Pokhara International Airport
   HOME

TheInfoList



OR:

Pokhara International Airport ( ne, पोखरा अन्तर्राष्ट्रिय विमानस्थल) is an international airport in Pokhara,
Gandaki Province Gandaki Province ( ne, गण्डकी प्रदेश ) ), is one of the seven federal provinces established by the current constitution of Nepal which was promulgated on 20 September 2015. Pokhara is the province's capital city. It borde ...
,
Nepal Nepal (; ne, :ne:नेपाल, नेपाल ), formerly the Federal Democratic Republic of Nepal ( ne, सङ्घीय लोकतान्त्रिक गणतन्त्र नेपाल ), is a landlocked country in S ...
. It is located east of the old domestic airport, which it will gradually replace. The airport is Nepal's third international airport and officially began operations on 1 January 2023, with STOL-operations to Jomsom still being operated from the old airport. The airport is expected to handle one million passengers per year.


History

The concept of constructing an international airport in Pokhara was first developed in 1971. In 1976, the
Government of Nepal The Government of Nepal ( ne, नेपाल सरकार) is the federal executive authority of Nepal. Prior to the abolition of the Nepali monarchy in 2006 (became republic in 2008), it was officially known as His Majesty's Government. T ...
acquired land for that purpose. In 1989, the
Japan International Cooperation Agency The is a governmental agency that delivers the bulk of Official Development Assistance (ODA) for the government of Japan. It is chartered with assisting economic and social growth in developing countries, and the promotion of international co ...
conducted a study regarding the construction of the airport. The project stalled, however, and was reinitiated in 2009, when a new agreement on air travel between
India India, officially the Republic of India (Hindi: ), is a country in South Asia. It is the seventh-largest country by area, the second-most populous country, and the most populous democracy in the world. Bounded by the Indian Ocean on the so ...
and
Nepal Nepal (; ne, :ne:नेपाल, नेपाल ), formerly the Federal Democratic Republic of Nepal ( ne, सङ्घीय लोकतान्त्रिक गणतन्त्र नेपाल ), is a landlocked country in S ...
was signed. In 2013, the
Civil Aviation Authority of Nepal The Civil Aviation Authority of Nepal (CAAN, ne, नेपाल नागरिक उड्डयन प्राधिकरण, translit=Nepāl Nāgarik Uḍḍayan Prādhikaraṇ) is an independent civil aviation regulator. It was establishe ...
signed an agreement wit
China CAMC Engineering
for the construction of the airport. The construction started in April 2016 and was expected to be completed after five years in 2021, with a cost of around
US$ The United States dollar (symbol: $; code: USD; also abbreviated US$ or U.S. Dollar, to distinguish it from other dollar-denominated currencies; referred to as the dollar, U.S. dollar, American dollar, or colloquially buck) is the official ...
305 million, out of which The Export-Import Bank of China provided around US$215 million preferential loan to Nepal and provided part of loan interest to lower the total loan interest. Further, the
Asian Development Bank The Asian Development Bank (ADB) is a regional development bank established on 19 December 1966, which is headquartered in the Ortigas Center located in the city of Mandaluyong, Metro Manila, Philippines. The bank also maintains 31 field offic ...
provided US$37 million in loans and grants and the
OPEC Fund for International Development The OPEC Fund for International Development (OPEC Fund) is an intergovernmental development finance institution established in 1976 by the member states of the Organization of the Petroleum Exporting Countries (OPEC). The OPEC Fund was conceived ...
provided a US$11 million loan. In April 2016, then
Prime Minister A prime minister, premier or chief of cabinet is the head of the cabinet and the leader of the ministers in the executive branch of government, often in a parliamentary or semi-presidential system. Under those systems, a prime minister i ...
KP Sharma Oli Khadga Prasad Sharma Oli ( ne, खड्गप्रसाद शर्मा ओली, ; born 22 February 1952) is a Nepalese politician and former Prime Minister of Nepal. He served three terms as prime minister from 11 October 2015 to 3 Augu ...
laid the
foundation stone The cornerstone (or foundation stone or setting stone) is the first stone set in the construction of a masonry foundation. All other stones will be set in reference to this stone, thus determining the position of the entire structure. Over tim ...
of the airport, with the aim of beginning operations at the airport on 10 July 2021. In 2020, it was proposed to open both new international airports of Nepal, Pokhara and
Gautam Buddha Airport Gautam Buddha International Airport , also known as Bhairahawa Airport, is an international airport located in Siddharthanagar (formerly and colloquially still called Bhairahawa) serving Lumbini in Lumbini Province, as well as the Butwal﹣Siddh ...
, on the same day. In 2020, it was revealed that the close-by Rithepani Hill to the eastern end of the runway would needed to be flattened to ease approach to the airport. This decision to was delayed due to severe protesting by locals. The flattening did not start until late 2022. Due to the
COVID-19 pandemic in Nepal The COVID-19 pandemic in Nepal is part of the worldwide pandemic of coronavirus disease 2019 () caused by severe acute respiratory syndrome coronavirus 2 (). The first case in Nepal was confirmed on 23 January 2020 when a 31-year-old s ...
, in 2021, the construction deadline was extended until 2022. In October 2021, officials confirmed that the airport would open in two steps: domestic flights will begin in January 2022, while international flights will begin in April 2022. In 2022, it was announced that
calibration flights In measurement technology and metrology, calibration is the comparison of measurement values delivered by a device under test with those of a calibration standard of known accuracy. Such a standard could be another measurement device of know ...
would begin in October 2022. They would later take place in late November 2022. In mid-2022, the
Civil Aviation Authority of Nepal The Civil Aviation Authority of Nepal (CAAN, ne, नेपाल नागरिक उड्डयन प्राधिकरण, translit=Nepāl Nāgarik Uḍḍayan Prādhikaraṇ) is an independent civil aviation regulator. It was establishe ...
pushed back the opening to December 2022 due to a lack of flight inspections. On 8 August 2022, the
Civil Aviation Authority of Nepal The Civil Aviation Authority of Nepal (CAAN, ne, नेपाल नागरिक उड्डयन प्राधिकरण, translit=Nepāl Nāgarik Uḍḍayan Prādhikaraṇ) is an independent civil aviation regulator. It was establishe ...
set the official opening date for 1 January 2023. The airport was inaugurated by Prime Minister
Pushpa Kamal Dahal Pushpa Kamal Dahal ( ne, पुष्पकमल दाहाल; born 11 December 1954), also widely known by his nom de guerre Prachanda (, ; meaning "fierce"), is a Nepalese politician serving as the current Prime Minister of Nepal. He pre ...
on 1 January 2023. To celebrate the occasion, the city of Pokhara declared the day a public holiday. The first flight to arrive at the airport was a
Buddha Air Buddha Air Pvt. Ltd ( ne, बुद्ध एयर) is an airline based in Jawalakhel, Lalitpur, Nepal, near Patan. It operates domestic as well as international services within Nepal and India, serving mainly large towns and cities in Ne ...
flight carrying the Prime Minister and his delegation. Development of the airport continued immediately after the opening with an initial lack of customs facilities and a fuel depot - initially, fuel was being carried from old- Pokhara Airport on trucks.


Facilities

The airport is built to the category 4D standard, set by the ICAO, IATA, and
FAA The Federal Aviation Administration (FAA) is the largest transportation agency of the U.S. government and regulates all aspects of civil aviation in the country as well as over surrounding international waters. Its powers include air traffic m ...
.


Apron

The apron of the airport can handle up to 3
narrowbody aircraft A narrow-body aircraft or single-aisle aircraft is an airliner arranged along a single aisle, permitting up to 6-abreast seating in a cabin less than in width. In contrast, a wide-body aircraft is a larger airliner usually configured with mu ...
with two aerobridges, while the aprons at the domestic terminal are capable of accommodating up to four
ATR-72 The ATR 72 is a twin-engine turboprop, Flight length, short-haul regional airliner developed and produced in France and Italy by Aerospace manufacturer, aircraft manufacturer ATR (aircraft manufacturer), ATR (french: Avions de transport région ...
or Bombardier Q400 type and four Beechcraft 1900 or de Havilland Canada DHC-6 Twin Otter type small aircraft.


Runway

The airport has a single long runway with a width of 45 meters. It has an east-west orientation with a 330 m runway strip. The airport has a concrete runway and has the markings of the centerline, edge, touchdown zone, and the threshold. The taxiway of 1.2km long and 23 m wide, is built from the runway central line on the north side parallel to the runway. The airside infrastructure works also includes two 182.5m x 23m exit taxiways, access roads, and aerodrome pavement. The runway is capable of handling aircraft such as the
Airbus A320 The Airbus A320 family is a series of narrow-body airliners developed and produced by Airbus. The A320 was launched in March 1984, first flew on 22 February 1987, and was introduced in April 1988 by Air France. The first member of the famil ...
and the
Boeing 737 The Boeing 737 is a narrow-body aircraft produced by Boeing at its Boeing Renton Factory, Renton Factory in Washington (state), Washington. Developed to supplement the Boeing 727 on short and thin routes, the twinjet retains the Boeing 707, 7 ...
. All international landings and takeoffs will be done using the Eastern part of the runway. Domestic flights and landings will use both Eastern and Western sides.


Aids to Navigation

The airport features a 2,500m²
Air Traffic Control Air traffic control (ATC) is a service provided by ground-based air traffic controllers who direct aircraft on the ground and through a given section of controlled airspace, and can provide advisory services to aircraft in non-controlled airs ...
(ATC) tower, operations building and an air navigation unit. There are two
non-precision approach In aviation, an instrument approach or instrument approach procedure (IAP) is a series of predetermined maneuvers for the orderly transfer of an aircraft operating under instrument flight rules from the beginning of the initial approach to a landi ...
es available at the Pokhara Airport;
VHF omnidirectional range Very high frequency omnirange station (VOR) is a type of short-range radio navigation system for aircraft, enabling aircraft with a receiving unit to determine its position and stay on course by receiving radio signals transmitted by a network ...
along a distance measuring equipment (
VOR/DME In radio navigation, a VOR/DME is a radio beacon that combines a VHF omnidirectional range (VOR) with a distance-measuring equipment (DME). The VOR allows the receiver to measure its bearing to or from the beacon, while the DME provides the s ...
) and Required Area Navigation (RNAV/RNP). The airport is also equipped with a CAT-I ILS system, which includes equipment such as the localizer and the glide path to help aircraft in navigation. The ATC tower also supports Wide area multilateration (WAM) based surveillance system, the first of its kind in Nepal. High intensity extended centerline lights are installed at the southern end of the airport to assist with the approach. It is equipped with advanced communication, navigation, and monitoring equipment and a high-end navigational lighting system. A QNH altimeter setting will be made available in approach and landing instructions.


Terminals

There are two public terminals at the airport, one for international traffic and one for domestic traffic. The new airport infrastructure includes a 10,000 square meters international terminal building with a steel roof as well as a 3,500m² customs and cargo building. The international terminal can handle up to 610 departing passengers per hour. Two terminals, one domestic and one international, will be able to handle one million passengers annually. The 4,000m² domestic terminal is located to the western side of the airport.


Aircraft Maintenance

Buddha Air Buddha Air Pvt. Ltd ( ne, बुद्ध एयर) is an airline based in Jawalakhel, Lalitpur, Nepal, near Patan. It operates domestic as well as international services within Nepal and India, serving mainly large towns and cities in Ne ...
plans on constructing a
hangar A hangar is a building or structure designed to hold aircraft or spacecraft. Hangars are built of metal, wood, or concrete. The word ''hangar'' comes from Middle French ''hanghart'' ("enclosure near a house"), of Germanic origin, from Frankish ...
that can accommodate aircraft up to the size of an
Airbus A319 The Airbus A319 is a member of the Airbus A320 family of short- to medium-range, narrow-body, commercial passenger twin-engine jet airliners manufactured by Airbus. The A319 carries 124 to 156 passengers and has a maximum range of . Final assem ...
. The airport will also feature a 6,000m² domestic and international hangar.


Air Routes

There is no direct air route to Pokhara International Airport or
Gautam Buddha International Airport Gautam Buddha International Airport , also known as Bhairahawa Airport, is an international airport located in Siddharthanagar (formerly and colloquially still called Bhairahawa) serving Lumbini in Lumbini Province, as well as the Butwal﹣Siddh ...
. Nepal has only one incoming air route through the South via Simara which is crowded and increases flight times for the remaining international airports in the country. Nepal has asked India since 2014 (or earlier) for new air routes, but has not received them. Even though air routes are governed by the
Freedoms of the air The freedoms of the air are a set of commercial aviation rights granting a country's airlines the privilege to enter and land in another country's airspace. They were formulated as a result of disagreements over the extent of aviation liberalis ...
commercial aviation rights, India and Nepal are both signatories to it but one of India's reasons is that it involves India's security. Nepal has also proposed Himalaya 1, 2 and 3 air routes. These have not been implemented yet.


Airlines and destinations

In 2018,
Buddha Air Buddha Air Pvt. Ltd ( ne, बुद्ध एयर) is an airline based in Jawalakhel, Lalitpur, Nepal, near Patan. It operates domestic as well as international services within Nepal and India, serving mainly large towns and cities in Ne ...
first announced that it was planning to operate its planned international fleet of
Boeing The Boeing Company () is an American multinational corporation that designs, manufactures, and sells airplanes, rotorcraft, rockets, satellites, telecommunications equipment, and missiles worldwide. The company also provides leasing and p ...
or
Airbus Airbus SE (; ; ; ) is a European multinational aerospace corporation. Airbus designs, manufactures and sells civil and military aerospace products worldwide and manufactures aircraft throughout the world. The company has three divisions: ' ...
aircraft out of the airport. In mid-2021,
Biman Bangladesh Airlines Biman Bangladesh Airlines ( bn, বিমান বাংলাদেশ এয়ারলাইন্স) commonly known as Biman ( bn, বিমান), pronounced (), is the national flag carrier of Bangladesh. With its main hub at Hazr ...
was the first international carrier to plan to serve the airport upon opening. In November 2022, Buddha Air revealed plans to make
Varanasi Varanasi (; ; also Banaras or Benares (; ), and Kashi.) is a city on the Ganges river in northern India that has a central place in the traditions of pilgrimage, death, and mourning in the Hindu world. * * * * The city has a syncretic t ...
the first destination from the airport. However, as of January 2023, there are no scheduled international flights.


Access

The airport is located linked by an access road with the Prithvi Highway. Buses also connect the airport to Pokhara's city centre.


Gallery

File:Pokhar Intl Airport Front.jpg, Main Terminal and Control Tower File:Pokhara Intl Airport Terminal Tower Parking.jpg, Main Terminal Parking File:Fishtail from Pokhara Intl Airport.jpg, Overlooking Mount Fishtail (Machhapuchhre) File:Annapurna from Pokhara Intl Airport.jpg, Main Office Building File:Pokhara Intl Airport Parkage with a view of the mountains.jpg, With the Mountain Range File:Pokhara Intl Airport Access from the North.jpg, Access from the North File:Pokhara Intl Airport Fire Truck.jpg, Fire Truck


References

{{authority control Airports in Nepal National Pride Projects Buildings and structures in Pokhara 2023 establishments in Nepal