State Road 538 (SR 538), also known as the Poinciana Parkway, is a
toll road
A toll road, also known as a turnpike or tollway, is a public or private road (almost always a controlled-access highway in the present day) for which a fee (or ''Toll (fee), toll'') is assessed for passage. It is a form of road pricing typically ...
built in
Osceola
Osceola (1804 – January 30, 1838, Asi-yahola in Muscogee language, Creek), named Billy Powell at birth in Alabama, became an influential leader of the Seminole people in Florida. His mother was Muscogee, and his great-grandfather was a S ...
and
Polk
Polk may refer to:
People
* James K. Polk, 11th president of the United States
* Polk (name), other people with the name
Places
* Polk (CTA), a train station in Chicago, Illinois
* Polk, Illinois, an unincorporated community
* Polk, Missou ...
Counties, Florida. Construction began in 2013 and was completed in 2016. The road had been planned for decades to provide a traffic outlet from
Poinciana northwest to
US 17
U.S. Route 17 or U.S. Highway 17 (US 17), also known as the Coastal Highway, is a north–south United States Highway that spans in the southeastern United States. It runs close to the Atlantic Coast for much of its length, with ...
/
US 92
U.S. Route 92 or U.S. Highway 92 (US 92) is a 181-mile (291 km.) U.S. Route entirely in the U.S. state of Florida. The western terminus is at US 19 Alt. and SR 687 in downtown St. Petersburg. The eastern terminus is at SR A1A in Daytona ...
and
Interstate 4. Costs skyrocketed after land along the planned route was converted to a
mitigation bank, requiring a bridge to span most of the stretch through the restored wetland. The road was originally planned to be built by Avatar—the primary developer of Poinciana—as a four-lane, limited-access highway; after the decision was made to build the bridge across the mitigation bank a toll was planned for the bridge segment of the road, but the collapse of the
2000s housing bubble and increased costs forced Avatar to abandon their plans to build the private toll road. About the same time, Osceola County formed the Osceola County Expressway Authority to build a loop road around the Kissimmee-St.Cloud area, which would include the Poinciana Parkway.
Route description
The Poinciana Parkway is a two-lane,
controlled-access
A controlled-access highway is a type of highway that has been designed for high-speed vehicular traffic, with all traffic flow—ingress and egress—regulated. Common English terms are freeway, motorway and expressway. Other similar terms i ...
toll highway, designed to be expanded to a four-lane expressway,
that runs between the
Polk
Polk may refer to:
People
* James K. Polk, 11th president of the United States
* Polk (name), other people with the name
Places
* Polk (CTA), a train station in Chicago, Illinois
* Polk, Illinois, an unincorporated community
* Polk, Missou ...
-Osceola County line and the Cypress Parkway (CR 580) in
Poinciana, with a large section crossing undeveloped swampland. The highway is contiguous with Kinney Harmon Road in Polk County, which connects the Poinciana Parkway with
US 17
U.S. Route 17 or U.S. Highway 17 (US 17), also known as the Coastal Highway, is a north–south United States Highway that spans in the southeastern United States. It runs close to the Atlantic Coast for much of its length, with ...
/
US 92
U.S. Route 92 or U.S. Highway 92 (US 92) is a 181-mile (291 km.) U.S. Route entirely in the U.S. state of Florida. The western terminus is at US 19 Alt. and SR 687 in downtown St. Petersburg. The eastern terminus is at SR A1A in Daytona ...
in
Loughman. Across US 17/92, the road continues as the Ronald Reagan Parkway (former
County Road 54), which provides indirect access from the Poinciana Parkway to
Interstate 4.
From the northwest, the road passes through the Reedy Creek Mitigation Bank—a conserved area of wetlands—where it crosses a bridge,
then makes a turn to the south. South of the bridge, the parkway has grade-separated partial intersections (southbound exits, northbound entrances) with Marigold Avenue and KOA Street and terminates at an at-grade T-intersection with Cypress Parkway.
Electronic-only toll gantries are located between the RCMB bridge and Marigold Avenue and between Marigold Avenue and KOA Street; all tolls are collected using either wireless transponders (
SunPass or
E-Pass) or using "pay by plate" billing, in which a photo of the license plate is captured and the vehicle owner is sent a bill by mail for the appropriate toll.
With a SunPass or E-Pass transponder, a $1.75 toll is charged at a toll gantry north of Marigold Avenue to cross the RCMB and an additional $0.50 toll is charged between Marigold Avenue and KOA Street; the tolls using the pay-by-plate billing system are $1.95 and $0.70, respectively.
History
The Poinciana Parkway is a long-conceived road to provide access on the northwest side of the
planned urban development
Planning is the process of thinking regarding the activities required to achieve a desired goal. Planning is based on foresight, the fundamental capacity for mental time travel. The evolution of forethought, the capacity to think ahead, is c ...
of Poinciana. The first plans for the new community were made around 1970 to develop tens of thousands of acres of rural land along the border between Osceola and Polk Counties. Parker-Poinciana Properties, the developer owning the land on which Poinciana was built, envisioned a bedroom community of 250,000, minutes away from jobs and entertainment (plans to build nearby
Disney World
The Walt Disney World Resort, also called Walt Disney World or Disney World, is an entertainment resort complex in Bay Lake and Lake Buena Vista, Florida, United States, near the cities of Orlando and Kissimmee. Opened on October 1, 1971, th ...
were announced in 1966).
In the past, the proposed highway has also been called the "Parker Highway Project"
and "Parker-Poinciana Highway".
However, development proceeded slowly through the 1980s and early 1990s, in part due to inadequate planning. One significant problem that has limited development is limited road access to the area; Poinciana is surrounded by extensive wetlands and lakes with few arterial roads leading out of the community.
In the late 1970s, Polk County built an unrelated road also named "Poinciana Parkway" leading south and the Cypress Parkway was built leading west to
Haines City
Haines City is a city in Polk County, Florida, United States. Its population was 13,174 at the 2000 census and 20,535 at the 2010 census. It is the third most populous city in Polk County. It is part of the Lakeland– Winter Haven Metropolitan S ...
. In 1981, Poinciana Boulevard was extended to
US 192
U.S. Route 192 (US 192) is an east–west route of the United States Numbered Highway system in central Florida. It runs from U.S. Route 27 ( State Road 25) in Four Corners, Lake County, east past Walt Disney World and through Kissimmee, ...
to improve access to I-4 and Kissimmee. In 1998, Pleasant Hill Boulevard was widened to four lanes.
In the 2000s, a housing boom led to a huge increase in the town's population, from 13,647 in 2000 to 53,193 in 2010. Since Poinciana is intended to be a bedroom community, improved road access is seen as essential to the community's future; prior to the construction of the Poinciana Parkway, the average commute was 45 minutes, which was among the highest commute times for small cities in the US.
Avatar—one of the main developers of Poinciana—had long planned to connect Kinney Harmon Road with the Cypress Parkway in order to relieve congestion along Poinciana and Pleasant Hill Boulevards.
However, the highway would not be built until the company was able to develop the community according to plan. Despite being included in the comprehensive land use plans of both Polk and Osceola Counties, the Polk County Commission voted in 1997 to vacate right-of-way along Kinney Harmon Road to a developer to build a 495-lot mobile home park, a move that would effectively block construction of the Poinciana Parkway.
The commissioners noted that the road had been discussed for years, but there were still no plans to build it at the time.
Avatar sued the county and the
10th Judicial Circuit ruled that the commissioners did not explain why vacating the right-of-way would be in the public interest when making their decision.
Osceola County had objected the commissioners' decision and helped Avatar in the case, but did not join the lawsuit.
In 1994, Avatar spent $1.5 million for a conceptual permit from the
South Florida Water Management District
The South Florida Water Management District (SFWMD) is a regional governmental district that oversees water resources from Orlando to the Florida Keys. The mission of the SFWMD is to manage and protect water resources by balancing and improving w ...
and also received permission from the
US Army Corps of Engineers
, colors =
, anniversaries = 16 June (Organization Day)
, battles =
, battles_label = Wars
, website =
, commander1 = ...
to construct a road across wetland to the northwest of Poinciana, even though they did not own that land at the time.
In 1997, private investors received a permit from SFWMD to establish the Reedy Creek Mitigation Bank (RCMB) in the same area. The RCMB is a
mitigation bank to restore wetlands, which would then be protected in perpetuity by state and federal law.
The investors receive credits from the state for restoring and protecting the wetlands. Developers purchase the credits to offset the destruction of wetlands elsewhere.
The Poinciana Parkway would cross of the RCMB.
The establishment of the RCMB despite previous plans for the road became a barrier to the Poinciana Parkway's construction. There was concern of setting a precedent of allowing development in conservation areas that are supposed to be protected from development. In order to preserve the wetland habitat, officials wanted a bridge over the wetland habitat, while Avatar contended that bridging the wetland would be too expensive and proposed short bridges or culverts for water and animals to pass.
In 2008, the Army Corps of Engineers determined that the road could only be built if it included two bridges, adding $20–40 million to the project's cost or remove the land north of the wetlands from the bank, compensating the bank's owners. The Corps also considered other alignments that would avoid the bank, but concluded that they were worse logistically, environmentally, or traffic-wise.
In 1997, the highway was estimated to cost $8 million to connect the end of Kinney Harmon Road with the end of Marigold Avenue. The RCMB saga skyrocketed cost estimates to construct the four-lane highway from $22 million in 2004 to $140–200 million in 2008.
Avatar planned to build 10 miles (16 km) of road, retaining of the highway to operate as a toll road and donate the rest to Osceola County. In early 2008, Avatar planned to build the highway in 2009.
Avatar had originally planned to construct a four-lane divided expressway within a right-of-way that would allow expansion to a six-lane expressway with a frontage road. The company had also planned to convert Marigold Avenue into a limited-access road as part of the Poinciana Parkway project.
However, the
2000s housing bubble that drove significant growth of Poinciana collapsed and Avatar was unable to justify the costs or finance construction of the highway.
Around 2010, Avatar decided not to build the highway while at the same time, the state established the Osceola County Expressway Authority (OCX) to develop and built a series of toll road segments in Osceola County. The 2040 Master Plan developed by OCX has a loop route around the south and east sides of the Kissimmee-St.Cloud area. The Poinciana Parkway is a natural part of the proposed loop road.
In 2012, an agreement was reached between Orange County, Polk County, OCX, and Avatar to construct the highway. Avatar donated approximately $48 million worth of right-of-way, studies/engineering work, construction plans, and permits
and gave Polk County a parcel of land designated as a "public safety site" (future fire station and communications tower).
Osceola County agreed to provide $6 million and cover any shortfall between the cost of construction and the sale of bonds plus Polk County's contribution.
Polk County agreed to contribute $6 million to the project (of which $3 million was to be reimbursed by FDOT),
but is not obligated to contribute to any further expansion of the highway.
Construction
The construction of the Poinciana Parkway included the realignment/reconstruction of Kinney Harmon Road in Polk County and improvements to US 17/92 around the intersection with Kinney Harmon Road, improvements to the Cypress Parkway around the new intersection with the southern terminus of the Poinciana Parkway, and short extension of KOA Road.
Soon after its establishment, OCX decided to limit construction costs to $70 million,
a figure which is in addition to approximately $50 million of plans, permits, and right-of-way donated by Avatar, who will not be reimbursed. Because of the cost limit, the decision was made to build a two-lane highway initially, using a design that will easily permit the road to be widened to a four- or six-lane expressway in the future. In July 2013, a design-build contract for the highway was awarded to Jr. Davis Construction Company, based in Kissimmee.
The total contract amount was $69,013,443.76, representing $68,788,000.00 for the original contract and $225,443.76 for changes to the project after bidding.
The second-place bidder, Lane Construction Corporation, sued OCX after an appeal of the decision was rejected by the OCX board. Lane alleged that scoring of the bids were improperly skewed in Jr. Davis' favor and that the latter was not properly licensed. Lane's bid was cheaper, at $62 million, but OCX determined that the Jr. Davis bridge design was superior.
Lane did not succeed with the lawsuit and a notice to proceed, authorizing construction to begin, was issued in December 2013.
To construct the bridge, a temporary haul road was constructed across the RCMB.
The northern segment of the Poinciana Parkway, from US17/US92 to Marigold Avenue, opened to traffic on April 30, 2016;
the southern segment of the Poinciana Parkway, from Marigold Avenue to the Cypress Parkway, opened on November 18, 2016.
OCX and financing
Construction of the highway was primarily financed by the sale of
municipal bonds
A municipal bond, commonly known as a muni, is a bond issued by state or local governments, or entities they create such as authorities and special districts. In the United States, interest income received by holders of municipal bonds is often, ...
by OCX, backed financially by Osceola County.
About $42 million of the bonds were purchased by
Vanguard
The vanguard (also called the advance guard) is the leading part of an advancing military formation. It has a number of functions, including seeking out the enemy and securing ground in advance of the main force.
History
The vanguard derives fr ...
.
Standard & Poor's gave the bonds a
BBB- rating, just one level above
junk bond
In finance, a high-yield bond (non-investment-grade bond, speculative-grade bond, or junk bond) is a bond that is rated below investment grade by credit rating agencies. These bonds have a higher risk of default or other adverse credit events ...
status, calling OCX traffic expectations "aggressive."
The traffic projection for supporting the bond sale was 8,992 vehicles per day.
The first full week without a holiday after the opening of the entire highway, November 28-December 2, 2016, an average of 6,896 vehicles per day traveled the highway.
The rating may affect the proposed merger of OCX with the
Central Florida Expressway Authority
The Central Florida Expressway Authority (CFX) is a highway authority responsible for construction, maintenance and operation of toll roads in six counties of Greater Orlando (Lake, Orange, Osceola, Polk, Seminole, and Brevard Counties). It was ...
(CFX), which succeeded the Orlando Orange County Expressway Authority (OOCEA) in 2014. The state legislature has considered merging the two agencies to form a regional expressway authority that would also include
Lake
A lake is an area filled with water, localized in a basin, surrounded by land, and distinct from any river or other outlet that serves to feed or drain the lake. Lakes lie on land and are not part of the ocean, although, like the much large ...
and
Seminole
The Seminole are a Native American people who developed in Florida in the 18th century. Today, they live in Oklahoma and Florida, and comprise three federally recognized tribes: the Seminole Nation of Oklahoma, the Seminole Tribe of Florida, ...
Counties. In early 2014, prior to the creation of the CFX, OOCEA bonds had identical "A"/"A2" (from Fitch/Moody's) credit ratings
and there was concern that the poorly-rated OCX bonds would impact the finances of a combined agency and OOCEA bondholders.
The OOCEA's chairman Walter Ketcham remarked that the OCX bonds were so poorly rated "we wouldn't touch them with gloves".
In September 2016, CFX agreed to study future road projects in Osceola County, in order to determine which are viable for financing and construction, on behalf of OCX for an 18-month period. Legislation passed by the Florida legislature in 2014 envisions the CFX and OCX merging by 2018 and the agreement is a step towards that plan.
The OCX contracted with the CFX to collect all toll revenues and place them in a
trust indenture.
As trustees of the trust indenture,
BB&T
BB&T Corporation (previously known as the Branch Banking and Trust Company) was one of the largest banking and financial services firms in the United States, based in Winston-Salem, North Carolina. In 2019, BB&T announced its intentions to merge ...
is responsible for allocating receipts into nine different funds.
Future
The Osceola County Expressway Authority's 2040 master plan includes the Poinciana Parkway in a belt route around the Kissimmee area in northwest Osceola County. Both a connection to I-4, known as the I-4 Poinciana Parkway Connector, and a connection to Florida's Turnpike, a segment known as the Southport Connector, are undergoing alignment and environmental studies, which are expected to be completed in mid-2020.
The 2040 master plan includes an extension from the intersection of the Southport Connector and Florida's Turnpike around to the east end of the existing Osceola Parkway, including a connection with
SR 417
The following highways are numbered 417:
Canada
* Manitoba Provincial Road 417
* Newfoundland and Labrador Route 417
* Ontario Highway 417
Costa Rica
* National Route 417
Iceland
* Route 417
Japan
* Japan National Route 417
United States
* ...
and
Orlando International Airport.
Major intersections
See also
*
Central Florida Expressway Authority
The Central Florida Expressway Authority (CFX) is a highway authority responsible for construction, maintenance and operation of toll roads in six counties of Greater Orlando (Lake, Orange, Osceola, Polk, Seminole, and Brevard Counties). It was ...
*
Florida State Highway System
*
List of toll roads in Florida
Notes
References
External links
{{Attached KML, display=title,inline
SR 538 (Poinciana Parkway) – Central Florida Expressway AuthorityPoinciana Parkwaywebpage about the project from the Osceola County Expressway Authority
I-4 Poinciana Parkway Connectorwebsite about the feasibility study for the connector to I-4
Southport Conectorwebsite about the feasibility study for the Southport Connector to Florida's Turnpike
Toll roads in Florida
Roads in Osceola County, Florida
Parkways in the United States