–3237 are configured into four-car sets, comprising 188 cars; these are split between the
J and Z (based out of
East New York Yard
The New York City Transit Authority operates a total of 24 rail yards for the New York City Subway system, and one for the Staten Island Railway. There are 10 active A Division yards and 11 active B Division yards, two of which are shared betwee ...
) and the
C (based out of
207th Street Yard). The order replaced all remaining
R32s and
R42s, which dated to the 1960s and early 1970s.
The R179s were also the last subway car order to be built by Bombardier Transportation prior to being acquired by
Alstom
Alstom SA is a French multinational rolling stock manufacturer operating worldwide in rail transport markets, active in the fields of passenger transportation, signalling, and locomotives, with products including the AGV, TGV, Eurostar, Avelia ...
in January 2021.
The R179 cars are equipped with updated control systems,
HVAC
Heating, ventilation, and air conditioning (HVAC) is the use of various technologies to control the temperature, humidity, and purity of the air in an enclosed space. Its goal is to provide thermal comfort and acceptable indoor air quality. HV ...
, and public address systems. They are visually very similar to the
R143s and
R160s, but the three car types are not interoperable with each other due to electrical incompatibilities between them.
The R179s, like the R160s, employ an advanced alternative to electronic strip maps called the
"Flexible Information and Notice Display" ("FIND"), which are manufactured by Axion Technologies Ltd. This includes an
LCD screen displaying the route, route information, and advertisements, as well as a dynamic red, yellow, and green LED strip map that displays the next ten stations, plus five consecutive "further stops" to riders. There are three of these in every car. The display updates the stations at every stop, also giving the number of stops to each station listed. This allows for instant route or line changes with the correct information, which includes, but is not limited to, omitting certain stops (displayed as "Will not stop" in red). However, the LCD displays on the R179s that show the route are slightly larger than those on the R160s. Additionally, when the FIND goes blank, the R179 FIND displays "Route change: this map is not in use", as opposed to the R160 FIND, which displays "Listen to train crew for announcement."
The R179s also utilize the older door closing chimes used on the
R142s and
R142As, as opposed to the newer door chimes used on the R143s, R160s, and
R188s.
Communication-based train control
Communications-based train control (CBTC) is a railway signaling system that uses telecommunications between the train and track equipment for traffic management and infrastructure control. CBTC allows a train's position to be known more accurat ...
(CBTC) equipment will be installed in all R179s that are already on MTA property,
in conjunction with the ongoing automation of B Division lines.
The R179s are equipped with looped stanchions in the interiors of trains to provide passengers on crowded trains with a greater amount of pole surface area to grab on to. This feature was previously tested on R160A set 9798–9802 and has been implemented on other trains as a part of a plan to fix the subway's
2017 state of emergency.
The R179s utilize a newer version of HVAC systems, which are noticeably quieter on the outside of the train, compared to previous generations of New Technology Trains. The R179s also have larger picture windows, resulting in a tighter cab for the conductors and train operators, since slightly more space was required to accommodate the HVACs.
History
Contract plans
The R179 contract originally consisted of 208 cars. Later, in the 2010–2014 Capital Program, the proposed order was expanded to 420 cars (340 for the New York City Subway and 80 for the Staten Island Railway). This consisted of 290 base order cars (250 arranged in 5-car sets and the remaining 40 arranged in 4-car sets), with two option orders. The first option called for 50 cars arranged in 5-car sets. There was also a second option for 80 additional cars, which would have supplied cars for the
Second Avenue Subway
The Second Avenue Subway (internally referred to as the IND Second Avenue Line by the MTA and abbreviated to SAS) is a New York City Subway line that runs under Second Avenue on the East Side of Manhattan. The first phase of this new line, ...
Phase I service. The proposed MTA 2010–2014 Capital Program pointed towards an order of cars.
The official RFP was issued on June 3, 2010. Bids were due by the following August 13, and in April 2011, the contract was expected to be awarded for $637.8 million. However, there were delays with negotiation problems, and the projected cost went up to $748 million in October 2011. In November 2011, the order was altered to a base order of 300 cars (260 arranged in 4-car sets and the remaining 40 arranged in 5-car sets), with no options.
The contract was finally awarded to
Bombardier Transportation
Bombardier Transportation was a Canadian-German rolling stock and rail transport manufacturer, headquartered in Berlin, Germany.
It was one of the world's largest companies in the rail vehicle and equipment manufacturing and servicing industry ...
on March 24, 2012, for $599 million, below the projected cost.
The joint venture Alskaw Inc., made up of the companies
Kawasaki and
Alstom
Alstom SA is a French multinational rolling stock manufacturer operating worldwide in rail transport markets, active in the fields of passenger transportation, signalling, and locomotives, with products including the AGV, TGV, Eurostar, Avelia ...
, which built the
R160A/B cars, protested the award of the contract to Bombardier immediately after the MTA Board approved the contract. However, the protest was denied, and Bombardier signed the contract on June 4, 2012.
A 2012 news report from the ''
New York Daily News
The New York ''Daily News'', officially titled the ''Daily News'', is an American newspaper based in Jersey City, NJ. It was founded in 1919 by Joseph Medill Patterson as the ''Illustrated Daily News''. It was the first U.S. daily printed in ta ...
'' indicated that a high-ranking MTA official had been in talks with car builder Bombardier Transportation, Inc. for a job. This prompted an ethics investigation but has since been resolved.
The R179s were originally intended to replace all the
R44s, but due to structural integrity issues found on
New York City Transit
The New York City Transit Authority (also known as NYCTA, the TA, or simply Transit, and branded as MTA New York City Transit) is a public-benefit corporation in the U.S. state of New York that operates public transportation in New York City. P ...
's R44s in late 2009, those cars' retirement was facilitated by an
option order of R160s. Additionally, the
Metropolitan Transportation Authority
The Metropolitan Transportation Authority (MTA) is a public benefit corporation responsible for public transportation in the New York City metropolitan area of the U.S. state of New York. The MTA is the largest public transit authority in th ...
later dropped the plan to order R179s for the
Staten Island Railway
The Staten Island Railway (SIR) is a rapid transit line in the New York City borough (New York City), borough of Staten Island. It is owned by the Staten Island Rapid Transit Operating Authority (SIRTOA), a subsidiary of the Metropolitan Trans ...
, instead opting to overhaul some
R46s to replace the existing R44s there (which has also since been canceled). The R179s were then intended to retire all remaining
R42s (50 cars) and
R32s (222 cars).
Some R32s were expected to be retained due to delays in the delivery of the R179s and the potential need for extra rolling stock to provide additional service. As a result, the MTA planned to spend another $49.2 million to refurbish and maintain 132 to 164 R32 cars through 2018 and then 110 R32 cars through 2019, before finally replacing the remaining cars with the
R211As. In addition, the MTA anticipated to have most, if not all R179s delivered before the since-canceled
full shutdown of the 14th Street Tunnel in April 2019.
However, by January 21, 2020, it was again decided to retire the
R32s with the arrival of the R179s.
Manufacturing issues
In a timeline set in October 2012, the first test train was scheduled to arrive on December 22, 2014, the first production unit was scheduled to arrive on July 27, 2015, and the entire order was to be completed on January 30, 2017.
After some delays in starting production, a non-operational mockup was built in late November 2013. Delivery of the first 10-car test train was now scheduled for the third quarter of 2014,
though delivery of the production cars was still scheduled to begin July 2015 and continue through January 2017. However, as NYCTA's and Bombardier's inspectors found cracks due to welding issues in the prototype train's chassis, the entire lot was rejected, and the delivery schedule was pushed back by two years.
The delays in delivery have increased the cost of the cars from $599 million to $735 million; these additional costs add to the costs required to maintain older cars. In addition, because of the 2-year delay in producing the R179s, Bombardier was banned from bidding on the
R211 contract, which would replace other older B Division rolling stock.
Delivery and continued issues
Bombardier built the cars in its
Plattsburgh, New York
Plattsburgh ( moh, Tsi ietsénhtha) is a city in, and the seat of, Clinton County, New York, United States, situated on the north-western shore of Lake Champlain. The population was 19,841 at the 2020 census. The population of the surrounding ...
facility. The first five-car set of R179s (3010–3014) was delivered to the
New York City Transit Authority
The New York City Transit Authority (also known as NYCTA, the TA, or simply Transit, and branded as MTA New York City Transit) is a public-benefit corporation in the U.S. state of New York that operates public transportation in New York City. P ...
between September 6 and 8, 2016. The next five cars (3015–3019) were delayed and were delivered between November 15 and 17, 2016, forming a complete pilot ten-car train for acceptance testing and evaluation.
The first four-car set of R179s (3050–3053) was delivered between December 21 and 22, 2016. The next four cars (3054–3057) were delivered in January 2017, forming a complete eight-car train for acceptance testing and evaluation.
A delivery plan from January 2017 anticipated a rate of one car per day starting from November 2017, in an effort to have all cars on property by July 2018.
However, additional delays have occurred, and by October 2018, deliveries were not expected to be completed until March 2019. Due to continuing delays in the production of the R179s, the order was increased by 16 additional B-cars on January 22, 2018. The order then consisted of 316 cars (120 arranged in 5-car sets and 196 arranged in 4-car sets).
[ On January 22, 2019, another settlement added 2 B-cars to the order.] As of July 2019, deliveries were not expected to be completed until November 2019.
The four-car R179 sets were placed into revenue service on the on November 19, 2017, for in-service acceptance testing after slightly over a year of successful non-revenue service tests. During the first two weeks of the testing period, the MTA identified three major issues in the train, which have since been fixed. After successful completion, the four-car R179 sets officially entered revenue service on December 27, 2017, a month later than originally planned. The pilot five-car R179 sets underwent specification modifications at Bombardier's Kanona Facility in summer 2018 and were re-delivered for further testing.[ After two years of modifications, the train was placed into service on the for a 30-day in-service test on February 10, 2019. The train completed the test on March 11, 2019, and entered regular service the next day.
By the start of December 2018, some trains had to be taken out of service due to manufacturing defects such as doors, propulsion, and air compressors issues. The next month, the MTA revealed that 162 cars had been delivered, of which 128 (comprising sixteen 8-car trains) had been placed in service.] In early January 2019, NYCTA President Andy Byford
Andy Byford (born 1965) is a British transport executive who has held several management-level positions in transport authorities around the world, such as the Toronto Transit Commission (TTC), New York City's Metropolitan Transportation Authori ...
ordered more R179 cars to be removed from passenger service and the temporary suspension of the delivery of further cars until Bombardier corrected all defects found within them. After the issues were resolved, deliveries recommenced in early February 2019.' On May 10, 2019, it was found that there was a welding defect on the collision pillars of the R179, but not all trains on property at the time were pulled from service.
By December 30, 2019, all 318 cars had been delivered. Even after all cars had been delivered, an audit by Comptroller Scott Stringer
Scott M. Stringer (born April 29, 1960) is an American politician who served as the 44th New York City Comptroller. A Democrat, Stringer also previously served as a New York State Assemblyman, and as the 26th borough president of Manhattan.
I ...
found that only 18 of the original 300 cars had been delivered within the contract's deadline. Additionally, on January 8, 2020, all cars in revenue were taken out of passenger service following two incidents involving R179 cars with defective door parts on the C train, forcing several older cars to fill in for service while the R179s underwent safety inspections. The January incidents raised concerns that train doors could malfunction while the trains were in service, and that doors could potentially open up when the train was in motion. Due to this incident and prior issues, the R179s became known as "lemons
The lemon (''Citrus limon'') is a species of small evergreen trees in the flowering plant family Rutaceae, native to Asia, primarily Northeast India (Assam), Northern Myanmar or China.
The tree's ellipsoidal yellow fruit is used for culina ...
". Aside from the door issues, the Transport Workers Union of America
Transport Workers Union of America (TWU) is a United States labor union that was founded in 1934 by subway workers in New York City, then expanded to represent transit employees in other cities, primarily in the eastern U.S. This article dis ...
has complained about problems with operating the R179, such as stiff windows, slippery controls, and other design flaws. The R179s were repaired, and the fleet re-entered service on January 24, 2020. By March 24, 2020, all 318 cars entered service.
On June 3, 2020, a set of R179s running on the A train had its link bar separated between the sixth and seventh cars while in service at Chambers Street station, causing the consist to be split into two. The entire fleet was subsequently pulled from service and underwent thorough safety investigations to address any in-service issues that do occur. A portion of the recently-retired R32 fleet was reactivated to fill in for the fleet shortage during the investigations. After thorough safety investigations, the fleet re-entered service on September 23, 2020.
References
External links
*
nycsubway.org: New Technology Trains - B Division
MTA Committee Meeting Discussing the R179
Staff Summary
{{NYCS rolling stock
R179
The R179 is a class of 318 New Technology Train subway cars built by Bombardier Transportation for the New York City Subway's B Division. Entering service between 2017 and 2020, the cars replaced all remaining R32s and R42s.
The R179 order ...