Petone Workshops
   HOME

TheInfoList



OR:

The Petone Workshops were a government-owned railways maintenance and repair facility located in
Petone Petone (Māori: ''Pito-one''), a large suburb of Lower Hutt, Wellington, stands at the southern end of the Hutt Valley, on the northern shore of Wellington Harbour. The Māori name means "end of the sand beach". Europeans first settled in Pe ...
, in
Lower Hutt Lower Hutt ( mi, Te Awa Kairangi ki Tai) is a city in the Wellington Region of New Zealand. Administered by the Hutt City Council, it is one of the four cities that constitute the Wellington metropolitan area. It is New Zealand's sixth most p ...
in the
Wellington Wellington ( mi, Te Whanganui-a-Tara or ) is the capital city of New Zealand. It is located at the south-western tip of the North Island, between Cook Strait and the Remutaka Range. Wellington is the second-largest city in New Zealand by me ...
region of
New Zealand New Zealand ( mi, Aotearoa ) is an island country in the southwestern Pacific Ocean. It consists of two main landmasses—the North Island () and the South Island ()—and over 700 smaller islands. It is the sixth-largest island count ...
's North Island. It took over construction and maintenance of rolling stock in the Wellington region from the Pipitea Point facility, starting in 1876, and became the only such facility in the region from 1878 until the opening of the replacement
Hutt Workshops The Hutt Railway Workshops is a major railway engineering facility in the Lower Hutt suburb of Gracefield in the Wellington region of New Zealand's North Island. It is state-owned enterprise KiwiRail's only workshops, and was opened in 1930. ...
facility in 1929.


History


Predecessor

The first railway workshops in the Wellington region were near Wellington's first railway station at
Pipitea Point Pipitea Point railway station, a temporary building for the Hutt and Masterton railway, was Wellington's first railway station opened on 14 April 1874 with the Hutt Valley Line. The railway line from Wellington to Lower Hutt was started in 187 ...
. These workshops started out as a set of storage sheds for
rolling stock The term rolling stock in the rail transport industry refers to railway vehicles, including both powered and unpowered vehicles: for example, locomotives, freight and passenger cars (or coaches), and non-revenue cars. Passenger vehicles can b ...
when the first section of the
Wairarapa The Wairarapa (; ), a geographical region of New Zealand, lies in the south-eastern corner of the North Island, east of metropolitan Wellington and south-west of the Hawke's Bay Region. It is lightly populated, having several rural service ...
Line was being constructed from 1872 to 1874. Later a repair and erecting shop was built at the site at the behest of Messrs Brogden and Sons, who arranged for the workshops to be fitted out with equipment imported from
England England is a country that is part of the United Kingdom. It shares land borders with Wales to its west and Scotland to its north. The Irish Sea lies northwest and the Celtic Sea to the southwest. It is separated from continental Europe b ...
. The building was long by wide, with a seaward side lean-to long and wide. A single road entered the building, in which facilities were provided for
blacksmiths A blacksmith is a metalsmith who creates objects primarily from wrought iron or steel, but sometimes from other metals, by forging the metal, using tools to hammer, bend, and cut (cf. tinsmith). Blacksmiths produce objects such as gates, gr ...
with four forges, woodworking and carpentry, and a machine shop. A
stationary steam engine Stationary steam engines are fixed steam engines used for pumping or driving mills and factories, and for power generation. They are distinct from locomotive engines used on railways, traction engines for heavy steam haulage on roads, steam cars ...
was used to power the machinery using a system of shafts and belts. A 10-ton overhead crane straddled the track.


Replacement at Petone

The Pipitea Workshops site had not long been in operation when the volume of work required of it expanded beyond its capacity. Several sites for a new railway workshops facility were suggested, and it was eventually decided that Petone was the best option. In 1876, a small start was made on the new facility with the construction of a shed for the storage of four new Fell-type locomotives until they were required for the construction of the Rimutaka Incline. The Petone Workshops did not start to take shape until 1878 when, under the direction of the manager of the Wellington Section, Mr Ashcroft, work began in earnest, a decision largely prompted by the destruction of the Pipitea Workshops in a fire. Many of the buildings that would comprise the workshops facilities were erected between 1878 and 1881, though the nature of the site allowed for the later construction of other buildings as required. The arrangement of the workshops yard included a machine shop, boiler shop, and foundry at the northern (station) end, and a car and wagon depot, the lifters and paint shop at the southern end. At the time Western Hutt Road did not exist and the Railways Department owned all of the land up to the base of the hills. The workshops began expanding beyond the confines of the original station yard early in the 20th century. Some railway houses were located at the periphery to house workshop and station staff.


Operations

Petone assembled or maintained hundreds of locomotives and carriages. Seven "F", "L", and "J" class locomotives were rebuilt into other classes at Petone. The only locomotives built at Petone were three
NZR L class New Zealand Railways may refer to KiwiRail which is the current rail services owner/operator and infrastructure owner/maintainer. New Zealand Railways may also refer to the following companies: * New Zealand Railways Department (also known as New ...
in 1903; and E-66 in 1906, later derisively dubbed "Pearson's Dream". Perhaps some of the best-known locomotives to frequent the Petone Workshops were the H-class Fells used on the
Rimutaka Incline The Rimutaka Incline was a , gauge railway line on an average grade of 1-in-15 using the Fell system between Summit and Cross Creek stations on the Wairarapa side of the original Wairarapa Line in the Wairarapa district of New Zealand. The t ...
. From 1900 these locomotives were in need of new boilers and annual returns show that while this work was done there was one locomotive at a time at Petone undergoing major repairs leaving the other five locomotives to handle the traffic. Other changes made at the time included the fitting of steel Belpaire fireboxes, larger cabs with trapdoors in the roof, and a second funnel to separate the two exhausts (a change that was reverted several years later). This pattern of one of the six H-class locomotives at a time being at Petone (and later Hutt) for repairs seems to have been fairly standard, with annual returns showing this to be the case for most years. Petone was involved in the assembly of various experimental railcars following trials of an earlier type of railway carriage based on an idea from the United States. Due to the inadequacy of the types of motive power available at the time, these experiments were unsuccessful. The first railway carriage in service in the Wellington region was assembled at Petone in 1914 using bodywork built there and an
underframe An underframe is a framework of wood or metal carrying the main body structure of a railway vehicle, such as a locomotive, carriage or wagon. See also * Chassis * Headstock * Locomotive bed * Locomotive frame * Undercarriage Undercarriage is t ...
and traction equipment from Westinghouse Electric and Manufacturing Company. The power plant was a 6-cylinder petrol engine with a generator driving two electric motors, for a maximum speed of . It was to be used on the Johnsonville line with a trailer, but the grades proved to be too much for the car alone. After frequent mechanical difficulties, it was withdrawn in 1917. Another early petrol-electric railway carriage assembled at Petone entered service in 1916. It used bodywork manufactured at Petone; underframe, bogies and transmission from Thomas Transmission Ltd. of the United Kingdom; and a motor from J. Tyler and Sons. After a few months' service, a vital part broke and could not be replaced until after
World War I World War I (28 July 1914 11 November 1918), often abbreviated as WWI, was one of the deadliest global conflicts in history. Belligerents included much of Europe, the Russian Empire, the United States, and the Ottoman Empire, with fightin ...
. In 1920, when the replacement part arrived and the car was put back into service, it proved to be unreliable and was withdrawn in 1925. Three more railcars were constructed at Petone in 1925 and 1926. The 1925 model did not survive tests on the Hutt lines. It caused its passengers to experience an uncomfortable pitching motion, necessitating its withdrawal. The 1926 models were more like small motor busses on flanged wheels with an long body. They first saw service on the
Greytown Branch The Greytown Branch was a five-kilometre branch line railway off the Wairarapa Line at Woodside in the Wairarapa district of New Zealand's North Island. It followed an almost straight course over flat terrain. There were no intermediate st ...
before being transferred to the Glenham Branch and Switzers Branch where they were withdrawn in 1930. In the 1920s, workshops around the country were upgraded with electric power plants. Petone had been relying on a gas power plant, and this was replaced between 1925 and 1927 with electric motors.


Demise

A Royal Commission established in 1924 to examine the issue of railway workshop facilities around the country reported that much of Petone's machinery was out of date or obsolete, and that there were serious congestion problems owing to the lack of space for expansion. Following the recommendations of the Commission, the Railways Department embarked on a three-year programme of workshop upgrades in 1925. Two sites for a replacement facility were considered, at Tawa Flat and Woburn, with the latter option being selected. Eighty acres of land were set aside at a new industrial area behind Hutt Park for the new workshops. The Hutt Workshops were completed in 1929, resulting in the transfer of all functions from Petone to the new site and the closure of the Petone Workshops. Following closure the site was cleared of buildings, with some structures moved adjacent to the new workshops to form the NZR Road Services bus garage. The only Petone workshops building left standing on the site was a relatively new structure, erected in 1912. This building was finally demolished in 2012 to make way for the realignment of State Highway 2 through Petone.


Today

Construction of the Western Hutt Road, realignment of the Petone station yard, and neighbouring industrial, commercial and urban development have obliterated any sign of the workshops.


Footnotes


External links


An X class locomotive ex-Petone Workshops with a new superheated boiler c1928
* {{Coord, 41, 13, 22.94, S, 174, 51, 58.48, E, display=title Rail transport in Wellington Railway workshops in New Zealand Defunct railway workshops Demolished buildings and structures in New Zealand