Lekki Deep Sea Port, operational, but still partly under construction, is a multi-purpose, deep sea port in the Lagos Free Zone. It is the largest seaport of
Nigeria Nigeria ( ), , ig, Naìjíríyà, yo, Nàìjíríà, pcm, Naijá , ff, Naajeeriya, kcg, Naijeriya officially the Federal Republic of Nigeria, is a country in West Africa. It is situated between the Sahel to the north and the Gulf o ...
and one of the biggest in West Africa. Lekki port is to be expanded to have a capacity of handling around 6 million TEUs of containers and a significant volume of liquid and dry bulk uncontainerized cargoes. The port is to be equipped with ships able to transport over 14,500 containers. The port is being developed in phases. Its phase one, be operational in 2018, chiefly comprises it three container berths equipped to handle more than 1.8 million TEUs — one berth for dry bulk goods and two berths for liquid cargo. The port is financed by private investors and a consortium of banks who have funded the project with $1.5 billion as of March 2021. The seaport is to occupy up to 90 hectares of land. It is expected to be completed in 2023 and operations to commence in the first half. On October, 31st, 2022, the port has been handed over to the owners. Commissioning will start "in the next month". Lagos State governor Sanwo-Olu promised on this occasion to expand the roads to the port to 6 lane highways.


Design

The layout of the port, including the layout of the approach channel, turning circle, and
harbor A harbor (American English), harbour (British English; see spelling differences), or haven is a sheltered body of water where ships, boats, and barges can be docked. The term ''harbor'' is often used interchangeably with ''port'', which is a ...
basins have been derived from optimizations based on port operations, construction costs, and possible future extensions. Two different breakwater concepts were applied for the main breakwater: A rubble mound with geo-bag core for the near-shore sections and a composite breakwater for the more exposed sections. The main breakwater is 1.5 km long. The secondary breakwater was replaced by a barrier. The barrier consists of a core from sand, internally fortified by a protective geo-bag layer, a revetment on the harbor side, and an artificial beach on the seaward side. The turning circle is 600 meters, enough for a vessel up to 16,000 standard containers (teu). The approach channel is 11 km long.


Terminals

The port has three terminals: the container terminal, the liquid terminal and the dry bulk terminal.


Container terminal

The container terminal has an initial draft of 14 metres, with the potential for further dredging to 16.5 metres. The terminal is able to handle 2.5 million twenty-foot standard containers per year. The deep-sea port of Lekki is the first port in Nigeria with ship-to-shore cranes. It has three of these container gantry cranes; they belong to the "Super-post-Panamax" group - this means that they can reach and unload the rearmost row of containers even if the container ship is wider than the
Panama Canal The Panama Canal ( es, Canal de Panamá, link=no) is an artificial waterway in Panama that connects the Atlantic Ocean with the Pacific Ocean and divides North and South America. The canal cuts across the Isthmus of Panama and is a conduit ...
(49 m or 160 ft maximum boat beam). The STS cranes have a fixed rail at the quayside. They can lift 65 tons in twin-lift mode, 50 tons in single-lift mode or 85 tons under a hook. The outreach from the quayside is 61 meters (this corresponds to 25 container rows). - The world's biggest container ship (as of 2022), the
EVER ALOT Ever may refer to: * Ever (artist), creator of street art, from Buenos Aires, Argentina * Ever, Kentucky * -ever, an English suffix added to interrogative words in forms like ''wherever'' * KT Tech EVER, a South Korean mobile phone manufacturer o ...
, has a width of 61,5 meters. - The air draft (the maximum height from which containers can be picked up) is 52 meters. Each STS crane generates 300 lux of light, which means that even at night the area around the crane will be nearly as bright as daylight. Cameras will assist operators when working at difficult angles. The port's computerised system will allow container identification and clearance from the office, and human interaction will be minimal in the physical operations. Nevertheless, the port will create 169,972 jobs, according to executive director, Du Ruogang. The additional revenue for the Nigerian state through taxes, levies and royalties is estimated at $201 billion. A directive from President Buhari (who will, however, leave office at the beginning of 2023) provides for the deep-sea port to be connected to the Nigerian rail network.


Liquid cargo terminal

When phase 2 will be finished, the deep sea port will have 3 liquid berths. The liquid cargo terminal will handle vessels up to 45,000 DWT (dead weight tonnage) and can expand to reach a capacity of 160,000 DWT. Liquids (like petrol or diesel) will be handled at a tank farm near the port. The docking area is equipped with loading arms. It is also connected by pipelines along the breakwater. In December 2022 the Chief Operating Officer of Lekki Port LFTZ Enterprise Limited, Laurence Smith, opened talks with potential operators of the Liquid berth terminals. This would be critical to the commencement of the construction of Phase 2 of the port.


Dry bulk terminal

The bulk terminal will be finished with phase 2 and will be situated on the west side of the container terminal. The available quay length of 300m can accommodate a Panamax class vessel (75,000 DWT). Bulk products are brought to storage areas, such as
silo A silo (from the Greek σιρός – ''siros'', "pit for holding grain") is a structure for storing bulk materials. Silos are used in agriculture to store fermented feed known as silage, not to be confused with a grain bin, which is used t ...
s and
warehouse A warehouse is a building for storing goods. Warehouses are used by manufacturers, importers, exporters, wholesalers, transport businesses, customs, etc. They are usually large plain buildings in industrial parks on the outskirts of cities ...
s, via covered conveyor systems. The bulk terminal capacity is around 4 million tonnes of dry bulk annually.


Rail connection

On December 29, 2022, Lekki Port Enterprises announced, that it will fund a 800 million USD railway line from the harbour to
Ijebu-Ode Ijebu-Ode is a town in Ogun State, Nigeria, South Western geopolitical zone in Nigeria, close to the A121 highway (Nigeria), A121 highway. The city is located 110 km by road north-east of Lagos; it is within of the Atlantic Ocean in the e ...
, where it will connect to the proposed railway line
Lagos Lagos (Nigerian English: ; ) is the largest city in Nigeria and the List of cities in Africa by population, second most populous city in Africa, with a population of 15.4 million as of 2015 within the city proper. Lagos was the national ca ...
- Benin-City-
Calabar Calabar (also referred to as Callabar, Calabari, Calbari and Kalabar) is the capital city of Cross River State, Nigeria. It was originally named Akwa Akpa, in the Efik language. The city is adjacent to the Calabar and Great Kwa rivers and cre ...
(Eastern railway line).


Start of operation

On July 1, 2022, the first ship, ''"Zhen Hua 28"'' from
Hongkong Hong Kong ( (US) or (UK); , ), officially the Hong Kong Special Administrative Region of the People's Republic of China (abbr. Hong Kong SAR or HKSAR), is a city and special administrative region of China on the eastern Pearl River Delta i ...
, docked at the deep sea port of Lekki. The vessel brought three Super Post Panamax Ship To Shore (STS) cranes and ten Rubber Tyred Gantry cranes. Early August 2022, a second ship, ''"Zhen Hua 35"'' from
Shanghai Shanghai (; , , Standard Mandarin pronunciation: ) is one of the four direct-administered municipalities of the People's Republic of China (PRC). The city is located on the southern estuary of the Yangtze River, with the Huangpu River flow ...
, brought the second shipment, two STS cranes including 115 packages of accessories, and 5 Rubber-Tyre-Gantry cranes including 270 packages of accessories. The port management announced in August 2022, that the port will be opened by the next month. According to managing director of the Nigerian Ports Authority (NPA), Mohammed Bello-Koko, tests and dry runs will be underway at the deepwater port from 16 September 2022. Recruitment has already been carried out. The necessary training with the cranes, the computer system and the clearance system is taking place, but still needs some time. Other West African countries, such as
Chad Chad (; ar, تشاد , ; french: Tchad, ), officially the Republic of Chad, '; ) is a landlocked country at the crossroads of North and Central Africa. It is bordered by Libya to the north, Sudan to the east, the Central African Republic ...
,
Mali Mali (; ), officially the Republic of Mali,, , ff, 𞤈𞤫𞤲𞥆𞤣𞤢𞥄𞤲𞤣𞤭 𞤃𞤢𞥄𞤤𞤭, Renndaandi Maali, italics=no, ar, جمهورية مالي, Jumhūriyyāt Mālī is a landlocked country in West Africa. Mali ...
,
Niger ) , official_languages = , languages_type = National languagesCameroon Cameroon (; french: Cameroun, ff, Kamerun), officially the Republic of Cameroon (french: République du Cameroun, links=no), is a country in west-central Africa. It is bordered by Nigeria to the west and north; Chad to the northeast; the C ...
, have already shown interest in handling their imports and exports through the deep sea port of Lekki.


References

{{DEFAULTSORT:LAGOS Transport infrastructure under construction in Nigeria Ports and harbours of Lagos Lekki