Operational bills are a
tendering An invitation to tender (ITT, otherwise known as a call for bids or a request for tenders) is a formal, structured procedure for generating competing offers from different potential suppliers or contractors looking to obtain an award of business ...
document for
estimating Estimation (or estimating) is the process of finding an estimate or approximation, which is a value that is usable for some purpose even if input data may be incomplete, uncertain, or unstable. The value is nonetheless usable because it is der ...
costs prepared by
architects An architect is a person who plans, designs and oversees the construction of buildings. To practice architecture means to provide services in connection with the design of buildings and the space within the site surrounding the buildings that h ...
that describes a
construction Construction is a general term meaning the art and science to form Physical object, objects, systems, or organizations,"Construction" def. 1.a. 1.b. and 1.c. ''Oxford English Dictionary'' Second Edition on CD-ROM (v. 4.0) Oxford University Pr ...
project in terms of the operations (which include
labour Labour or labor may refer to: * Childbirth, the delivery of a baby * Labour (human activity), or work ** Manual labour, physical work ** Wage labour, a socioeconomic relationship between a worker and an employer ** Organized labour and the labour ...
and plant) needed to build it. This form of document contrasts with that of bills of quantities in which such tendering and estimation is limited to the
materials Material is a substance or mixture of substances that constitutes an object. Materials can be pure or impure, living or non-living matter. Materials can be classified on the basis of their physical and chemical properties, or on their geolog ...
in the completed work. Operational bills have the advantages of enhancing communication between design and production, enabling realistic tender pricing, and making the preparation of critical-path analysis easy for the contractor.Skoyles, E. R. (1966) Examples from operational bills Skoyles, E. R. (1967) Preparation of an operational bill. Building Research Station Operational bills were proposed and developed by Edward Skoyles at
Building Research Establishment The Building Research Establishment (BRE) is a centre of building science in the United Kingdom, owned by charitable organisation the BRE Trust. It is a former UK government national laboratory that was privatised in 1997. BRE provides resear ...
in the 1960s. Priced-activity schedules of the
NEC Engineering and Construction Contract The New Engineering Contract (NEC), or NEC Engineering and Construction Contract, is a formalised system created by the UK Institution of Civil Engineers that guides the drafting of documents on civil engineering, construction and maintenance proj ...
are a modern related form, prepared by the contractor. Potts, K. (2008). Construction Cost Management: Learning from Case Studies, Routledge.


Creation

An operation is defined as a piece of construction work which can be carried out by a gang of operatives without interruption from another gang. A procedure diagram is provided that shows the relationship of operations to each other and so which are done in sequence and which are done in parallel. This allows a critical-path analysis to be quickly created by the contractor. There are two sections: the first deals with site operations in terms of schedules of materials, labour and plant requirements, and the second, any work prefabricated adjacent or off site. At the end of the bill, management and plant resources are given so they are included.


History

After operational bills were proposed, a second half-way house version with bills of quantities was suggested initially called "activity bills", but then as "Bills of quantities (operations)". In this, the operations are described in terms of the rules of the standard method of measurement rather than labour and materials. A further development was the use of the principles of operational bills in the priced-activity schedules of the
NEC Engineering and Construction Contract The New Engineering Contract (NEC), or NEC Engineering and Construction Contract, is a formalised system created by the UK Institution of Civil Engineers that guides the drafting of documents on civil engineering, construction and maintenance proj ...
.


Advantages and disadvantages


Advantages

* Separates the costs of labour, materials and plant thus enabling cost control.Ashworth, A. (2002). Pre-contract studies: development economics, tendering and estimating. Edition: 2. Wiley-Blackwell. p.332. * Increases the accuracy of estimating.Lal H. (2002). Quantifying and Managing Disruption Claims. Thomas Telford. .Dmaidi, N. (2003)
The State of the Art in Integration of Cost and Time Models
. An-Najah University Journal of Research. 17(1). 99-122. pp. 108-109
* Costs can be related to factors that directly determine them such as overall plant usage. * Allows the reuse of information created in estimating for project management. * Enables better estimation of variation in works.


Disadvantages

* Bulky and costly to produce so increasing the work of the contractor’s estimators. * Radically changes the estimating process. * Does not fit in with current contracts in regard to work variation. * It needs computers to allow rapid manipulation of the data: this did not exist when it was originally proposed.Jaggar D. Ross A. Smith J. Love P. (2002). Building Design Cost Management. Edition: 2. Wiley-Blackwell. pp147-148 * The design team responsible for creating the operational bill need not be "very familiar with the buildability issues as they affect the construction process".


See also

*
Bill of materials A bill of materials or product structure (sometimes bill of material, BOM or associated list) is a list of the raw materials, sub-assemblies, intermediate assemblies, sub-components, parts, and the quantities of each needed to manufacture an end ...
*
Bill of quantities A bill of quantities is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized. It also (ideally) details the terms and conditions of the construction or repair contract and ite ...
*
Construction bidding Construction bidding is the process of submitting a proposal ( tender) to undertake, or manage the undertaking of a construction project. The process starts with a cost estimate from blueprints and material take offs. The tender is treated as an ...
* Design-bid-build tender phase


References

{{DEFAULTSORT:Operational Bill Construction documents Procurement