HOME

TheInfoList



OR:

The Putrajaya Monorail is an incomplete
monorail A monorail (from "mono", meaning "one", and " rail") is a railway in which the track consists of a single rail or a beam. Colloquially, the term "monorail" is often used to describe any form of elevated rail or people mover. More accurat ...
system in Putrajaya,
Malaysia Malaysia ( ; ) is a country in Southeast Asia. The federation, federal constitutional monarchy consists of States and federal territories of Malaysia, thirteen states and three federal territories, separated by the South China Sea into two r ...
. Construction has been stalled since 2004, but in 2020, it was stated that the system would be completed by 2025. Putrajaya was originally planned to include a light rail system, but plans were changed, and a monorail plan was selected instead, after the construction of tunnels for aforementioned system began. It called for two sublines; Line 1, which is a monorail route with 17 stations and Line 2, which is a monorail route with 6 stations. In 2019, the government proposed a new
light rapid transit A medium-capacity system (MCS), also known as light rapid transit or light metro, is a rail transport system with a capacity greater than light rail, but less than typical heavy-rail rapid transit. MCS’s trains are usually 1-4 cars, or 1 lig ...
(LRT) system may be built to revive the incomplete monorail project. The monorail will include the Monorail Suspension Bridge, currently incomplete, and the
Putra Bridge Putra Bridge is the main bridge in Putrajaya, Malaysia. It is analogous to Khaju Bridge in Isfahan (city), Esfahan, Iran. With a span of 435 metres, this bridge connects the Government Precinct to the Mixed Development Precinct and links Putra Squ ...
. The monorail line would allow transfers to the existing
KLIA Transit The ERL KLIA Transit is a commuter rail service which serves as an airport rail link to the Kuala Lumpur International Airport (KLIA) in Malaysia. It runs from KL Sentral, the main railway station of Kuala Lumpur to KLIA as well as its low-co ...
, connecting to
Kuala Lumpur , anthem = ''Maju dan Sejahtera'' , image_map = , map_caption = , pushpin_map = Malaysia#Southeast Asia#Asia , pushpin_map_caption = , coordinates = , sub ...
and
Kuala Lumpur International Airport Kuala Lumpur International Airport (KLIA) is Malaysia's main international airport. It is located in the Sepang District of Selangor, approximately south of Kuala Lumpur and serves the city's greater conurbation. KLIA is the largest and ...
, and the currently under construction MRT
Putrajaya line The MRT Putrajaya Line is the second Mass Rapid Transit (MRT) line in Klang Valley, Malaysia, and the third fully automated and driverless rail system in region. The line stretches from to Putrajaya and runs through densely populated area ...
at Putrajaya/Cyberjaya ERL station. The project originally cost RM400 million.


Project Status

Construction was halted in , and will probably resume as the city becomes more populated. In 2016, the
MMC Corporation Berhad MMC Corporation Berhad (abbreviated as MMC; ) is a Malaysian utility and infrastructure conglomerate, with diversified businesses under three divisions: Energy & Utilities, Ports & Logistics, and Engineering. Syed Mokhtar Albukhary is the company's ...
(MMC) submitted a proposal to the Economic Council (EC) to revive the stalled monorail project. The Land Public Transport Commission (SPAD) was due to conduct a feasibility study for monorail and tram services for both Putrajaya and Cyberjaya. In October 2020, the government announced it had opened a request for proposals process to complete the project, within three months. As of 2021, the RFP has not yet opened.


Putrajaya Tram Proposal

Federal Territories Minister, Datuk Seri Tengku Adnan Tengku Mansor, had hoped to get
tram A tram (called a streetcar or trolley in North America) is a rail vehicle that travels on tramway tracks on public urban streets; some include segments on segregated right-of-way. The tramlines or networks operated as public transport are ...
infrastructure construction going within three years. Now under the jurisdiction of the Economic Council, the minister saw the development of the tram system as an alternative solution to the abandoned
monorail A monorail (from "mono", meaning "one", and " rail") is a railway in which the track consists of a single rail or a beam. Colloquially, the term "monorail" is often used to describe any form of elevated rail or people mover. More accurat ...
projects and recommended it be built due to cost considerations. SPAD had hoped to open up tenders for the tram system between Putrajaya and Bangi in 2018 after getting the green light from EC. This move was announced by SPAD during their annual review of public transportation for 2017. The tram system was selected due to its relatively cheaper price of construction and operation compared to conventional rail systems. The tram system is expected to be integrated with the existing and future rail lines between Putrajaya and Bangi and will also cover the distance between Cyberjaya and Kajang. The new MRT Sungai Buloh - Kajang Line only reaches Kajang but MRT Sungai Buloh - Serdang - Putrajaya Line will reach Putrajaya Sentral when it is completed in the future. The future HSR station located at Kampung Abu Bakar Baginda will be one of the expected stops along the planned tram route. The stretch between Putrajaya and Bangi has been selected as the first phase to be constructed due to their wide roads, allowing the tram system to share the traffic.


See also

* Monorails in Malaysia


References


External links


Structurae: Putrajaya Monorail
{{Urban Rail Transit in ASEAN Transport in Putrajaya Monorails in Malaysia Proposed rail infrastructure in Malaysia