The 1,320 megawatt Pakistan Port Qasim Power Project comprises two 660 megawatt supercritical
coal power A coal-fired power station or coal power plant is a thermal power station which burns coal to generate electricity. Worldwide, there are about 8,500 coal-fired power stations totaling over 2,000 gigawatts capacity. They generate about a th ...
plants, one of which was inaugurated in December 2016 as part of the
China–Pakistan Economic Corridor China–Pakistan Economic Corridor (CPEC) (; ur, چین پاکستان اقتصادی راہداری) is a collection of infrastructure projects that are under construction throughout Pakistan beginning in 2013. Originally valued at $47 billi ...
. The $2.09 billion project is located on 330.7 acres at Port Qasim, 37 kilometers east of
Karachi Karachi (; ur, ; ; ) is the most populous city in Pakistan and 12th most populous city in the world, with a population of over 20 million. It is situated at the southern tip of the country along the Arabian Sea coast. It is the former c ...
in
Sindh Province Sindh (; ; ur, , ; historically romanized as Sind) is one of the four provinces of Pakistan. Located in the southeastern region of the country, Sindh is the third-largest province of Pakistan by land area and the second-largest province ...
. The project is part of a group of 14 energy projects which fall under the fast-tracked "Early Harvest" program of the $46 billion
China Pakistan Economic Corridor China, officially the People's Republic of China (PRC), is a country in East Asia. It is the world's most populous country, with a population exceeding 1.4 billion, slightly ahead of India. China spans the equivalent of five time zones and ...
project. The plants were built on a "Build-Own-Operate" basis, and were constructed and will be operated by th
Port Qasim Energy Holding
a firm jointly financed by Qatar's Al-Mirqab Capital and
China's China, officially the People's Republic of China (PRC), is a country in East Asia. It is the world's most populous country, with a population exceeding 1.4 billion, slightly ahead of India. China spans the equivalent of five time zones and ...
Power Construction Corporation, a subsidiary of Sinohydro Resources Limited.


Project Details

The project consists not only of the power plants themselves, but also will include the construction of a jetty for exclusive use of the power plant for coal importation. The estimated annual coal consumption for the plants will be 4.66 million tons, and enough annual power for an estimated 3-4 million households will be generated. The plants each consist of one boiler, steam turbine and generator, and are fueled by sub-bituminous coal which is offloaded at the project's coal jetty. Electricity will be connected to the electric grid network
K-Electric Electric (KE) ( ur, ) (formerly known as Karachi Electric Supply Company / Karachi Electric Supply Corporation Limited) is a Pakistani investor-owned utility company based in Karachi. K-Electric is a privately owned and vertically-integrated e ...
via a 500 kilovolt AC transmission line. The plant's gross efficiency is equal to or greater than 41%, while the net efficiency is equal to or greater than 38%. Additionally, living quarters for up to 700 full-time workers were constructed at the site, with additional temporary housing facilities for 11,000 construction workers divided into a unit for 2,000 Chinese construction workers, and another unit for 9,000 Pakistani construction workers, with all construction materials for living quarters provided by Chinese manufacturers.


Coal Source

Most of the coal used for the power plant will be imported from
Indonesia Indonesia, officially the Republic of Indonesia, is a country in Southeast Asia and Oceania between the Indian and Pacific oceans. It consists of over 17,000 islands, including Sumatra, Java, Sulawesi, and parts of Borneo and New Guine ...
, with
South Africa South Africa, officially the Republic of South Africa (RSA), is the Southern Africa, southernmost country in Africa. It is bounded to the south by of coastline that stretch along the Atlantic Ocean, South Atlantic and Indian Oceans; to the ...
and Australia identified as suitable supplemental suppliers. Indonesia is identified as a primary source for its high quality coal, reliable production, and short transit times to Pakistan. Coal from Pakistan's own
Thar coalfield The Thar coalfield is located in Thar Desert, Tharparkar District of Sindh province in Pakistan. The deposits—16th-largest coal reserves in the world, were discovered in 1991 by Geological Survey of Pakistan (GSP) and the United States Agency f ...
was found to contain excessive amounts of sulfur and lime, and was not deemed to be of high enough quality for the project. The supply of reliable coal from the fields was also considered to be inadequate. Mixture of Pakistani indigenous coal with imported coal was also deemed to be unsuitable as it would decrease heat production from coal, and would compromise safety of the boilers which are to be used in the project.


Construction and Operation

Construction commenced in May 2015, and the first unit inaugurated in December 2017. The plants were built on a "Build-Own-Operate" basis, and is to be operated by th
Port Qasim Energy Holding
a firm jointly financed by Qatar's Al-Mirqab Capital and
China's China, officially the People's Republic of China (PRC), is a country in East Asia. It is the world's most populous country, with a population exceeding 1.4 billion, slightly ahead of India. China spans the equivalent of five time zones and ...
Power Construction Corporation, a subsidiary of Sinohydro Resources Limited.


Financing

Al-Mirqab Capital will own a 49% stake in the project, and while Power Construction Corporation, which will own a 51% stake in the project. The individual companies will invest $521 million, while the
Exim Bank of China The Export–Import Bank of China (Chexim - China Exim Bank) () is one of two institutional banks in China chartered to implement the state policies in industry, foreign trade, economy, and foreign aid to other developing countries, and provi ...
will lend those companies the remaining $1.56 billion required for construction.


Tariff

The Government of Pakistan will be contractually obliged to purchase electricity from the plants for thirty years at a cost of 8.12 US cents per unit.


Commissioned

In November 2017, the first 660MW unit of the power plant was synchronised to the national grid. The power plant was completed and commenced full operations on April 25, 2018.


See also

*
List of power stations in Pakistan Pakistan has a total installed power generation capacity of 43,775 MW as on 30 June 2022. Which includes 26,683 MW thermal, 10,635 MW hydroelectric, 1,838 MW wind, 530 MW solar, 369 MW bagasse and 3,620 MW nuclear. Thermal In service Currentl ...