Pointe Du Bois
   HOME

TheInfoList



OR:

Pointe du Bois is a small community located northeast of
Winnipeg, Manitoba Winnipeg () is the capital and largest city of the province of Manitoba in Canada. It is centred on the confluence of the Red and Assiniboine rivers, near the longitudinal centre of North America. , Winnipeg had a city population of 749,6 ...
, in an unincorporated section of Census Division No. 1. Pointe du Bois has a
Manitoba Hydro The Manitoba Hydro-Electric Board, operating as Manitoba Hydro, is the electric power and natural gas utility in the province of Manitoba, Canada. Founded in 1961, it is a provincial Crown Corporation, governed by the Manitoba Hydro-Electric Boa ...
generating station (at ). The area provides great
fishing Fishing is the activity of trying to catch fish. Fish are often caught as wildlife from the natural environment, but may also be caught from stocked bodies of water such as ponds, canals, park wetlands and reservoirs. Fishing techniques inclu ...
for pickerel,
Northern pike The northern pike (''Esox lucius'') is a species of carnivorous fish of the genus ''Esox'' (the pikes). They are typical of brackish and fresh waters of the Northern Hemisphere (''i.e.'' holarctic in distribution). They are known simply as a p ...
and smallmouth bass. In April 2013 its owner, Manitoba Hydro announced that it will close the community by 2015 and level it to the ground at a later date. The crown corporation cites the high cost of maintaining municipal infrastructure as the primary reason for its decision.


Winnipeg Hydro Tramway

The tramway was originally built from a connection with the CPR at Lac du Bonnet to the City of Winnipeg's Pointe du Bois hydroelectric generating station on the Winnipeg River, to facilitate the transportation of construction materials and workers. Passenger service by conventional mixed train began in 1908. Beginning in late 1911 a series of a gasoline trams and rail buses provided most passenger service. An extension to the remote Slave Falls generating station opened in 1929. In 1962 the Pointe du Bois to Lac du Bonnet line was abandoned, ending common carrier passenger service. Passenger travel between the two dams continued by gasoline tram, but was not open to the public. A road was built between the two dams in 2011.


Winnipeg Hydro

In 1906, The City of Winnipeg Hydro Electric System (City Hydro) was formed as a publicly owned utility to check the power monopoly held by the privately owned Winnipeg Electric railway company (WERCo). Alderman John Wesley Cockburn, who held development rights to the Pointe du Bois generating station site on the Winnipeg River, surrendered these rights to the City for construction of a power plant. The generating station was completed in 1911 and it is still in operation in late 2013.


References


External links


75 MW Pointe du Bois Powering Canada Since 1911
Unincorporated communities in Eastman Region, Manitoba Whiteshell Provincial Park {{Manitoba-geo-stub