Qadirpur Gas Field
   HOME

TheInfoList



OR:

Qadirpur gas field is one of the major gas reserves of Pakistan. The field is located at a distance of from Ghotki in
Sindh Sindh (; ; ur, , ; historically romanized as Sind) is one of the four provinces of Pakistan. Located in the southeastern region of the country, Sindh is the third-largest province of Pakistan by land area and the second-largest province ...
Province. Discovered in March 1990, it is a joint venture between Oil and Gas Development Company, KUFPEC Pakistan B.V., PKP Exploration Ltd (Premier Oil), PKP2 Exploration Ltd (KUFPEC) and Petroleum Pakistan Limited, each holding 75%, 8.5%, 4.75%, 4.75% and 7% respectively. The Qadirpur gas field is currently one of OGDCL largest operated gas producing fields, accounting for 34%, 32% and 29% of OGDCL net gas production for 2012, 2013 and 2014, respectively. The field is located 8 km from Ghotki, 70 km northeast of Sukkur and 100 km east of Jacobabad in Sindh province.its it is located from main (90 km, sadiqabad = karachi, 540 km) highway road stop ahmed ki, 4 km away inside. Gas production on this field commenced in September 1995 by Prime Minister
Benazir Bhutto Benazir Bhutto ( ur, بینظیر بُھٹو; sd, بينظير ڀُٽو; Urdu ; 21 June 1953 – 27 December 2007) was a Pakistani politician who served as the 11th and 13th prime minister of Pakistan from 1988 to 1990 and again from 1993 t ...
after the installation of gas gathering facilities and processing plants. Of the 70 wells that have been drilled at this field, 57 are currently producing wells. Six have been abandoned, five are shut-in and two are water disposal wells. For FY 2015–16, average net daily production at this field was per day at standard conditions of purified gas with per day of permeate gas. The field's main customers are
Sui Northern Gas Pipelines Limited Sui Northern Gas Pipelines Limited (SNGPL) ( ur, ) was incorporated as a private limited Company in 1963 and later converted into a public limited company in January 1964 under the Companies Act 1913 of British India, now The Companies Act 2017 ...
, Engro Powergen Qadirpur Limited near Ghotki and Liberty Power Limited Daharki (320 mW power supply generating). A gas processing facility of per day at standard conditions was installed at Qadirpur during 2006–7. In order to address declining reservoir pressures, gas compression facilities were being installed at the field to maintain sales gas supply at contractual delivery pressures. The natural gas is purified by a membrane separation process that removes water vapor and carbon dioxide. The processing equipment was supplied by Honeywell’s UOP Separex™ Membrane Systems division. The process consists of ten trains of membrane skids, each containing many spiral-wound membrane elements. During the second quarter of 2009–10, average daily sales from Qadirpur was per day at standard conditions purified gas and per day dehydrated gas, which was sold to SNGPL, per day raw gas sold to Liberty Power and of condensate. The field was developed in three phases, increasing its capacity from per day at standard conditions. A project was completed in December 2007, to enhance sales per day. Development drilling at Qadirpur is continuing to maintain the gas supply to Southern Natural Gas PL. In 2009, gas flow was declined from per day at standard conditions. Thus a front end compression project was initiated to maintain the pressure of extracted gas and completed in 2011. As a part of project, 14 Waukesha engine driven Reciprocating compressors were installed by Valerus company. Later, 3 solar turbine driven centrifugal compressors were also installed which were previously working at Pirkoh gas field (Balochistan). These compressors increase the pressure of gas from . Later in 2010, Qadirpur gas field started supplying per day at standard conditions of permeate gas to Engro powergen (previously Engro power limited), which is generating 270 MW supply With the passage of time, field is depleting and gas flow has been further declined to per day in 2017, In 2021-22 solar turbines provided retrofit of existing solarturbines with new compressor for changing pressure conditions, the commissioning is still under progress. Ownership group led by: Oil & Gas Development Company Limited (OGDCL); Location: Qadirpur, Ghotki, Sindh, Pakistan Completion Date: August 1995


See also

* Fuel extraction in Pakistan


References


External links


Oil and Gas Development Company Limited WebsiteDawn News WebsiteExpress Tribune Website
{{DEFAULTSORT:Qadirpur Gasfield Natural gas fields in Pakistan